MUNDORO ANNOUNCES Q1-2020 EXPLORATION AND CORPORATE REPORT

May 22, 2020 Vancouver, BC - Mundoro Capital Inc. (TSXV: MUN, www.mundoro.com ) ("Mundoro" or

the "Company"), is pleased to report its quarterly update for exploration and corporate activity for the

three months ending March 31, 2020. The Company has filed its quarterly Consolidated Financial

Statements and Management’s Discussion and Analysis on SEDAR at www.sedar.com and post ed on the

Company’s website at www.mundoro.com.

Mundoro’s Objectives for 2020

• Commence exploration on the Vale-Mundoro JV Projects in the second half of 2020.

• Add partner(s) for Mundoro’s projects available for optioning.

• Enter into exploration contract for the Svoboda project with the local government.

Corporate and Business Development

Mundoro continues to have discussions with interested third parties regarding Mundoro’s projects which

are available for optioning , confirming the continued interest in exploring in Timok, Serbia as well as

Bulgaria.

Savinac and Bacevica

The two licenses, Savinac and Bacevica, previously part of the Freeport earn-in from October 2018 to April

2020, have reverted 100% to Mundoro for no consideration . Freeport informed Mundoro that it is

restructuring its exploration programs and accordingly terminated their earn-in. Mundoro has since then

set up a data room, signed confidentiality agreements and engaged in due diligence with third parties.

Freeport sole funded a total of US$3.2 million (C$4.5 million) on these two licenses, therefore the current

term work commitments for the licenses have been met. N o further exploration expenditures are

required to maintain the licenses while Mundoro continues discussions with third parties.

Vale-Mundoro Projects

For the Vale -Mundoro Projects, compiled data sets are being reviewed for targeting and expl oration

planning. The parties await government approvals before exploration activity can be commenced.

JOGMEC-Mundoro JV Project

To date, JOGMEC has sole funded a total of US$5.8 million (C$8. 2 million) for the JOGMEC -Mundoro JV

Project, and has completed the earn-in for a 51% interest in the project. All work commitments have been

met for the JOGMEC -Mundoro JV Project during this term. The joint venture is now at a proportionate

funding stage, with Mundoro entitled to exercise an option to acquire a 2% interest in the joint venture

from JOGMEC (taking Mundoro to 51%) for nominal consideration and maintain its role as the operator.

The JV Partners are discussing alternatives for further funding and exploration at Borsko. A data room for

the project has been opened for interested third parties which have signed a confidentiality agreement

with the Company.

Zeleznik

A data room for the Zeleznik project has been opened for interested third parties which have a confidentiality

agreement signed with the Company.

Generative

The Company has several areas under application in Serbia and Bulgaria as a result of the Company’s

generative programs in these two jurisdictions.

Financial Highlights and Initiatives to Manage Costs

• Earn-in parties funded exploration costs totaled $1,230,158 and operator fees earned totaled

$108,636. Mundoro funded exploration costs for generative programs totaled $136,916.

• Corporate expenses totaled $98,839, versus $120,346 in 2019.

• At March 31, 2020, Mundoro had a treasury position of $3.1 million and no debt.

• During ongoing global impacts to commerc e as a result of the COVID -19 health pandemic, the board

of directors and management considers it prudent for the Company to take steps to reduce non -

essential expenditure pending a return to normal business conditions. The initiatives below are

expected to result in cash preservation for 2020 whilst they are in effect:

o Capital expenditures that are not essential to support ongoing exploration programs have been

reduced or deferred, and

o Corporate and marketing expenditures have been reduced.

Summary of Completed Drill Programs in Q1-2020

Savinac and Bacevica, Timok, Serbia (Available for Option)

In Q1-2020, Mundoro completed the target testing drill program at the Savinac and Bacevica exploration

licenses in the Timok Magmatic Complex (“Timok”) in eastern Serbia. The two licenses are located within

the southern portion of Timok, one of the most prolific metallogenic domains in the Tethyan Belt with

deposits such as the Cukaru -Peki, the Bor copper porphyry underground mine and the Veliki Krivelj

copper-gold porphyry open-pit mine (Figure 1 and 2).

Following the results from the initial drilling program carried out between October 2018 – February 2019,

as well as based on results from the completed alteration mapping and geophysical surveys, a second

drilling campaign was initiated i n October 2019. T otal drilling was originally planned for a 3,500 -meter

program and increased to a total of 8,735 meters. The three-drill rig program tested four of the five target

areas between October 2019 and February 2020 (see Figure 3 and 4). The fifth target to be tested, Markov

Kamen, was scheduled to commence in March 2020 but the program was suspended due to restrictions

related to the COVID-19 pandemic.

Tilva Rosh (Savinac License)

• The Tilva Rosh target is a large area of zoned argillic to advanced argillic alteration containing

epithermal gold mineralization cropping out at surface as observed through trench sampling by

Mundoro in 2013 which returned 12 m of 30 g/t gold and 171 g/t silver (see Figure 3 ).

Interpretation of prior drilling suggests the epithermal mineralization is proximal to a copper-gold

porphyry system.

• The target is characterized by: a large 3.5 km x 1 km alteration zone at surface, which correlates

laterally with an Induced Polarization (“IP”) chargeability-high. Beneath the IP chargeability high

and resistivity high, remains an untested intermediate to low CSAMT/NSAMT resistivity anomaly.

• Interpretation models from both the IP -Resistivity and CSAMT/NSAMT were combined with

additional layers of data to select targets for follow up drilling.

• Drilling commenced in October 2019 whic h drilled a total of 2,980 meters over 4 drill holes.

Results of note are in Table 1.

• Signs of nearby porphyry system were found in the drill holes through observations of : minor

banded quartz-specularite, center parting quartz-pyrite “B” veins, and pyritic “D” veins.

• Zoned alteration pattern was recognized in drill holes FMSC19008 and FMSC20018 completed in

the central portion of the target.

o Core of inner propylitic alteration, presented by remnants of patchy hydrothermal

magnetite and traces of chalcopyrite mineralization was observed in drill hole FMSC19008

rimed by a halo of phyllic alteration (sericite-chlorite-quartz). The inner propylitic

alteration appears open and down plunging to the west. The advanced argillic alteration

and gossano texture mapped at surface was confirmed in the first 200 m of drill hole

FMSC19008, right above the phy llic and the inner propylitic zones with elevated copper

of 700-800 ppm Cu.

o Drill hole FMSC20018 (east of FMSC19008) was drilled into dominantly argillic alteration

and thereafter entered an epidote-rich zone which suggests outward alteration zoning to

the east. Therefore, the drill hole was terminated.

o The area 500 m to the west of recent drill hole FMSC19008, as well as to the north and

south, all along the mapped 3.5 km of strong argillic to advanced argillic alteration zone,

remain open for further drill testing based on the drill core review which is also supported

by the geophysical and geochemical data.

• Broad zone of alteration and veining over several kilometers suggest that the Tilva Rosh target

has potential to host a significant porphyry system.

Markov Kamen (Savinac License)

• The Markov Kamen target is an epithermal target identified by several copper -gold-in-soil

geochemical anomalies related to 4 km x 1.2 km zone of argillic and advanced argillic alteration

located 2 km south of the Tilva Rosh target (see Figure 3).

• Five drill holes completed from previous programs at Markov Kamen intersected hydrothermal

breccia and vuggy silica, signs of high -sulphidation type epithermal mineralisation controlled by

northwest structures. Measured contacts to the country rock suggest the epithe rmal

mineralization remains open towards the west.

• Markov Kamen target is characterized by narrow IP anomalies that coincide spatially with narrow

magnetic susceptibility low and intermediate resistivity anomalies. At depth, beneath the IP high

anomaly, large intermediate resistivity CSAMT /NSAMT anomalies are observed associated with

altered volcanic rocks.

• The priority target for drill testing is around drill hole FMSC19007 , which is located in Markov

Kamen South. This drill hole returned 36.0 m of 0.19% copper, 0.25 g/t gold starting at 65 meters,

related to quartz-pyrite -sphalerite-galena-chalcopyrite veins, and 35.6 m of 0.17% copper, 0.16

g/t gold starting at 138.4 met ers, related to black sulfides and chalcopyrite, among silicified

breccia bodies.

• During this drill program, drilling did not commence at this target as the Company was awaiting

permits from the Forestry Department and thereafter the decision was made to terminate drilling

due to the COVID-19 related restrictions.

• The Markov Kamen target requires further drill testing.

Prekostenski (Bacevica License)

• Copper-gold porphyry target identified by mapping and surface sampling which resulted in 55 m

of 0.28 g/t gold and 0.21 % copper. The exploration work identified chalcopyrite-magnetite

mineralisation hosted in potassic altered diorite at surface (see Figure 2 and 4).

• One drill hole from 2018 confirmed the extension of the surface mineralisation to a depth of 68.6

m. Quartz-pyrite-chalcopyrite veins were observed hosted in K -Feldspar altered diorite porphyry

and returned an intercept of 49.8 meters of 0.14 g/t gold and 0.13 % copper from surface.

• Drilling commenced in November 2019 which has drilled a total of 2887 meters over 6 drill holes.

Best results were obtained from drill hole FMSC19013 that returned:

o 13.5m of 0.14% copper, 0.11 g/t gold from 34 meter and,

o 69.0 m of 0.14% copper, 0.19 g/t gold from 75 meter, both within much larger anomalous

interval of 152m of 0.11% copper and 0.12 g/t gold from 20.0m depth . Results of note

are (Table 1).

• Drilling confirmed copper -gold porphyry system at Prekostenski related to sub -vertical diorite

porphyry with quartz stockwork veining. Late faulting plays a role to displace the system making

difficult to understand the directions and controls of the mineralization at that stage.

• Late diatreme (pebble dike) contains quartz stockwork porphyry clasts intersected next to the

diorite porphyry suggesting undiscovered mineralisation at depth and around.

• Four additional drill targets have been interpreted within the property area and require further

drilling to test the conceptual model.

Orlovo Brdo (Bacevica License)

• This target is a broad zone of phyllic alteration of 3 ,000 m x 700 m with gold and copper

anomalism (see Figure 2 and 4).

• Our drill hole from the 2018 drill program, intersected a zone of quartz vein stockwork

mineralization related to potassic altered diorite from a depth of 458 m, returning 26 m of 0.10%

Cu and 0.23 g/t Au, overlain by strong phyllic alteration from surface.

• In 2019 the geophysics completed identified the target has high IP anomalies coincident with

resistivity and magnetic susceptibility anomalies.

• After completion of geophysics, drilling commenced in November 2019 whic h drilled a total of

2,325 meters over 4 drill holes. The drill program was designed to define the down-dip extension

and the geometry of the quartz-veined zone intersected in the drill hole from 2018. The zone was

confirmed in holes FMSC19012 and FMSC19015, as well as in FMSC20020 to a depth of 793.8 m

when the drill hole was abandoned due to technical difficulties.

• Drilling confirmed a porphyry copper-gold system with quartz veining, remnants of distal potassic

alteration and at least two porphyry phases. The system remains open to north -northwest and

northeast as supported by the drilling results and the soil Cu-Au anomalies.

• Further drilling was planned to test for the continuation of veining, stronger potassic al teration

and increasing of copper-gold grades at Orlovo.

• This target requires further drill testing.

D-Vein (Bacevica License)

• This target covers an area of 1,000 m x 500 m of phyllic, argillic and advanced argillic alteration,

located 2.3 km south-southeast of the Orlovo Brdo target (see Figure 2 and 4). Adjacent to this

zone, there are copper-gold mineralized D-veinlets, that could represent the top or lateral portion

of a porphyry system. Mapping and rock sampling of the veins returned 2% copper and 7.2 g/t

gold in grab samples.

• The target is characterized by north-south trending IP high anomaly from surface to 650 m. The

IP anomaly appears on either side (to the west and to the east respectively ) of a sharp resistivity

contact interpreted as a north-south trending fault.

• Drilling commenced in November 2019 which drilled 542 meters in one drill hole. Drill hole

FMSC19009 targeted the depth extension of the mapped D-veinlets on surface which correlate

with the IP chargeability high and the resistivity high/low contact.

• Although, the continuation of outcropping D -veinlets was not confirmed at depth with this drill

hole, the conclusion from the drill program is that further exploration and targeting is needed to

understand the controls of the veins and their relation to a possible porphyry source.

Table 1: Drill Hole Summary Results

Drill

hole ID

Azimuth Dip Total

Depth

(m)

From

(m)

To

(m)

Interval

(m)

Copper

(%)

Gold

(g/t)

CuEq*

(%)

AuEq*

(g/t)

Tilva Rosh Target (Figure 3)

FMSC

19008

90 -60 738.0 194.5 197.0 2.5 0.17 0.04 0.20

496.6 499.4 2.8 0.04 0.29 0.24 0.34

513.1 516.1 3.0 0.11 0.17 0.23 0.33

FMSC

19010

90 -60 1116.0 33.0 35.0 2.0 0.24 0.00 0.25

620.0 622.0 2.0 0.22 1.21 1.07 1.52

640.0 642.0 2.0 0.02 0.21 0.17 0.25

746.0 748.0 2.0 0.23 0.01 0.24

FMSC

19014

90 -80 574.5 90.0 93.4 3.4 0.13 0.04 0.26

108.0 124.0 16.0 0.15 0.06 0.19

344.0 347.0 3.0 0.01 0.37 0.27 0.38

FMSC

20018

90 -60 552.0 16.0 19.0 3.0 0.01 0.32 0.24 0.33

314.0 317.0 3.0 0.16 0.11 0.24

393.4 398.5 5.1 0.04 1.67 1.22 1.73

Prekostenski Target (Figure 4)

FMSC

19011

210 -65 158.5 20.00 114.00 94.0 0.10 0.09 0.17

61.50 85.50 24.0 0.20 0.20 0.34 0.49

93.50 104.00 10.5 0.13 0.07 0.19

FMSC

19013

260 -60 302.0 20.00 172.00 152.0 0.11 0.12 0.20

34.00 47.50 13.5 0.14 0.11 0.22

75.00 144.00 69.0 0.14 0.19 0.28 0.40

160.00 172.00 12.0 0.12 0.19 0.26 0.37

FMSC

19016

340 -65 529.7 448.4 459.6 11.2 0.12 0.15 0.23

FMSC

20019

340 -65 521.3 No significant intercepts

FMSC

20021

180 -60 893.3 No significant intercepts

FMSC

20022

180 -60 482.7 No significant intercepts

Orlovo Target (Figure 4)

FMSC

19012

85 -60 492.5 0.0 31.0 31.0 0.02 0.14 0.13 0.18

82.0 103.0 21.0 0.03 0.14 0.14 0.19

196.0 228.0 32.0 0.06 0.18 0.19 0.26

196.0 212.0 16.0 0.06 0.23 0.19 0.27

253.0 283.0 30.0 0.04 0.14 0.14 0.20

FMSC

19015

45 -60 473.6 3.1 24.0 20.9 0.03 0.15 0.14 0.19

54.7 60.0 5.3 0.03 0.14 0.13 0.18

115.0 119.0 4.0 0.02 0.12 0.11 0.15

127.0 131.0 4.0 0.02 0.19 0.15 0.22

201.0 314.0 113.0 0.05 0.15 0.16 0.22

201.0 209.8 8.8 0.04 0.14 0.14 0.20

216.6 289.0 72.4 0.07 0.18 0.20 0.28

216.6 230.5 13.9 0.11 0.27 0.30 0.43

239.3 250.0 10.7 0.09 0.31 0.31 0.44

260.0 289.0 29.0 0.07 0.19 0.20 0.29

308.0 314.0 6.0 0.03 0.11 0.11 0.15

320.0 328.0 8.0 0.03 0.11 0.11 0.15

FMSC

19017

0 -70 563.5 21.5 28.0 6.5 0.03 0.16 0.14 0.20

34.0 49.0 15.0 0.02 0.17 0.14 0.20

74.0 85.0 11.0 0.03 0.19 0.16 0.23

144.0 165.0 21.0 0.05 0.14 0.15 0.21

194.6 201.5 6.9 0.02 0.16 0.13 0.19

307.7 311.0 3.3 0.02 0.22 0.18 0.25

378.0 381.0 3.0 0.01 1.02 0.73 1.03

FMSC

20020

20 -50 795.8 37.0 46.0 9.0 0.02 0.15 0.13 0.18

78.9 82.9 4.0 0.03 0.51 0.39 0.55

183.0 189.0 6.0 0.02 0.17 0.14 0.20

248.0 298.0 50.0 0.04 0.13 0.13 0.19

320.6 372.0 51.4 0.04 0.14 0.14 0.20

601.0 604.0 3.0 0.41 0.23 0.57

D-Vein Target (Figure 4)

FMSC

19009

270 -60 542.0 7.3 8.6 1.4 1.29 6.76 6.05 8.60

*Copper equivalent (CuEq%) is calculated using the formula CuEq = (%Cu) + [(g/t/AuEq) x (1/31.1035) x ($/oz Au)] ÷

[(22.0462) x ($/lb Cu)]. Metal prices used are: gold price of US$1,357/oz, copper price of US$2.81/lb, the average of

the last three years period. All thicknesses from intersections from drill holes are down -hole drilled thicknesses and

not true widths.

Zeleznik, Timok, Serbia (Available for Option)

Mundoro completed a 450-meter drill program in March 2020 at the Zeleznik group of licenses which are

100% owned by the Company and available for optioning. Zeleznik is directly north of the Majdanpek

mine at the north end o f the Timok district (see Figure 1). The drill program was designed to test the

southern extension of the East Zone by 200 m to the south with two inclined drill holes. After the state

of emergency related to COVID-19 is lifted in Serbia, the Company wil l send samples to the assay lab. In

the meantime, the exploration team is completing detailed logging, core photo collection along with XRF

analysis and alteration analysis. The Company expects to be able to report assay results in Q2-2020.

Drilling, Sampling, Analysis and Quality Assurance and Control

The drilling technique was triple tubed diamond drilling from surface for PQ and HQ, while for NQ was

double tubed. The drill holes were generally cased from surface progressing from PQ to HQ at 260 m on

average, however exact depths vary from hole to hole. Drill hole orientations were surveyed at 30 meters

intervals. Drill core was oriented using the Reflex EZ -Trac tool, the bottom of oriented core was marked

by the drillers and this was used for marking the whole drill core with reference lines. Company personnel

monitored the drilling, with drill core delivered daily to the Company’s core storage facility where it was

logged, cut and sampled.

Core recovery was measured and recorded continuously from the top to the end of the hole for every drill

hole. Each run of 3m length was marked by plastic core block which provided the depth drilled. Core

recovery is recorded as 96.3-100% in most intervals.

The drill core was sawn into quarter for PQ diameter and into two for HQ and NQ diameter, along drill

core orientation line using a core-cutter and left half looking downhole was collected in bag and submitted

for analysis, the other half is kept in tray and stored. Samples were collected at three-meter lengths from

mineralised intervals and three to five-meter lengths from non-mineralised intervals with brakes for major

geological changes. The samples were submitted to ALS Prep Laboratory in Bor, Serbia, for sample

preparation and then internally submitted to ALS Romania and ALS Ireland for analysis. The samples were

fine crushed to 2mm with 70% pass, split by rotary splitter to produce 1000 g sub -sample which was

pulverized with 85% passing 75 um using. The samples were assayed using 50 grams charge for Au -fire

assay with AES finish and multi -element method ME -MS61 – 48 element four acid ICP -MS. Samples

returned above > 3 ppm Au, >1% Cu, >1% As and >100 ppm Ag were additionally analyzed with method

OG62.

In addition to the laboratory’s internal QA/QC procedures, the Company conducted its own QA/QC with

the systematic inclusion of certified reference materials every 20 and 30 samples, blank samples every 50

samples, field duplicates every 50 samples, crush duplicates every 50 samples and pulp duplicates at every

50 samples.

Qualified Person

Technical information contained in this Press Release has been reviewed and approved by Mr. G.

Magaranov, P. Geo., Qualified Person as defined by National Instrument 43-101.

About Mundoro Capital Inc.

Mundoro is a Canadian listed (TSX-V: MUN) precious and base metal company focused on building value

for its shareholders through directly investing in mineral projects that have the ability to generate future

returns for shareholders. Mundoro has generated an attractive mineral project pipel ine in Serbia and

Bulgaria, as well as an investment in a producing gold mine in Bulgaria, in order to drive long-term growth

and achieve shareholder return. Potential future returns for our shareholders from our mineral properties

can be in various forms such as discovery of mineral resources, royalties, advance royalty payments from

partners, an interest in production, dividend payments or sale of our interest in the mineral property.

Caution Concerning Forward-Looking Statements

This News Release contains forward-looking statements. Forward-looking statements can be identified by

the use of forward -looking words such as "will", "expect", "intend", "plan", "estimate", "anticipate",

"believe" or "continue" or similar words or the negative thereof, and include the following: completion of

the earn-in expenditures and options by JOGMEC; and completion of a definitive joint venture agreement

by the parties. The material assumptions that were applied in making the forward looking statements in

this News Releas e include expectations as to the mineral potential of the Timok North Properties, the

Company's future strategy and business plan and execution of the Company's existing plans. We caution

readers of this News Release not to place undue reliance on forward looking statements contained in this

News Release, as there can be no assurance that they will occur and they are subject to a number of

uncertainties and other factors that could cause actual results to differ materially from those expressed

or implied by such forward -looking statements. These factors include general economic and market

conditions, exploration results, commodity prices, changes in law, regulatory processes, the status of

Mundoro's assets and financial condition, actions of competitors and the ability to implement business

strategies and pursue business opportunities. The forward -looking statements contained in this News

Release are expressly qualified in their entirety by this cautionary statement. The forward -looking

statements included in this News Release are made as of the date of this News Release and the Board

undertakes no obligation to publicly update such forward-looking statements, except as required by law.

Shareholders are cautioned that all forward-looking statements involve ris ks and uncertainties and for a

more detailed discussion of such risks and other factors that could cause actual results to differ materially

from those expressed or implied by such forward-looking statements, refer to the Company's filings with

the Canadian securities regulators available on www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Figure 1 – Project Location Map in Timok

Notes: 1. Third party resources estimate s based on those reported by RTB Bor Group. Resources reported according to Russian

classification system. 2. Nevsun Resources Inc - NI 43-101 Technical Report on SEDAR. Mineralization hosted on adjacent and or

nearby properties is not necessarily indicative of mineralization hosted on the Company’s properties.

Figure 2 – Savinac and Bacevica - Target Area Locations