Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MSR.V ·

Minsud reports 202m at 0.70% CuEq at the Chita Valley Project; confirms the presence of a porphyry system at depth

Drill Results

TSX-V: MSR

August 26, 2021

Minsud reports 202m at 0.70% CuEq at the Chita Valley Project;

confirms the presence of a porphyry system at depth

TORONTO, ONTARIO – Minsud Resources Corp. (TSX-V: MSR) (“Minsud” or the “Company”), is

pleased to announce receipt of assay results from the initial five (5) drillholes completed in the ongoing

Phase 3 program over the Chinchillones area, at Chita Valley Project, San Juan province, Argentina.

Encouraged by the results to date and advantageous location of the project, the Company continuously

drilled through the winter period and plans to expand the current program towards second half of 2021.

Fourteen (14) drillholes were completed to date th is year encompassing a total of 6,150 metres.

Highlights are listed below, along with accompanying figures.

 CHDH21-23 returned 202m at 0.70% CuEq from 148m (0.13% Cu, 0.77% Zn, 22 g/t Ag) including

a higher-grade section of 36.05m at 1.12% CuEq from 271m to 307.05m (0.24% Cu, 47.18 g/t Ag,

0.94% Zn). This drill, oriented SSE, dipping 65° and 707m depth, went below the main resurgent

dome and intersected several lithologies affected by intense sericitic alteration with strong

secondary silica-sulfide zones. Sulfide mineralization averages 1-3 vol% and consists of veined

and disseminated pyrite-chalcopyrite. The principal mineralization is hosted in hydrothermal

breccias and intermediate sulphidation veins of sphalerite –galena– chalcopyrite.

The porhyry affiliation is supported by the 84m from 598m to 682 m at 0.35% CuEq (0.17% Cu,

0.14 g/t Au, 4.77 g/t Ag, 85 ppm Mo) characterized by increased molybdenite and chalcopyrite both

in veins and as disseminations in porphyry host rocks.

This drill hole, together with CHDH20-04 and CHDH20-05 (Phase 1 – see Press Release dated

June 23, 2020) and CHDH20-17 (Phase 2 – see Press Release dated February 5, 2021 ) support

the presence of a porphyry system at depth with linkage to shallow polymetallic Cu-Au-Pb-Zn

mineralization.

 CHDH21-21 returned 41m at 0.70% CuEq from 19m to 60m (0.36% Cu, 0.28 g/t Au, 11.24 g/t Ag,

513 g/t Pb, 0.13% Zn). This drill hole is located 100m to the West of CHDH21-23, oriented NNW,

dipping 75° and with 378m depth. This interval includes higher-grade vein structures with up to

1.73% Cu and 1.6% Zn hosted in hydrothermal breccias, dacitic and dioritic porphyries. The

intervals of higher-grade mineralization coincide with demonstrable strong quartz sericite alteration

superposed on a porphyry hosting distinctive porphyry related veins (A-B-D type veins).

 CHDH21-22 Intersected 32m at 0.37% CuEq from 62m to 94 m (0.13% Cu, 0.06 g/t Au, 7.86 g/t

Ag, 0.11% Pb, 0.25% Zn). This drill hole is located 100m from CHDH21-21, with a NNW heading,

dipping 75° and with 318m depth. It goes through porphyry rocks and phreatic hydrothermal

breccias.

Thus, the results so far support continuous polymetallic mineralization (Pb-Ag-Zn-Cu-Au), affiliated with

porphyry Cu-Mo mineralization, occurring in a >2km-long, at least 250m-wide NNE-striking zone. The

potential for a large porphyry copper-molybdenum system in the Chinchillones area is interpreted here

to remain open to the south and at depth.

The drill confirmed higher-grade zones correspond to discrete phreatic hydrothermal breccia bodies

traversing the porphyry mineralization, indicating telescoping / hydrothermal collapse of the magmatic

system. The presence of multiphase intrusion is thought to indicate cluster of porphyry centers as valid

exploration targets.

Ramiro Massa, Minsud’s President & CEO, commented: “The initial results of this Phase 3 ongoing drill

program are very encouraging and confirmed the expanded footprint of Zn-Pb-Ag-Cu mineralization

affiliated with porphyry bodies over the Chinchillones area. We look forward to receiving the balance of

pending geochemical results as well as continuing our drill program at the Chita Valley Project”.

PHASE III: Chinchillones Diamond Drilling Program – Summary of Analytical Results %

Hole ID From To Length Au Ag Cu Mo Pb Zn Zn Eq

(**)

Cu Eq

(***) (m) (m) (m) (*) g/t g/t % ppm ppm ppm

CHDH21-19 41 48 7 0.02 2.00 0.20% 42 37 60 0.80% 0.25%

101 105 4 0.02 3.77 0.23% 1 97 336 0.91% 0.29%

CHDH21-20 96 99 3 0.26 1.79 0.05% 29 20 115 0.81% 0.25%

CHDH21-21 19 60 41 0.28 11.24 0.36% 8 513 1253 2.23% 0.70%

incl. 34 35 1 0.27 21.60 1.73% 16 7180 15900 8.85% 2.80%

64 69 5 1.59 12.17 0.50% 2 177 519 5.41% 1.71%

incl. 68 69 1 1.60 37.10 1.66% 4 522 1700 9.94% 3.15%

CHDH21-22 45 48 3 0.21 39.27 0.55% 93 2951 778 3.75% 1.19%

62 94 32 0.06 7.86 0.13% 40 1097 2509 1.16% 0.37%

incl. 66 68 2 0.22 13.55 1.15% 17 904 3650 4.96% 1.57%

214 217 3 0.22 18.94 0.07% 51 138 734 1.40% 0.44%

CHDH21-23 41 52 11 0.14 10.92 0.50% 19 717 348 2.31% 0.73%

Inc 50 52 2 0.24 24.20 1.59% 39 831 768 6.42% 2.03%

148 350 202 0.09 21.99 0.13% 26 2152 7700 2.20% 0.70%

incl. 158 159 1 0.44 105.00 0.30% 11 3780 33800 8.58% 2.71%

incl. 189 204 15 0.11 36.83 0.09% 15 3779 7925 2.70% 0.85%

incl. 216 266 50 0.06 15.19 0.10% 41 2757 10015 2.17% 0.69%

incl. 271 307 36 0.09 47.18 0.24% 18 3336 9418 3.54% 1.12%

598 682 84 0.14 4.77 0.17% 85 57 290 1.12% 0.35%

(*) Intervals reported in the above table are not true thicknesses

(**) ZnEq% formula is defined as: Zn(%)+[Cu(%)*Cu price (lb)/Zn price (lb)]+[Ag(%)*Ag price (lb)/Zn price

(lb)]+[Au(%)*Au price (lb)/Zn price (lb)]+ [Pb(%)*Pb price (lb)/Zn price (lb)]+[Mo(%)*Mo price (lb)/Zn price (lb)]

(***) CuEq% formula is defined as: Cu(%)+[Zn(%)*Zn price (lb)/Cu price (lb)]+[Ag(%)*Ag price (lb)/Cu price

(lb)]+[Au(%)*Au price (lb)/Cu price (lb)]+ [Pb(%)*Pb price (lb)/Cu price (lb)]+[Mo(%)*Mo price (lb)/Cu price (lb)]

Copper equivalent (CuEq) and Zinc equivalent (ZnEq) grades are for comparative purposes only. Calculations are

uncut and recovery is assumed to be 100% as no metallurgical data is available.

Quality Assurance/Quality Control

All core samples were submitted to the ALS Global Laboratories in Mendoza, Argentina for preparation

and analysis. All samples were analyzed for Au by fire assay/ AA finish 50g, plus a 48-element ultra-

trace four acid digest with ICP-MS and ICP-AES finish. Minsud followed industry standard procedures

for the work with a quality assurance/quality control (QA/QC) program. Field duplicates, standards and

blanks were included with all sample shipments to the principal laboratory. Minsud detected no

significant QA/QC issues during review of the data.

Mr. Mario Alfaro, Professional Geoscientist, VP-Explo ration of the Company, is a qualified person as

defined by Canadian National Instrument 43-101. Mr. Alfaro visited the property and has read and

approved the contents of this release.

About the Chita Valley Project, San Juan Province:

The Chita Valley Project is a large exploration sta ge porphyry system with classic alteration features,

widespread porphyry style Cu-Mo-Au and polymetallic Ag-Pb-Zn mineralization hosted by

Hydrothermal Phreatic Breccias and associated gold and silver-bearing polymetallic veins of

intermediate sulfide composition that conformed an outcropping porphyry system at Chita and a

lithocap of a porphyry system at Chinchillones. San Juan Province of Argentina has a robust mining

sector and recognizes the important economic benefi ts of responsible develop ment of its substantial

Mineral Resource endowment.

About Minsud Resources Corp.

Minsud is a mineral exploration company focused on exploring its flagship Chita Valley Cu-Mo- Au-Ag-

Pb-Zn Project, in the Province of San Juan, Argentina. The Company also holds a 100% owned portfolio

of selected early-stage prospects, including 6,000 ha in Santa Cruz Province, Argentina.

FOR FURTHER INFORMATION PLEASE CONTACT

Ramiro Massa

President and Chief Executive Officer

[email protected]

www.minsud.com

+1 416-479-4466

CAUTIONARY STATEMENT REGARDING FORWARD‐LOOKING INFORMATION: 

This news release includes certain information that may constitute forward‐looking information under 

applicable  Canadian  securities  laws.  Forward‐looking  information  includes,  but  is  not  limited  to, 

statements about strategic plans, spending commitments, future operations, results of exploration, 

anticipated  financial  results,  future  work  programs,  capital  expenditures  and  objectives.  Forward‐

looking  information  is  necessarily  based  upon  a  number  of  estimates  and  assumptions  that,  while 

considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which 

may cause the actual results and future events to differ materially from those expressed or implied by 

such forward‐looking information including, but not limited to: fluctuations in the currency markets 

(such  as  the  Canadian  dollar,  Argentina  peso,  and  the  U.S.  dollar);  changes  in  national  and  local 

government,  legislation,  taxation,  controls,  regulations  and  political  or  economic  developments  in 

Canada and Argentina or other countries in which the Corporation may carry on business in the future; 

operating or technical difficulties in connection with exploration and development activities; risks and 

hazards  associated  with  the  business  of  mineral  exploration  and  development  (including 

environmental  hazards  or  industrial  accidents);  risks  relating  to  the  credit  worthiness  or  financial 

condition of suppliers and other parties with whom the Company does business; presence of laws and 

regulations that may impose restrictions on mining, including those currently enacted in Argentina; 

employee  relations;  relationships  with  and  claims  by  local  communities;  availability  and  increasing 

costs associated with operational inputs and labour; the speculative nature of mineral exploration and 

development,  including  the  risks  of  obtaining  necessary  licenses,  permits  and  approvals  from 

government  authorities;  business  opportunities  that  may  be  presented  to,  or  pursued  by,  the 

Company; challenges to, or difficulty in maintaining, the Company’s title to properties; risks relating 

to the Company’s ability to raise funds; and the factors identified under “Risk Factors” in the Company's 

Filing Statement dated April 27, 2011. There can be no assurance that such information will prove to 

be accurate, as actual results and future events could differ materially from those anticipated in such 

information. Accordingly, readers should not place undue reliance on forward‐looking information. All 

forward‐looking‐information contained in this news release is given as of the date hereof and is based 

upon the opinions and estimates of management and information available to management as at the 

date  hereof.  The  Company  disclaims  any  intention  or  obligation  to  update  or  revise  any  forward‐

looking information, whether as a result of new information, future events or otherwise, except as 

required by law. 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the 

policies  of  the  TSX  Venture  Exchange)  accepts  responsibility  for  the  adequacy  or  accuracy  of  this 

release.