Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MRZL.V ·

Commerce Resources Reports Saville Resources Intersects 0.72% Nb2O5 over 20.4 m, including 1.20% Nb2O5 over 3.1 m, and announces grant of Stock Options

Drill Results Mergers & Acquisitions Share Capital & Compensation

Commerce Resources Reports Saville Resources Intersects 0.72% Nb2O5 over

20.4 m, including 1.20% Nb2O5 over 3.1 m, and announces grant of Stock

Options

December 8, 2021 – Commerce Resources Corp. (TSXv: CCE, FSE: D7H0, OTCQX: CMRZF)

(the “ Company” or “ Commerce”) is pleased to announce assay results from Saville

Resources Inc.’s (TSXv: SRE, FSE: S0J) (“ Saville Resources”) maiden drill program (EC21-

178, 179, 180, and 181) completed on the Miranna Prospect as part of its 2021 diamond drill

program at the Niobium Claim Group Property (the “Property”), owned by Commerce. The

Property covers several prospective and advanced -stage niobium-tantalum targets, where

Saville Resources is completing an Earn-in Agreement for up to a 75% interest in the claim

group.

The 2021 drill program, completed in July, included seven (7) holes totalling 1,349 m split

over two prospects – Mallard (681 m over 3 holes) and the Miranna Prospect (668 m over 4

holes). The results of the drill holes targeting the Mallard Prospec t were announced

November 1st, 2021, and include the best niobium intersection to date. The maiden drilling

at Miranna followed and has also demonstrated the potential for >1% Nb2O5 mineralization

at depth.

Core sample assay highlights at Miranna include:

• 20.4 m of 0.72% Nb2O5 and 5.7% P2O5 (EC21-180), including,

o 3.1 m of 1.20% Nb2O5 and 7.6% P2O5, or

o 4.6 m of 0.97% Nb2O5 and 6.4% P2O5

The four drill holes completed by Saville Resources at Miranna are the first to date to test

the Miranna Prospect and were scoping in nature. Each drill hole, ranging in depth from 140

m to 236 m, was designed to test a different area of the geophysical anomaly that defines the

prospect – the north-northwest margin, east -northeast margin, and the anomaly centre –

with the objective of identifying the most prospective area for follow -up. Saville Resources

also reported that drill hole EC21 -180 achieved this objective, returning significant

mineralization downhole, including 1.20% Nb2O5 over 3.1 m within a larger interval of

0.72% Nb2O5 over 20.4 m. The potential of this area is further emphasized by the additional

mineralization encountered from surface in drill hole EC21-180 at 0.61% Nb2O5 over 7.9 m.

Core assay highlights for all four (4) Miranna holes are presented in Table 1 and Figure 1.

Table 1: 2021 drill hole results for the Mallard and Miranna prospects

The high -grade mineralization encountered in EC21 -180 is hosted within dark grey

phoscorite to cream -grey phoscorite -calcite carbonatite units with minor to abundant

magnetite and local dolomitization. This rock type and mineralogy is consistent with one of

the common rock types present in the high-grade boulder train, in which the bedrock source

is interpreted to be the Miranna geophysical anomaly (Figure 2).

The high-grade mineralization encountered in the 2021 Miranna and Mallard drill holes is

present within 110 m of surface and is locally known to reach surface . Coupled with the

presence of numerous high -grade, glacially dispersed boulders, suggests that open -pit

extraction methods may be potentially applicable in a development scenario. By comparison,

several of the more advanced niobium focused projects in North America are being

developed using underground extraction scenarios due to significant amounts of

overburden, including North America’s only operating niobium mine – Niobec. Overburden

thickness at Miranna and Mallard is less than 10 m.

Prospect Hole ID From

(m)

To

(m)

Interval

(m)

Nb2O5

(%)

Ta2O5

(ppm)

P2O5

(%) Comments

EC21-175 3.5 13.0 9.5 0.75 163 10.3 Collared in mineralization

106.5 148.8 42.3 0.82 153 8.7

including 112.5 129.6 17.1 1.00 136 8.3

or 115.5 120.6 5.1 1.39 148 12.0 1.73% Nb2O5 peak assay

EC21-176 53.5 71.0 17.5 0.70 39 7.4 1.16% Nb2O5 peak assay

including 64.5 66.0 1.5 1.14 35 11.6

104.9 117.2 12.4 0.84 186 11.3 1.19% Nb2O5 peak assay

including 113.4 117.2 3.8 1.06 151 12.9

140.1 148.0 7.9 0.78 203 4.5 1.30% Nb2O5 peak assay

EC21-177 82.27 106.1 23.8 0.61 111 8.9

131.7 161.4 29.7 0.61 251 6.8

EC21-178 126.4 127.8 1.4 0.73 90 4.0

EC21-179 78.4 84.1 5.6 0.58 28 3.5

81.2 82.5 1.3 0.87 43 3.5

EC21-180 4.8 12.7 7.9 0.61 64 4.3 Collared in mineralization

25.6 46.0 20.4 0.72 60 5.7

including 25.6 28.7 3.1 1.20 59 7.6 1.54% Nb2O5 peak assay

or 39.7 44.3 4.6 0.97 127 6.4

EC21-181 72.1 75.3 3.1 0.51 10 4.4

Mallard2

Miranna3

(3) Intervals reported are core length. True width is not known. Drill holes are NQ core size, with approximate azimuth/dip of 230°/65° for

EC21-178 and 230°/45° for EC21-179, 180, and 181.

(1) Analytical detection limit for Ta2 O 5 is 0.002%.

(2) Intervals reported are core length. True width is not fully constrained; however, data indicates core length widths approximate 90%+

of true width. Drill holes are NQ core size, with approximate azimuth/dip of 230°/45°.

Saville Resources also announced that the field programs were carried -out while adhering

to all federal, provincial, and regional restrictions in place due to the COVID -19 pandemic.

The process to ent er Nunavik was successfully navigated with authorization obtained to

complete the planned field activities. Mineral exploration has been recognized as an essential

service in Canada and the Province of Quebec. Saville Resources also reported that no cases

of COVID-19 were documented with respect to the 2021 exploration program.

Quality Assurance / Quality Control (QAQC)

A quality assurance / quality control protocol following industry best practices was

incorporated by Saville Resources into the program and included systematic insertion of

quartz blanks and certified reference materials into sample batches, as well as collection of

quarter-core duplicates, at a rate of approximately 5%. Drill holes were sampled from top to

bottom and shipped to Activation Laboratories in Ancaster, ON for analysis.

Lab analysis included niobium, tantalum, and major oxides by X-ray fluorescence (package

8-Coltan XRF + Major Oxides) and fluorine by Fusion Specific Ion Electrode-ISE (Code 4F-F).

Standard drill core sample preparation was completed and comprised of crushing to 80%

passing 10 mesh, followed by a 250 g riffle split and pulverizing to 95% passing 105 µ

(package RX1).

The Company also announces that it has granted an aggregate of 2,500,000 stock options

(each, an “Option”) to certain directors, officers, employees and consultants of the Company

for the purchase of up to 2,500,000 common shares of the Company pursuant t o its Stock

Option Plan. Each Option is exercisable for a period of two (2) years at a price of $0.23 per

common share. Of these Options, 150,000 are being granted to persons providing investor

relations services to the Company and, pursuant to the policies of the TSX Venture Exchange,

must vest over 12 months from the issuance date, with 25% vesting in each three (3) month

period after the grant of the Options.

Figure 1: 2021 drill assay highlights – Miranna Prospect

Figure 2: Miranna mineralized boulder train

NI 43-101 Disclosure

Darren L. Smith, M.Sc., P.Geo., Dahrouge Geological Consulting Ltd., a Permit holder with the

Ordre des Géologues du Québec and ‘Qualified Person’ as defined in National Instrument 43-101

– Standards of Disclosure for Mineral Projects , supervised the preparation of the technical

information in this news release.

About Commerce Resources Corp.

Commerce Resources Corp. is a junior mineral resource company focused on the development of

the Ashram Rare Earth and Fluorspar Deposit located in Quebec, Canada. The Company is

positioning to be one of the lowest cost rare earth producers globally, with a specific focus on

being a long-term supplier of mixed rare earth carbonate and/or NdPr oxide to the global market.

The Ashram Deposit is characterized by simple rare earth (monazite, bastnaesite, xenotime) and

gangue (carbonates) mineralogy, a large tonnage resource at favourable grade, and has

demonstrated the production of high-grade (>45% REO) mineral concentrates at high recovery

(>70%) in line with active global producers. In addition to being one of the largest rare earth

deposits globally, Ashram is also one of the largest fluorspar deposits globally and has the potential

to be a long-term supplier to the met-spar and acid-spar markets.

For more information, please visit the corporate website at www.commerceresources.com or

email [email protected].

On Behalf of the Board of Directors

COMMERCE RESOURCES CORP.

“Chris Grove”

Chris Grove

President and Director

Tel: 604.484.2700

Email: [email protected]

Web: http://www.commerceresources.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements

This news release contains forward -looking statements, which includes any information about activities, events or

developments that the Company believes, expects or anticipates will or may occur in the future. Forward looking

statements in this news release include that we believe the niobium potential at the Mallard and Miranna prospects to

be promising; that an open pit extraction method may be potentially applicable; and that there is potential for additional

mineralization in the Miranna area based on the results of drill hole EC21 -180, the Company is positioning to be one

of the lowest cost rare earth producers globally, with a specific focus on being a long-term supplier of mixed rare earth

carbonate and/or NdPr oxide. These forward-looking statements are subject to a variety of risks and uncertainties and

other factors that could cause actual events or results to differ materially from those projected in the forward -looking

information. Risks that could change or prevent these statements from coming to fruition include that our contracted

engineering firms, or those contracted by Saville Resources, may not be able to provide engineering solutions which

are effective or can be implemented economically; changing costs for mining and processing; increased capital costs;

the timing and content of any future work programs; geological interpretations based on drilling that may change with

more detailed information; potential process methods and mineral recoveries assumption s based on limited test work

and by comparison to what are considered analogous deposits tha t, with further test work , may not be comparable;

testing of our process or the process utilized by Saville Resources on our Property may not prove successful and even

if such tests are successful, the economic and other outcomes may not be as expected; th e availability of labour,

equipment and markets for the products produced; and despite the current expected viability of the project, conditions

changing such that the minerals on our Property cannot be economically mined , if at all, or that the required permits

to build and operate the envisaged mine can be obtained. The forward -looking statements contained in this news

release are made as of the date hereof and the Company assumes no responsibility to update or revise such information

to reflect new events or circumstances, except as required by law.