Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MRZL.V ·

Commerce Resources Corp. and Saville Resources Inc. Report Drill Results including 1.36% Nb2O5 over 4.5 m at the Niobium Claim Group Property, Quebec

Drill Results

Commerce Resources Corp. and Saville Resources Inc. Report Drill

Results including 1.36% Nb2O5 over 4.5 m at the Niobium Claim Group

Property, Quebec

June 11, 2019 – Commerce Resources Corp. (TSXv: CCE, FSE: D7H) (the “Company” or

“Commerce”) is pleased to announce the final drill hole results from Saville Resources Inc. (TSXv:

SRE, FSE: S0J) (“Saville Resources”) on the Mallard Prospect at the Niobium Claim Group

Property (the “Property”), a subset of the Company’s Eldor claims, which are located

approximately 130 km south of Kuujjuaq, Quebec. The Property covers several prospective and

advanced-stage niobium-tantalum targets, with Saville Resources completing Year-1 of its Earn-

in Agreement on these claims.

Sample assays for drill hole EC19-174A have now been received and have returned the strongest

and widest mineralized intervals of niobium to date on the Property. Starting from only 17 m depth

(core length), results include 0.80% Nb2O5 over 31.5 m, including 0.98% Nb2O5 over 13.5 m

or 1.36% Nb2O5 over 4.5 m, as well as a second sub-interval of 1.04% Nb2O5 over 7.7 m. This

near-surface mineralization is followed by a second well mineralized interval, starting from 96.5

m depth (core length), which assays 0.79% Nb2O5 over 37.0 m, including 1.01% Nb2O5 over

7.5 m, as well as a third mineralized horizon assaying 0.67% Nb2O5 over 20.0 m . A total of

eleven (11) individual samples from EC19-174A returned >1% Nb2O5 with a peak sample of

1.68% Nb2O5 over 1.5 m.

Company President, Chris Grove states “ The potential at Mallard only seems to grow with each

drill hole completed. The results from the recent Saville Resources program have been excellent

and we are excited to have them continue to advance this asset and unlock the additional value for

our shareholders as we focus on the Ashram Rare Earth Deposit, located only 2 km away.”

To date, preliminary interpretation of the drill data indicates the Mallard Prospect is characterized

by a series of sub-parallel, elongate, moderate-steep dipping, northwest trending mineralized

horizons that extend from surface and remain open in all directions. These higher-grade

mineralized horizons are separated by comparable horizons of moderate to low grade niobium

mineralization. Given the elongate nature of the mineralized horizons, as well as their moderate-

steep dip, the mineralized horizons encountered at depth in each hole have a reasonable potential

to continue up-dip, and potentially to surface, and therefore, could be intersected at a shallower

depth by stepping the drill forward.

In addition, strong grades of tantalum and phosphate continue to be returned in association with

the niobium with a zonation between all three evident. Additional mineralogical work is planned

as part of Phase II to advance the understanding of the mineral relationships across the mineralized

horizons.

A summary of the analytical results is presented below in Table 1 as well as a map with assay

summaries and hole locations at the link below.

Table 1: Summary of mineralized intercepts for drill hole EC19-174A

Hole ID From

(m)

To

(m)

Interval

(m)

Ta2O5

(ppm)

Nb2O5

(%)

P2O5

(%) Comments

EC19-171 Results reported in news release dated June 3rd, 2019

EC19-172 Results reported in news release dated June 6th, 2019

EC19-173 Results reported in news release dated June 6th, 2019

EC19-174 No samples (hole lost at 81 m and recollared as 174A)

EC19-

174A 4.97 270.00 265.03 105 0.48 6.1 Entire Hole (second last

sample 0.52% Nb2O5)

17.00 48.50 31.50 81 0.80 9.0 Mineralized Horizon 1

incl. 18.50 32.00 13.50 70 0.98 10.5

or 23.00 32.00 9.00 73 1.13 10.6

or 23.00 27.50 4.50 70 1.36 12.3

incl. 37.80 45.50 7.70 136 1.04 11.9

96.50 133.50 37.00 163 0.79 8.1 Mineralized Horizon 2

incl. 114.00 123.94 9.94 168 0.95 8.6

or 115.50 123.00 7.50 178 1.01 9.0

167.52 187.47 19.95 170 0.67 9.4 Mineralized Horizon 3

197.00 230.50 33.50 70 0.50 5.0

(1) Analytical detection limits are 0.003% (30 ppm) for Nb2O5 and Ta2O5, and 0.01% for P2O5.

(2) Fluorine analysis yet to be completed.

(3) All drill holes are NQ core size, with approximate strike/dip of 230/45

(4) True width is not fully constrained; however, the dip of mineralization is interpreted as moderate/steep to the northeast.

Incorporation of the 2019 drill data is anticipated to provide a proper basis for true width to be reasonably estimated.

Figure 1: Drill holes with assay summary for the Mallard Prospect

Drill holes EC19-171, 172, and 174A were all completed southeast of the historical drilling at

Mallard and all intersected significant intervals of niobium mineralization starting at or near-

surface, while also effectively bottoming in mineralization. Drill hole EC19-174A was the final

hole of the 2019 winter program and was completed as an approximate 50 m step-out along strike

to the southeast from EC19-172. Collectively, the 2019 drill program has successfully extended

the mineralized strike at Mallard to the southeast by approximately 100 m, and further, is marked

by a notable increase in grade and width of the mineralized horizon(s). To the north, the

intersection in EC19-173 has further advanced the potential in this area, towards the Spoke and

Miranna targets, which remain to be drill tested.

The Mallard Prospect is the most advanced prospect on the Property, with 2,490 m over nine (9)

drill holes completed by the Company (2008 and 2010), and 1,049 m over five (5) drill holes now

completed by Saville Resources (2019). Coupled with the strong mineralization returned

historically, Saville Resources’ Phase I drill program at Mallard will provide the foundation for

advancement towards an initial mineral resource estimate. Further drilling at Mallard as well as

several other high-priority targets, including Miranna, is planned as part of Phase II. The 2019

exploration of the Property is being carried out by Dahrouge Geological Consulting Ltd. and

managed out of Quebec.

Quality Assurance / Quality Control (QAQC)

A Quality Assurance / Quality Control protocol following industry best practices was incorporated

into the program and included systematic insertion of quartz blanks and certified reference

materials into sample batches, as well as collection of quarter-core duplicates, at a rate of

approximately 5%. Drill holes EC19-171, 172, 173, and 174A were sampled in their entirety, for

a total of 764 samples including QAQC, and were shipped to Activation Laboratories in Ancaster,

ON for analysis. No samples were collected from EC19-174 as it was unexpectedly lost at a depth

of 81 m and recollared as EC19-174A.

Lab analysis included niobium, tantalum, and major oxides by XRF (package 8-Coltan XRF).

Standard drill core sample preparation was completed and comprised of crushing to 80% passing

10 mesh, followed by a 250 g riffle split and pulverizing to 95% passing 105 µ (package RX1).

Additional sample analysis is anticipated.

NI 43-101 Disclosure

Darren L. Smith, M.Sc., P.Geo., Dahrouge Geological Consulting Ltd., a Permit holder with the

Ordre des Géologues du Québec and Qualified Person as defined by National Instrument 43-101,

supervised the preparation of the technical information in this news release.

About Niobium

Niobium is a shiny grey, ductile metal with a chemical symbol Nb and an atomic number 41. It is

commonly marketed as ferroniobium and is dominantly used as an additive in high-strength low-

alloy steel (HSLA) production. Niobium has the ability, with a very low percentage alloy, to

significantly strengthen steel and is therefore an essential component used in bridges, buildings

and automotive chassis. Niobium has seen significant increased demand from the HSLA steel

market over the last decade and has maintained a relatively stable price range of approximately

$38 to 45 per kg over this same period, and is currently trading for approximately $42 per kg

(metalary.com).

About Commerce Resources Corp.

Commerce Resources Corp. is an exploration and development company with a particular focus

on deposits of rare metals and rare earth elements. The Company is focused on the development

of its Ashram Rare Earth Element Deposit in Quebec and the Upper Fir Tantalum-Niobium

Deposit in British Columbia.

For more information, please visit the corporate website at www.commerceresources.com or

email [email protected].

On Behalf of the Board of Directors

COMMERCE RESOURCES CORP.

“Chris Grove”

Chris Grove

President and Director

Tel: 604.484.2700

Email: [email protected]

Web: http://www.commerceresources.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements

This news release contains forward-looking information which is subject to a variety of risks and uncertainties and other factors

that could cause actual events or results to differ from those projected in the forward-looking statements. Forward looking

statements in this press release include that the mineralized horizons encountered at depth in each hole have a reasonable potential

to continue up-dip and that they could be intersected at a shallower depth by stepping the drill forward; that the 2019 drill program

was successful in extending the mineralized strike at Mallard to the southeast; that the intersection in EC19-173 has further

advanced the potential in the area; and that this work will provide the foundation for advancements towards an initial mineral

resource estimate. These forward-looking statements are subject to a variety of risks and uncertainties and other factors that could

cause actual events or results to differ materially from those projected in the forward-looking information. Risks that could change

or prevent these statements from coming to fruition include changing costs for mining and processing; increased capital costs; the

timing and content of upcoming work programs; geological interpretations based on drilling that may change with more detailed

information; potential process methods and mineral recoveries assumption based on limited test work and by comparison to what

are considered analogous deposits that with further test work may not be comparable; the availability of labour, equipment and

markets for the products produced; and despite the current expected viability of the project, conditions changing such that the

minerals on our property cannot be economically mined, or that the required permits to build and operate the envisaged mine can

be obtained. The forward-looking information contained herein is given as of the date hereof and the Company assumes no

responsibility to update or revise such information to reflect new events or circumstances, except as required by law.