Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MRZ.V ·

Mirasol Continues to Report Encouraging Results from Phase IV Drill

Drill Results

NEWS RELEASE

E-mail: [email protected] | Tel: +1 604 602 9989

mirasolresources.com

July 21, 2022

Shares Issued and Outstanding: 54,015,043

TSX-V: MRZ

OTCPK: MRZLF

Mirasol Continues to Report Encouraging Results from Phase IV Drill

Program at the Virginia Project, Argentina -

High-grade Intercepts Extend Mineralization Beyond the Existing

Silver Resource

VANCOUVER, BC, July 21, 2022 — Mirasol Resources Ltd. (TSX -V: MRZ) (OTCPK: MRZLF) (the “ Company” or

“Mirasol”) is pleased to report results from the 12 -hole, 1,362-meter Phase IV diamond drill campaign at the

Virginia Silver Project (“Virginia”), located in Santa Cruz province, Argentina. The Virginia program is being funded

by Silver Sands Resources Corp. (CSE: SAND) (OTCQB: SSRSF) (“Silver Sands”) under an option to purchase

agreement in terms of which Mirasol will retain a 19.9% ownership in Silver San ds and a 3% NSR royalty, if the

option is exercised (see News Release May 21, 2020).

“Virginia is one of Mirasol’s key projects located in a prolific silver mining district”, Mirasol’s President, Tim

Heenan, commented. “The latest drill results continue to confirm the strong potential to build on Virginia’s

current resource base within this very prospective silver- rich epithermal vein field. The new very high -grade

Margarita discovery will play an important role in potential future additions to the existing silver resources. The

entire Ely Vein trend is coming together to potentially form one continuous 870 -meter-long mineralized zone.

We are also pleased to see some of the outlying ‘blue sky’ targets, such as the Patricia Trend located

approximately 1.5 kilometers to the north of the Ely North Resource conceptual pit, delivering indications of

stronger silver mineralization.”

Figure 1: Phase IV Drill Campaign Overview

The previously untested Patricia and Daniela targets were also drilled during this campaign. The encouraging

intercepts at the Patricia target represent the first significant silver mineralization from these outlying vein trends

to the north and east of the principal resource conceptual pits.

Encouraging intercepts at Ely North, located both to the south and north of the current resource, have the

potential to add new tonnage to the current Ely North resource.

At the Martina trend, the focus was to test the potential for new mineralization. The encouraging results

obtained from MNW-DDH-006 and MC-DDH-002 combined extend the mineralization along the Martina trend

by almost 100 meters to the North and South.

Significant results from the Phase IV drill campaign:

Margarita Vein Drill Results:

At the Margarita high -grade silver trend, three drill holes for a total of 333 meters successfully extended the

mineralized vein by more than 150 meters to the north-west. The system remains open in both directions. The

Margarita Vein has similar mineralization to the Julia Vein which hosts most of the current silver resources at

Virginia.

E-mail: [email protected] | Tel: +1 604 602 9989

mirasolresources.com

Margarita hole MR-DDH-004 returned 4.85 meters at 720 g/t silver, including a discreet intercept of 0.30 meters

at 1,775 g/t silver, exhibiting a strongly banded epithermal vein with fine-grained sulphides and copper oxides.

Figure 2: Margarita Vein Trend Long Section with Interpreted Grade Shells

Hole MR-DDH-005, the northern most hole to date along Margarita, returned values of 2.00 meters at 322 g/t

silver and 0.6 meters at 673 g/t silver.

Hole MR-DDH-006, drilled to a vertical depth of 100 meters below surface, returned 3.6 meters at 185 g/t silver,

including 0.5 meters at 588 g/t silver, showing that high -grade silver mineralization extends to depth and

remains open.

Ely Central Vein Drill Results:

At Ely Central three holes were drilled for a total of 261 meters testing the gaps within the 500-meter-long trend.

This newly identified silver-rich vein trend hosts previously reported high-grade drill intercept of 1,110 g/t silver

over 5.70 meters (drill hole EC -DDH-005, see news release dated May 17, 2021), outcrops on surface and has

been drilled to 100 meters vertically below surface, and remains open to depth.

Figure 3: Ely North and Ely Central Vein Trends Long Section with Interpreted Grade Shells

Notable intersections from the Ely Central drill holes:

• EC-DDH-011: 11.95m at 124 g/t silver, including 1.8m at 192 g/t silver

• EC-DDH-010: 1.95m at 190 g/t silver, including 0.3m at 553 g/t silver

• EC-DDH-012: 2m at 87 g/t silver, including 0.3m at 182 g/t silver

Figure 4: Ely North and Ely Central Vein Trends Drill Results Over Gradient IP Survey

Further infill drilling is required to test the remaining gaps along the Ely Trend. This could potentially connect

the Ely Central and Ely South conceptual resource pits. Existing gaps are between drill holes EC-DDH-012 and EC-

DDH-002 and also in the northern end. The higher -grade intersections of the adjacent southern zone to the Ely

North conceptual resource pit may connect to expand the Ely North resource between drill holes VG -183 and

EC-DDH-008 and in the southmost part of Ely Central.

Ely North Vein Drill Results:

One drill hole, EN -DDH-006, tested the northern extension of the 200- meter-long anomalous southern end of

Ely North vein, which is not currently part of the Ely North conceptual resource pit. The hole intercepted the vein

100 meters vertically below surface returning 5.65 meters at 144.5 g/t silver, including 0.6 meters at 418 g/ t

silver.

This result is very significant as it extends the trend 50 meters to the north and also reduces the gap with the

conceptual resource pit at Ely North (gap between EN-DDH-006 and previous drilling VG-186.

A priority geophysical chargeable anomaly located to the north of hole EN-DDH-006 remains untested and may

close the gap with another hole located 50 meters north of EN-DDH-006. The northern-most end of the Ely North

conceptual resource pit was also extended by EN-DDH-001 and remains open to north.

Martina Vein Drill Results: (Martina NW and Martina Central)

Two new holes were drilled at the Martina vein trend.

• MNW-DDH-006: 4.8m at 91 g/t silver

• MC-DDH-002: 2.9m at 127 g/t silver, including 1.45m at 179.5 g/t silver

Figure 5: Martina Vein Trend Long Section with Interpreted Grade Shells

E-mail: [email protected] | Tel: +1 604 602 9989

mirasolresources.com

Martina Central drill hole MC -DDH-002 returned silver intersections and was designed to start testing the gap

between the Martina Central and northwest trends. Gaps still remain along the Martina structure with the

potential for silver grades to be associa ted with the notable high chargeability responses. Hole MNW -DDH-006

filled the gap in the Martina NW and extended the mineralization along this 200-meter-long trend.

Patricia and Daniela Vein Drill Results:

One drill hole tested each of these veins which were untested targets hosting the highest- grade surface rock-

chip silver samples. The objective of these holes was to test for downdip extensions of the surface expressions.

The Patricia drill hole PA-DDH-001 intersected 1.45 meters at 120 g/t silver, including 0.5 meters at 198.5 g/t

Silver, and another parallel structure with 2.95 meters at 95.7 g/t silver, including 0.35 meters at 163 g/t silver.

These modest drill results did not replicate the extremely high -grade rock chips from near source float blocks

samples (over 29,000 g/t silver and 18,800 g/t silver) from surface at Daniela and Patricia (see news release dated

October 29, 2020). Follow up drilling along strike will be re quired to understand the significance of these

intersections.

Santa Rita East Vein/Breccia Drill Results:

Hole SRE-DDH-005 was drilled at the Santa Rita East breccia structure to test the potential depth continuity of

the epithermal quartz -adularia vein intercepted in hole SRE -DDH-003 (5.20 meters at 0.63 g/t gold and 7 g/t

silver from 35.30 meters, see news release dated February 10, 2022). Hole SRE-DDH-005 intersected 1.3 meters

at 0.23 g/t gold and 0.45m at 0.18 g/t gold. While below expectations, the structure is gold-rich and hosts a large

IP high chargeability anomaly with a footprint over 200 meters long. This warrants more drilling to fully evaluate

the breccia structure and other Santa Rita East and Central epithermal vein structures.

Libanesa Silver-Gold Project in Argentina:

Mirasol has received notification that the option agreement on the Libanesa Sliver- Gold project in Argentina

(“Libanesa”) with our partner, Golden Arrow Resources Corporation (TSX -V:GRG) (“Golden Arrow”) has been

terminated. Golden Arrow has exceeded its contractual minimum commitment by spending over US$500,000 on

exploration since the option agreement was announced (see news release dated October 12, 2021). The

exploration program included field mapping, surface sampling, trenching and 1,716 meters of drilling at the Cerro

Plomo/Cerro Rodonda and the Lagunita prospects. Mirasol firmly believes that quality drill targets remain at

Libanesa (Cerro Plomo) and once the data has been officially received Mirasol will review and evaluate how to

test these remaining targets.

Table 1: Virginia Phase IV Reported Drill Intercepts

Hole ID From To Interval (m)1 Silver g/t2 Gold g/t Cut-off3

EC-DDH-010 53.35 55.30 1.95 190 63

including 53.35 53.65 0.30 553 300

EC-DDH-011 57.05 69.00 11.95 124 63

including 66.20 68.00 1.80 192 150

EC-DDH-012 66.85 68.90 2.00 87 63

including 68.00 68.30 0.30 182 150

EN-DDH-006 114.35 120.00 5.65 144 63

Including 116.10 116.70 0.60 418 300

MC-DDH-002 79.30 82.20 2.90 127 63

Including 80.05 81.5 1.45 179 150

MNW-DDH-006 63.20 68.00 4.80 91 63

MR-DDH-004 57.70 62.55 4.85 720 63

E-mail: [email protected] | Tel: +1 604 602 9989

mirasolresources.com

Hole ID From To Interval (m)1 Silver g/t2 Gold g/t Cut-off3

Including 60.70 61.00 0.30 1,775 300

MR-DDH-005 55.60 57.65 2.00 322 150

Including 56.30 56.90 0.60 673 300

MR-DDH-006 96.85 100.45 3.60 185 63

Including 98.75 99.25 0.50 588 300

PA-DDH-001 33.45 34.90 1.45 120 63

Including 33.95 34.45 0.5 198 150

10.20 13.15 2.95 96 63

Including 11.90 12.25 0.35 163 150

SRE-DDH-005 81.05 82.35 1.30 0.23 0.20

85.6 86.05 0.45 0.18 0.10

DA-DDH-001 No interval above cut-off

Notes:

1 Reported interval length are down hole widths and not true widths.

2 Reported intervals are at the stated a cut-off grade of 63 g/t Ag, 150 g/t Ag, 300 g/t Ag, 0.20 g/t Au and 0.10 g/t Au.

_Reported intervals may include up to a maximum of 2m individual section below cut -off grade and Ag grades are

uncapped.

3 The intervals were selected using the 63 g/t Ag cut-off grade used in the NI 43-101 resource estimate.

Table 2: Virginia Phase IV Reported Holes Collar Location

Hole Id Easting Northing Elevation (m) Azimuth Dip Depth (m)

DA-DDH-001 2,428,498 4,742,039 1,055 70 -45 113

EC-DDH-010 2,428,905 4,739,935 994 280 -45 80

EC-DDH-011 2,428,878 4,739,737 996 280 -45 92

EC-DDH-012 2,428,852 4,739,625 992 280 -45 89

EN-DDH-006 2,428,995 4,740,302 1,027 264 -45 168

MC-DDH-002 2,429,677 4,739,971 978 65 -45 137

MNW-DDH-006 2,429,611 4,740,124 1,006 65 -45 131

MR-DDH-004 2,428,750 4,738,689 968 50 -45 101

MR-DDH-005 2,428,717 4,738,735 968 45 -45 101

MR-DDH-006 2,428,716 4,738,659 964 50 -45 131

PA-DDH-001 2,428,419 4,742,002 1,056 250 -45 92

SRE-DDH-005 2,423,590 4,752,135 844 280 -50 127

About Mirasol Resources Ltd

Mirasol is a well-funded exploration company with 18 years of operating, permitting and community relations

experience in the mineral rich regions of Chile and Argentina. Currently Mirasol is self-funding exploration at two

flagship projects, Sobek and Inca Gold, both located in Chile. Mirasol has six partner-funded projects, with

Newcrest Mining Ltd, First Quantum Minerals, Mine Discovery Fund and Mineria Activa in Chile, Silver Sands

Resources and Patagonia Gold in Argentina. New projects continue to emerge as Mirasol advances a strong

pipeline of highly prospective early and mid-stage projects.

E-mail: [email protected] | Tel: +1 604 602 9989

mirasolresources.com

For further information, contact:

Tim Heenan, President

or

Troy Shultz, Vice President Investor Relations

Tel: +1 (604) 602-9989

Email: [email protected]

Website: www.mirasolresources.com

Qualified Person Statement: Mirasol’s disclosure of technical and scientific information in this press release has been

reviewed and approved by Tim Heenan (MAIG), the President for the Company, who serves as a Qualified Person under the

definition of National Instrument 43-101.

QAQC: Mirasol applies industry standard exploration sampling methodologies and techniques. All geochemical rock and drill

samples are collected under the supervision of the company’s geologists in accordance with industry practice. Geochemical

assays are obtained and reported under a quality assurance and quality control (QA/QC) program with insertions of controls

(standards, blanks and duplicates, representing 5%, 4% and 5% of the samples respectively). Standards and blanks are

inserted randomly in all drill core batches that are submitted to the laboratory, while duplicates are done on both the coarse

reject (2.5%) and pulps (2.5%). Drill core samples have a minimum of 0.30m and a maximum of 2.00m in length. Samples

are dispatched for analysis to Alex Stewart International Labs in Argentina, an ISO 9001:2015 accredited laboratory, which

is independent from the Company. The samples are delivered to the laboratory by Mirasol personnel, a dedicated private

courier, or by the dedicated laboratory pick -up service. Core diameter is generally HQ/HQ3 and samples are analysed by

Fire Assay for both Au and Ag and also by ICP MS including a package of 48 elements.

Forward Looking Statements: The information in this news release contains forward looking statements that are subject to

a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially

from those anticipated in our forward -looking statements. Factors that could cause such differences include: changes in

world commodity markets, eq uity markets, costs and supply of materials relevant to the mining industry, change in

government and changes to regulations affecting the mining industry and to policies linked to pandemics, social and

environmental related matters. Forward-looking statements in this release include statements regarding future exploration

programs, operation plans, geological interpretations, mineral tenure issues and mineral recovery processes. Although we

believe the expectations reflected in our forward -looking statemen ts are reasonable, results may vary, and we cannot

guarantee future results, levels of activity, performance or achievements. Mirasol disclaims any obligations to update or

revise any forward-looking statements whether as a result of new information, future events or otherwise, except as may

be required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Virginia Project

Figure 1: Phase IV Drill Campaign Overview

Julia

North

Julia

Central

Julia

South

Ely

Central

Margarita

Magi

Naty

Central

Ely South

Martina Central

Martina SW

Martina NW

Florencia

Maos

Julia South

Extension

Jazmin East

Johanna

Patricia

Daniela

Previous Mirasol Drill Holes (2010-2012)

Phase I to III Drill Holes

Phase IV Drill Holes

EC-DDH-011:

11.95m @ 124 g/t Ag incl 1.8m @ 192 g/t Ag

EC-DDH-010:

1.95m @ 190 g/t Ag incl 0.3m @ 553 g/t Ag

EN-DDH-006:

5.65m @ 144 g/t Ag incl 0.6m @ 418 g/t Ag

Ely North

MC-DDH-002:

2.9m @ 127 g/t Ag incl 1.45m @ 179 g/t Ag

Martina SE

MNW-DDH-006:

4.8m @ 91,20 g/t Ag

MR-DDH-004:

4.85m @ 720 g/t Ag incl 0.3m @ 1,775 g/t Ag

MR-DDH-005:

2.0m @ 322 g/t Ag, incl 0.6m @ 673 g/t Ag

PA-DDH-001:

2.95m @ 96 g/t Ag incl 0.35m @ 163 g/t Ag, &

1.45m @ 120 g/t Ag incl 0.5m @ 198 g/t Ag

Figure 2: Margarita Vein Trend Long Section

with Interpreted Composite Grade Shells (Ag cut-off grade 63 g/t)

Long Section - Looking East

Blocks : 10 x 10 x 10m

Northwest

Open

Target

Southeast

Open

Target

Slice Width : 10m

Dip: 90

Dip Az: 51,5

Blocks : 10 x 10 x 10m

Interpolation

Global Trend: Isotropic

100m

Mapped VeinN Margarita Vein

MR-DDH-005

MR-DDH-001

MR-DDH-004

MR-DDH-006

MR-DDH-002

Mapped Vein

SouthEast

Open

Target

MR-DDH-005

Planview

Margarita Vein

MR-DDH-003

MR-DDH-002

MR-DDH-004

MR-DDH-006

MR-DDH-001MR-DDH-003

Northwest

Open

Target

Rock Chip Sample

Ag ppm

100

63

30

Ag ppm

100

63

30

EC-DDH-012EC-DDH-011EC-DDH-010

EC-DDH-001

Ely Central VeinEly North Vein Ely South Vein

Ely North Resource Pit

Ely

South

Resource Pit

Slice Width : 10m

Dip: 90

Dip Az: 101,55

Long Section - Looking East

EN-DDH-001 EN-DDH-005

EC-DDH-008

Blocks : 10 x 10 x 10m

Interpolation

Global Trend: Isotropic

VG-114VG-126VG-113

VG-108 VG-138EC-DDH-006

EC-DDH-009

EC-DDH-003

EC-DDH-007 EC-DDH-004

EC-DDH-005

VG-181 VG-186

EC-DDH-002

VG-088

VG-107

EN-DDH-006

120m

Untested

250m

Mapped Vein

VG-087

EN-DDH-006 EC-DDH-010 EC-DDH-011 EC-DDH-012

VG-184 VG-183

VG-163

Planview

Ely North Resourc

e

Pit

Ely

South

Resource Pit

Ely North Vein Ely Central Vein Ely South VeinN

EC-DDH-008

VG-183 EC-DDH-002

60m

Untested

105ms

Untested

VG-173 VG-169

Mapped Vein

Rock Chip Sample

Ely South

remains

open

Ely North

remains

open

Ely North

“South Body”

Ag ppm

100

63

30

Ag ppm

100

63

30

Figure 3: Ely North and Ely Central Vein Trends Long Section

with Interpreted Composite Grade Shells (Ag cut-off grade 63 g/t)