Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MRZ.V ·

Mirasol Signs MOU to Option its Nord Project and Reports on the Indra Drilling in Chile

Mergers & Acquisitions Property Options & Staking Partnerships & JV

NEWS RELEASE

Suite 1150 – 355 Burrard Street, Vancouver, B.C. Canada, V6C 2G8

Tel: +1 604 602 9989 E-mail: [email protected]

www.mirasolresources.com

Mirasol Signs MOU to Option its Nord Project and Reports on the Indra

Drilling in Chile

VANCOUVER, BC, October 31, 2019 — Mirasol Resources Ltd. (TSX-V: MRZ) (OTCPK: MRZLF) (the “Company” or

“Mirasol”) announces the signing of a Memorandum of Understanding (“MOU”) for its Nord Project, and reports

on the drilling results at its Indra project.

Nord MOU Execution

Mirasol is pleased to announce the signing of a MOU with Mineria Activa (“Mineria”) for its Nord Project (the

“Project”) in northern Chile. Mineria is a Chilean, mining focused, private equity fund with over US$150 million

in assets under management. The Project was staked by Mirasol as part of its ongoing Atacama-Puna generative

program and lies adjacent to the Ciclon-Exploradora polymetallic-epithermal project which is currently being

advanced toward production by Mineria. By completing this transaction, Mirasol continues rationaliz ing its

exploration portfolio and monetizes its interest in the N ord Project while retaining a 2% N et Smelter Return

(“NSR”) royalty on exploration claims located near a development project.

Mirasol’s President and CEO, Norm Pitcher, stated: “We are pleased to sign this MOU with Mineria Activa. Given

their close proximity to our Nord project, Minera is a logical buyer and we look forward to them exploring on the

Nord project for potential extension or parallel structures to the known mineralization as well as other

mineralization styles in this prospective land package.”

Terms of the Transaction

Mirasol shall grant to Mineria the option to earn 100% of the Project over 4 years by:

o Making annual cash payments totaling US$ 3,000,000:

 On signing of definitive agreement: US$ 50,000

 1st anniversary: US$ 200,000

 2nd anniversary: US$ 400,000

 3rd anniversary: US$ 600,000

 4th anniversary: US$ 1,750,000

o Committing to complete at least US$500,000 of exploration expenditures over the first 2 years of

the option period.

Upon completion of the option, Mineria will earn a 100% interest in the Project and Mirasol will retain a 2% NSR

royalty, of which 0.5% can be bought back by Mineria within 8 years of signing of the definitive agreement, for a

US$3 million payment.

The MOU is subject to legal due diligence and execution of a definitive agreement. Mirasol has granted Mineria

an exclusivity period to allow for these processes to be completed.

Nord Project Overview

The 1,967 ha Nord Project is located in Region III of Chile within the Exploradora District (Figure 1), which lies on

the western side of the N -S trending, regional scale Domeyko fault zone, and within the world class Eocene -

Oligocene Copper Porphyry belt. Based on Mirasol’s initial surface exploration, the Project has the potential to

host two main styles of mineralization.

The first type is characterized by large vein type mineralization injected into fault structures as seen in the active

small-scale mi nes located near the NE corner of the claim boundary and at Mineria’s Ciclon-Exploradora

development project, which is located adjacent to the eastern blocks of the Project (Figure 2). These veins and

breccias occupy NNW, ENE & WNW trending faults hosting polymetallic (Cu, Zn, Pb, Ag, Au) mineralization. While

Suite 1150 – 355 Burrard Street, Vancouver, B.C. Canada, V6C 2G8

Tel: +1 604 602 9989 E-mail: [email protected]

www.mirasolresources.com

surface geochemistry has returned only low to anomalous results, Mineria’s understanding will be valuable to

define drill targets for potential extensions or parallel structures to the known mineralization.

The potential for Cu-Au porphyry style mineralization is also present on the Project. In the central part of the

property package, a large alteration zone exists displaying patt erns of quartz-sericite and advance argillic

alteration with thin tourmaline(?) veinlets, which are characteristic of porphyry style alteration assemblages.

This style of mineralization is present on CODELCO’s Exploradora project, located just 2.5 km directly east of the

Project.

Mirasol looks forward to executing the definitive agreement and will provide updates on material developments

from Mineria’s exploration activities at Nord.

Indra Drilling Results

Mirasol also reports that it has completed a 6 hole, 1,685m reverse circulation drill program on its Indra property

in Chile, under the option to joint venture agreement with Hochschild Mining. The program was targeting the

depth extension of the carbonate veins mapped and sampled at surface. The assay results have been received

and no mineralization was encountered in the drilling.

The results have been provided to Hochschild Mining and the companies are discussing the next step for this

project.

About Mirasol Resources Ltd

Mirasol is a premier project generation company that is focused on the discovery and development of profitable

precious metal and copper deposits, operating via a hybrid joint venture and self-funded drilling business model.

Strategic joint ventures with precious metal producers have enabled Mirasol to maintain a tight share structure

while advancing its priority projects that are focused in high -potential regions in Chile and Argentina. Mirasol

employs an integrated generative and on -ground exploration approach, combining leading- edge technologies

and experienced exploration geoscientists to maximize the potential for discovery. Mirasol is in a strong financial

position and has a significant portfolio of exploration projects located wit hin the Tertiary Age Mineral belts of

Chile and the Jurassic age gold and silver district of Santa Cruz Province Argentina.

For further information, contact:

Norm Pitcher, President and CEO

or

Jonathan Rosset, VP Corporate Development

Tel: +1 (604) 602-9989

Email: [email protected]

Website: www.mirasolresources.com

Qualified Person Statement : Mirasol’s disclosure of technical or scientific information in this press release has been

reviewed and approved by Norm Pitcher , P.Geo. President and CEO for the Company. Mr. Pitcher serves as a Qualified

Person under the definition of National Instrument 43-101.

Forward Looking Statements: The information in this news release contains forward looking statements that are subject to

a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially

from those anticipated in our forward -looking statements. Factors that could cause such differences include: changes in

world commodity markets, equity markets, costs and supply of materials relevant to the mining industry, change in

government and changes to r egulations affecting the mining industry. Forward -looking statements in this release include

statements regarding future exploration programs, operation plans, geological interpretations, mineral tenure issues and

mineral recovery processes. Although we believe the expectations reflected in our forward -looking statements are

Suite 1150 – 355 Burrard Street, Vancouver, B.C. Canada, V6C 2G8

Tel: +1 604 602 9989 E-mail: [email protected]

www.mirasolresources.com

reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or achievements.

Mirasol disclaims any obligations to update or revise any forward -looking statements whether as a result of new

information, future events or otherwise, except as may be required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Figure 1: Nord Project Location. October 2019

%

Argentina

Chile

Bolivia

Cerro

Colorado

Collahuasi

Chuquicamata

Spence

Taca

Taca

Alumbrera

Agua Rica

Escondida

El Guanaco

La

Coipa

El Indio

Salares

Norte

Los

Helados

Maricunga

Pirquitas

Legend

Major Deposit (Au)

Major Deposit (Cu)

Major Deposit (Ag)

MRZ Mio-Pliocene

Projects

Mio-Pliocene

Igneous Belt

El

Penon

Inca de Oro

Filo del Sol

Pascua

Northern

Mio-Pliocene

Generative

Region

MRZ-Newcrest

Gorbea Project

MRZ

Zeus Project

MRZ-Newcrest

Altazor Project

Nord

MRZ-FQM

Coronacion Project

MRZ-HOC

Indra Project

Figure 2: Nord Project – Claim Outlines. October 2019

Exploradora

-

CODELCO

Porphyry

Deposit

Nord Project

1,967 ha

Ciclon

-

Exploradora

Polymetallic

Epithermal

Deposit

MINERIA ACTIVA