Mirasol Announces Initial Drilling Results for Gorbea High Sulfidation Epithermal Gold Project and Provides Update for its Altazor Project in Northern Chile
NEWS RELEASE
Suite 1150 – 355 Burrard Street, Vancouver, B.C. Canada, V6C 2G8
Tel: +1 604 602 9989 E-mail: [email protected]
www.mirasolresources.com
Mirasol Announces Initial Drilling Results for Gorbea High Sulfidation
Epithermal Gold Project and Provides Update for its Altazor Project in
Northern Chile
VANCOUVER, BC, July 24, 2019 — Mirasol Resources Ltd. (TSX -V: MRZ) (OTCPK: MRZLF) (the “ Company” or
“Mirasol”) is pleased to provide an update on the exploration activities completed at its Gorbea Gold project in
Northern Chile (Figure 1), by Newcrest Mining Limited (ASX:NCM) (“Newcrest”) under the option and farm -in
agreement announced earlier this year. The program was terminated early due to the onset of winter, with two
diamond drill holes drilled for a total of 903m at the Atlas target. Drilling was targeting a coincident geophysical,
geochemical and alteration anomaly at depth below a barren steam-heated leach cap as well as following up on
the results from Mirasol’s previous partner. Initial results have been received with best assay intervals including:
• ATL-DDH-001*: 19.3 m @ 0.89g/t Au from 372m, including 13m @ 1.1g/t Au from 372m
*Note: ATL-DDH-001 was lost 20m into the mineralized zone at 391m
• ATL-DDH-002: 59 m @ 0.39g/t Au from 274m, including 10m @ 1.0g/t Au from 289m
Norm Pitcher, President and CEO of Mirasol stated: “ We are pleased to provide an update on the exploration
work completed by Newcrest over this field season. The initial partial results received are encouraging and they
continue to demonstrate potential f or the Gorbea project to host a large -scale oxidized gold deposit . We
acknowledge the hard work of the Newcrest exploration team that was actively drilling at Gorbea four months
after the execution of our exploration agreement. We look forward to Newcrest continuing to move this project
forward and expect very active programs in Chile next field season.”
Gorbea Exploration Summary
From the planned 2,000m program, t wo diamond drill holes were drilled for 3 91m and 512m respectively
(Figure 2), with the first hole being terminated in mineralization and abandoned early due to ground conditions.
The reported assay results pertain only to drill holes completed as part of Newcrest’s drilling program since May
2019, with some further assay results yet to be received for the two completed drill holes (see table 1 for pending
assay intervals).
The drilling completed by Newcrest intersected dacite-andesite composition volcanic rocks with advanced argillic
alteration and silicification coincident with subvertical breccia bodies. The s ignificant assay intercepts remain
open in all directions and further drilling is required to determine the extent of currently defined mineralization.
Newcrest also completed 50km of CSAMT geophysics over the Atlas target as well as reconnaissance mapping
and sampling over several other target areas in the Gorbea property package. Newcrest is now in the process of
relogging the previous diamond and reverse-circulation drill holes to further refine their understand ing of the
target. Follow up drilling is planned to resume in late September 2019.
Altazor Project Update
At the Altazor high-sulfidation epithermal gold project, also in northern Chile, two target areas were defined by
fieldwork completed during the field season . Newcrest is anticipating a 2,000m diamond drilling program and
in-fill CSAMT geophysics during the coming field season.
For additional disclosure, please refer to Newcrest’s June 2019 quarterly report available on:
https://www.newcrest.com.au/investors/reports/quarterly/
Suite 1150 – 355 Burrard Street, Vancouver, B.C. Canada, V6C 2G8
Tel: +1 604 602 9989 E-mail: [email protected]
www.mirasolresources.com
Table 1: Significant Intersections from the 2019 drilling program:
Hole ID Total
Depth (m) From (m) To (m) Interval (m) Au (ppm) Ag (ppm) Cut Off
ATL-DH-01 391.3 372 391.3 19.3 0.89 6.7 0.3g/t Au
incl 372 385 13 1.1 7.6 1 g/t Au
Awaiting assays between 337m-358m
ATL-DH-02 512.3 274 333 59 0.39 6.6 0.3g/t Au
incl 289 299 10 1.0 8.6 1 g/t Au
Awaiting assays between 184 m to 270m, 359.3m to 395 m and 448m to 512.3m.
About Mirasol Resources Ltd
Mirasol is a premier project generation company that is focused on the discovery and development of profitable
precious metal and copper deposits, operating via a hybrid joint venture and self-funded drilling business model.
Strategic joint ventures with precious metal producers have enabled Mirasol to maintain a tight share structure
while advancing its priority projects that are focused in high -potential regions in Chile and Argentina. Mirasol
employs an integrated generative and on -ground exploration approach, combining leading- edge technologies
and experienced exploration geoscientists to maximize the potential for discovery. Mirasol is in a strong financial
position and has a significant portfolio of exploration projects located within the Tertiary Age Mineral belts of
Chile and the Jurassic age gold and silver district of Santa Cruz Province Argentina.
For further information, contact:
Norm Pitcher, President and CEO
or
Jonathan Rosset, VP Corporate Development
Tel: +1 (604) 602-9989
Email: [email protected]
Website: www.mirasolresources.com
Qualified Person Statement : Mirasol’s disclosure of technical or scientific information in this press release has been
reviewed and approved by Norm Pitcher , P.Geo. President and CEO for the Company. Mr. Pitcher serves as a Qualified
Person under the definition of National Instrument 43 -101. Newcrest is the operator for the Gorbea project, and Mirasol
relied on their internal quality control and quality assurance protocols as described in detail in their quarterly report dated
July 25, 2019.
Forward Looking Statements: The information in this news release contains forward looking statements that are subject to
a number of known and unknown risks, uncertainties and other facto rs that may cause actual results to differ materially
from those anticipated in our forward -looking statements. Factors that could cause such differences include: changes in
world commodity markets, equity markets, costs and supply of materials relevant to the mining industry, change in
Suite 1150 – 355 Burrard Street, Vancouver, B.C. Canada, V6C 2G8
Tel: +1 604 602 9989 E-mail: [email protected]
www.mirasolresources.com
government and changes to regulations affecting the mining industry. Forward- looking statements in this release include
statements regarding future exploration programs, operation plans, geological interpretations, mineral t enure issues and
mineral recovery processes. Although we believe the expectations reflected in our forward -looking statements are
reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or achievements.
Mirasol disclaims any obligations to update or revise any forward -looking statements whether as a result of new
information, future events or otherwise, except as may be required by applicable law.
Neither the TSX Venture Exchange nor its Regulation Services Pro vider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Figure 1: Location of Mirasol – Newcrest Gorbea Project. July 2019
a)Gold Fields Mineral Resource and Mineral Reserve Supplement to the Integrated Annual Report, 2018.
b)Barrick Annual Report 2018.
Significant Mio-Pliocene
Cu-Au Deposit
Significant Mio-Pliocene
Au-Ag Deposit
MRZ Au-Ag JV Project
Mio-Pliocene Age
Volcanics
MRZ JV Ready Project
Santiago
Alumbrera
Pascua
El Teniente
Pelambres
La Coipa
Mirasol
–
Newcrest
Gorbea
Agreement
Alturas
(b)
8.9
Moz
Au
Mirasol
–
Newcrest
Altazor AgreementAntofagasta
El Pachon
Los Azules
El Indio
Veladero
Caspiche
Maricunga
Salares Norte
(a)
3.9 Moz Au
43.7 Moz Ag
Mirasol
Zeus Project
C H I L E
Las Helados
Filo Del Sol
Josemaria
Los Bronces
A R G E N T I N A
Caserones
Agua Rica
200 km
MRZ- Newcrest
Gorbea Project
ASTER Alteration Mapping
ATLAS
TITAN
ALDEBARAN
SIRIO
EL DORADO
VENTURA
ORION
ALTAMIRA
DANAY
10 km
Window Figure 2
Figure 2: Atlas Project – Historical and 2019 Program Drill Hole Locations. July 2019
DH08
DH07
DH04
DH03
DH05
DH09
DH01
DH02
DH10
DH06B
DH06
DH22
DH26
DH29
DH28
DH23
DH20
DH18
DH19
DH24
DH16
DH17
DH21
DH25
DH15
DH14
Pampa
Zone
Atlas
Silver
Zone
Atlas
Gold
Zone
Falda
Zone
Dacitic Domes and
Flows
1,000 m
Fox
Breccia
Steam Heated
Zone Breccia
Background: Bing Image © 2019 Microsoft Corporation © 2019 DigitalGlobe © CNES (2019) Distribution Airbus DS
ATL
-
DH
-
01
ATL
-
DH
-
02
Dacitic Domes and
Flows
Phreatomagmatic
and Hydrothermal Bx
Previous Partner
Drill Holes
Newcrest 2019
program Drill Holes
1,000 m