El Nino Releases Phase 1 Metallurgical Results for the Murray Brook Base 

Metal Deposit, Bathurst Mining Camp, New Brunswick 

January 16, 2013, Vancouver, BC; El Nino Ventures Inc. (“ELN” and the “Company”) (TSX.V: ELN; OTCQX: ELNOF Frankfurt: E7Q) is pleased to announce the results from Phase 1 metallurgical testwork commissioned by its partner, Votorantim Metals Canada Inc. (Votorantim), on samples from the Murray Brook polymetallic deposit, located in the Bathurst  Mining  Camp,  New  Brunswick.  The  purpose  of  the  testwork  was  to  investigate  flotation  options  for sequential recovery of copper, lead and zinc concentrates from Murray Brook feed.

The  metallurgical testwork was completed at RPC  Science & Engineering Laboratories (RPC) in Fredericton  (New Brunswick), under the direction of metallurgists Ross Gilders and Leo Cheung.  Further information on RPC may be found at the laboratories’ website at http://www.rpc.ca

Results 

Testwork  was  completed  on  bulk  drill  core  samples  from  the  Eastern  Zone  and  from  the  Western  Zone  of  the Murray  Brook  deposit  (Figure  1;  Table  1).    The  test  program  consisted  of  sample  preparation  and  compositing, characterization, and batch flotation tests followed by locked cycle tests on a composite sample. The composite sample head grade for the testwork is similar to the grade of the current high confidence Measured resources for Murray Brook.

Locked cycle tests by RPC successfully produced individual copper, lead and zinc concentrates with the following recoveries and grades (Table 2):

  • Recoveries  of  51.4%  copper,  1.7%  zinc,  4.5%  lead,  and  12.5  %  silver  in  a  copper  concentrate  grading  17.5% copper, 6.0% zinc, 6.2% lead, and 591 g/t silver;
  • Recoveries of 36.6% lead, 7.2% copper, 1.4% zinc, and 17.5% silver in a lead concentrate grading 50.3% lead, 2.4% copper, 5.3% zinc, and 833 g/t silver; and
  • Recoveries of 88.8% zinc, 15.8% copper, 8.3% lead and 25.3% silver in a zinc concentrate grading 53.8% zinc, 0.5% copper, 1.1% lead, 95 g/t silver.

A copy of the report is available for viewing on the Company’s website. Additional metallurgical work has been commissioned  by  Votorantim  and  RPC,  which  involves  completing  expanded  and  extended  locked  cycle  tests  to optimize copper, lead and precious metal recoveries in support of a planned Preliminary Economic Assessment in 2013.

Harry  Barr,  Chairman  &  CEO  states:  “The  results  of  the  Phase  1  metallurgical  testwork  on  Murray  Brook  are encouraging,  particularly  the  89%  zinc  recovery  combined  with  good  silver  recovery.  These  initial  metallurgical results plus the results of 18,500 metres of drilling completed since 2011 and the resource estimation of February 2012, confirm the robustness of Murray Brook as this well‐located project is steadily advancing towards the planned completion of a Preliminary Economic Assessment in H1 2013.”

ELN News Release  Page 1 of 5  January 16, 2012

Sampling 

The sample materials were derived from three HQ size drill cores (Table 1).  Hole MB‐2012‐121 was drilled in the Eastern Zone, the shallower and more copper‐rich of the two massive sulfide zones at Murray Brook.  Holes MB‐ 2012‐124  and  MB‐2012‐132  were  drilled  in  the  deeper,  more  zinc‐lead‐precious  metal  rich  Western  Zone. (Description and assay results for each of the three holes are provided in ELN press releases dated July 30, August 14, August 28, 2012). The drill core was logged, split, sampled and shipped to RPC.  Intervals of potential secondary mineralization  and  fracturing  were  sampled  separately.    In  total  3226  kg  of  material  was  delivered  to  RPC  for testwork.

Figure 1. Massive Sulfide Thickness, 10 metre contours: Colour contour map of Murray Brook showing the location of the Eastern Zone and the Western Zone plus the surface trace of the massive sulfides. Metallurgical hole MB‐2012‐121 was drilled in the Eastern Zone.  Metallurgical holes MB‐2012‐124 and ‐132 were drilled in the Western Zone.

ELN News Release  Page 2 of 5  January 16, 2012

Table 1.Drill Core Sample Material for the metallurgical Testwork on Murray Brook

DescriptionZoneSampleMassMassAssays/ValuesDistribution Ratio%
Dist.
g%Cu%Pb%Zn%AgAuCuPbZnAgAu
(g/t)(g/t)
MB‐2012‐121Easternbottom1590833.30.51.01.9420.90660271483152
MB‐2012‐124Westernbottom1590833.30.20.82.9350.263232428.42615
MB‐2012‐132Westernwhole1590833.30.11.75.5590.59117.04953.243534
Summary results: average or total as appropriate477241000.31.23.4450.590100100100100100
Measured*bothaverage0.31.23.5440.500
Meas+Ind*bothaverage0.41.02.6390.510

*Grade of current Measured and Measured + Indicated resources (see Technical Report on www.elnventures.com)

Table 2.Assay and Recovery Results of Locked Cycle Tests for Murray Brook

DescriptionSample/CircuitAssaysRecovery%
Cu%Pb%Zn%Ag (g/t)Au (g/t)CuPbZnAgAu
Feed Gradeblend of 3 holes0.271.153.42450.590
Cu Concentratefinal17.456.166.045911.05151.44.51.712.52
Pb Concentratefinal2.4050.305.278330.9237.236.61.417.51.8
Zn Concentratefinal0.481.0853.78950.36015.88.388.825.35.5

Grindability Tests      

Composite samples for each of the three Murray Brook drill holes were submitted for grindability test work.  Rod Mill Grindability Indices for the Murray Brook bulk sample materials averaged 14.6 kWh/t with a hardness percentile of 55%.  Bond Ball Mill Grindability Indices averaged 10.7 kWh/t with a hardness percentile of 10%.  These data suggest that Murray Brook mineralization is of moderate hardness for a rod mill and lower hardness for a ball mill.

Mineralogy 

SEM‐EDS mineralogical studies of the overall composite sample and each individual drill core by RPC indicate that sphalerite and galena occur as interstitial grains, inclusions, veinlets and attachments to pyrite.  Chalcopyrite occurs as interstitial grains to pyrite.  Chalcopyrite is less common hole MB‐2012‐132, consistent with the lower copper grades  in  the  Western  Zone.    Covellite  is  present  in  MB‐2012‐124.    Generally,  the  principal  silver  mineral  is tetrahedrite.  The sulfide grains are mainly <20 µm in size.  However, sphalerite grains 50‐100 µm in size are present interstitial to pyrite grains.

Flotation 

Primary  bulk  sulfide  rougher  floats  were  carried  out  to  estimate  flotation  performance.    The  reagent  regime included 400 g/t CuSO4, pH 10.0‐10.5, 33.3 g/t 3418A, 10g/t PAX, 15 g/t MIBC and 11 minutes total at 1250 rpm. Rougher  target  liberation  grind  size  was  established  to  be  D80  of  ~30  µm.    Initial  testwork  found  that  flotation

ELN News Release  Page 3 of 5  January 16, 2012

performance was adversely affected by the presence of secondary (oxidized) material. This latter material therefore was excluded from the overall composite sample used in locked cycle testing.

Next Steps 

Additional metallurgical testwork is planned to be carried out by RPC in early 2013.  The results will be reported in a planned  Preliminary  Economic  Assessment  to  be  completed  in  Q1  2013.  The  additional  testwork  will  focus  on optimizing  copper,  lead  and  precious  metal  recoveries,  in  part  through  processing  of  larger  samples  in  bigger equipment.  An expanded metallurgical test program, including pilot plant testing, may be warranted if PEA studies are positive.

Qualified Persons Statement 

This  news  release  has  been  reviewed  and  approved  for  technical  content  by  Ali  Hassanalizadeh  M.Sc.  P.Geo., a qualified Person under the provisions of National Instrument 43‐101.

About El Niño Ventures Inc. Bathurst Projects 

El Niño Ventures Inc. has two active projects in the Bathurst Mining Camp;

1. Murray Brook Project 

The Murray Brook project is a polymetallic, massive sulfide deposit and is the fifth largest deposit discovered to  date in the Bathurst Mining Camp, New Brunswick. The Murray Brook property is located 60 km west of Bathurst. It is supported by excellent infrastructure, including paved roads, grid electricity and communities to provide goods, services and skilled labour.   

A $3 million exploration budget was approved for the 2012 exploration program. It included $2.5 million for drilling to bring resources into the measured category at the Murray Brook deposit and $500,000 for exploration of the Murray Brook and Camel Back properties, both of which are covered by the option agreement with Murray Brook Minerals. To date, more than 28,000 metres of drilling has been completed with encouraging results.  In February 2012, an NI43‐101 compliant resource estimation was announced (see news release). The technical report is filed on SEDAR.com and also available on ELN’s website. An updated NI43‐101 mineral resource estimation and metallurgical test  results  are  slated  for  completion  in  the  first  quarter  of  2013.  Results  of  these  will  be  incorporated  in  a Preliminary Economic Assessment “PEA” that is slated for completion in the first quarter of 2013.

ELN  and  VMC  currently  own  70%  of  the  project,  of  which  35%  is  held  by  each  of  the  two  parties.  Under  a  purchase  agreement  signed  by  VMC  on  August  28,  2012  with  MBM  and  Murray  Brook  Resources  Inc. (collectively the owners), VMC acquired the right to purchase the additional 30% of the Murray Brook Project from the owners. ELN has been provided the option to purchase an additional 15% in the project for a combined total 

of 50% (35% +15%).  

Although the terms of the Participation Agreement provided for a three‐year period to earn the initial 50% and  two years to earn the additional 20%, ELN and VMC completed their earn‐in in less than 18 months. 

2. Bathurst Option Joint Venture Project (BOJV) 

Consists of an initial 4,712 claims in the Tri‐Party Agreement with Xstrata & VM Canada whereby VM Canada may incur  exploration  expenditures  of  $10  million  over  a  period  of  5  years  to  earn  a  50%  interest.  VM  Canada  may further increase its interest to 70% by spending an additional $10 million over 2 years.

Votorantim Metals Canada Inc. Statement 

Technical details in this news release were provided by Votorantim whose professional geologists conduct operations consistent with mineral industry best practices.  Votorantim accepts no responsibility for this

ELN News Release  Page 4 of 5  January 16, 2012

news release.

About Votorantim Metals Canada 

Votorantim Metals Canada Inc. is a subsidiary of Votorantim Metais, a company that is part of the Votorantim Group that  was  founded  in  Brazil  in  1918.  The  Votorantim  Group  operates  in  twenty  countries  and  has  over  40,000 employees. Votorantim Metais is the largest electrolytic nickel producer in Latin America and one of the world's leaders in the production of zinc, aluminum and nickel.   Votorantim Canada Metals Inc. in conjunction with Xstrata Zinc and El Nino Ventures is operator of the Bathurst Option and Joint Venture which is actively exploring for base metal deposits within the Bathurst Mining Camp.

About El Nino Ventures Inc. 

El Niño Ventures Inc. is an international exploration company, focused on exploring for lead, zinc, copper, gold and silver in New Brunswick, Canada and copper in the Democratic Republic of Congo ("DRC").

On Behalf of the Board of Directors

Harry Barr 

Chairman & CEO 

El Niño Ventures Inc. 

Further Information: Tel: +1 604 685 1870 Fax: +1 604 685 8045

Email: [email protected] or visit www.elninoventures.com

650‐555 West 12th Avenue, City Square, West Tower, Vancouver, B.C., Canada, V5Z 3X7

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements. Note:  This release contains forward‐looking statements that involve risks and uncertainties.  These statements may differ materially from actual future events or results and are based on current expectations or beliefs.  For this purpose, statements of historical fact may be deemed to be forward‐looking statements.  In addition, forward‐looking statements include statements in which the Company uses words such as “continue”, “efforts”, “expect”, “believe”, “anticipate”, “confident”, “intend”,  “strategy”,  “plan”,  “will”,  “estimate”,  “project”,  “goal”,  “target”,  “prospects”,  “optimistic”  or  similar  expressions.    These  statements  by  their  nature  involve  risks  and uncertainties, and actual results may differ materially depending on a variety of important factors, including, among others, the Company’s ability and continuation of efforts to timely and completely make available adequate current public information, additional or different regulatory and legal requirements and restrictions that may be imposed, and other factors as may be discussed in the documents filed by the Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk factors that could cause actual results to differ from those contained in the forward‐looking statements.  The Company does not undertake any obligation to review or confirm analysts’ expectations or estimates or to release publicly any revisions to any forward‐looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. Investors should not place undue reliance on forward‐looking statements.

ELN News Release  Page 5 of 5  January 16, 2012