Tuesday, October 20, 2026
MiningNewsTerminal
Tuesday, October 20, 2026 Admin

MQM.V ·

$2 Million Exploration Program Approved for Bathurst Option Joint Venture Project, New Brunswick

Property Options & Staking Exploration Programs Partnerships & JV

NEWS RELEASE

$2 Million Exploration Program Approved for Bathurst Option Joint Venture  Project, New Brunswick 

  • $2 Million  exploration program approved for the Bathurst Option Joint Venture Zinc‐Lead‐ Copper‐Silver project (BOJV), New Brunswick
  • Program focus to be drill testing of priority DIAGNOS exploration targets
  • DIAGNOS delivered 160 targets to Votorantim Canada, operator of the BOJV, of which 13 are 

ranked as priority targets

  • Field  work  on  the  priority  targets  is  underway,  to  be  followed  by  ground  geophysical  and 

geochemical surveys to optimize drill set‐ups

  • Pending outcomes and results, drill testing to commence in late summer or early fall

September  10,  2013,  Vancouver,  BC;  El  Nino  Ventures  Inc.  (“ELN”  and  the  “Company”)  (TSX.V:  ELN; OTCQX: ELNOF Frankfurt: E7Q) is pleased to provide an update on the exploration program planned in 2013 for the Bathurst Option Joint Venture  Project (BOJV) with Votorantim Metals Canada Inc. (VMC) and Glencore (formely Xstrata Zinc Canada).  The area of the BOJV covers much of the world‐class Bathurst Mining Camp in north‐central New Brunswick.

2013 Exploration Program 

The BOJV management committee has approved a $2 million exploration program for the BOJV as proposed by VMC, who is the project operator.

The exploration program is focused on testing the exploration targets generated by DIAGNOS and validated by VMC.  DIAGNOS was retained by VMC in September 2013 to use their proprietary Computer Aided Resources Detection System (CARDS) to identify target areas with a high statistical probability of being associated with base metal mineralization.  DIAGNOS delivered 160 targets to VMC in March 2013.

Field checking of the DIAGNOS target areas is currently underway.  The target areas are distributed throughout the Bathurst Mining Camp.  The next steps in follow‐up could be direct drilling of the targets or ground geophysical and geochemical surveys carried out to optimize drill set‐ups.  Pending outcomes and field work results, drill testing is slated to commence in late summer.

ELN News Release  Page 1 of 3  Sept. 10, 2013

Q Qualified Per rsons Statem ment 

Th his news release has be een reviewed d and appro oved for technical conte ent by Willia am Stone, Ph h.D., P.Geo. w who is a Qualified Person n under the p provisions of f National In nstrument 43 3‐101.

Ba athurst Option Joint Ve enture Project 

Th he BOJV pro oject is a Tr ri‐Party Agre eement with h Xstrata Zin nc Canada ( (now Glenco ore) and VM MC covering m much of the  area of the Bathurst M Mining Camp p in northea astern New  Brunswick ( (Figure 1).   The project co ommenced  in  July  2009

9.  VMC  can  earn  50%  by  spending g  $10  millio on  over  5  y years.  VMC can  further in ncrease  its  interest  to  70%  by  sp pending  an  additional  $10  million n  over  2  more  years.  Exploration ex xpenditures to date by V VMC total ab bout $6.7 mi illion.

BO OJV project  originally consisted of  4712 claims s owned 50 0% ELN and  50% Xstrata a Zinc and 2 2907 claims ow wned 100% by Glencore e, together w with an Area of Interest in which ELN N and Glencore hold equ ual interest. Due to the Ar rea of Interest, the BOJV V generates n new project ts for ELN at no initial co ost.  An exam mple of such Project.

pr roject gener ration for ELN is the Mur rray Brook P

Fi igure  1.  His storical  Land d  tenure  map  showing g  the  locatio on  of  prope erties,  proje ects  and  m mines  in  the Ba athurst Min ning Camp circa 2009 

Votorantim M Metals Canada Inc. State ement 

Te echnical  det tails  in  this  news  relea ase  were  provided  by  VMC  whos se  professional  geologis sts  conduct st practices.  VMC acce op perations co onsistent with mineral i industry bes epts no resp ponsibility fo or this news re elease or any y inferences made from the technical details pro ovided here ein.

EL LN News Release  Page 2 of 3 P Se ept. 10, 2013

About Votorantim Metals Canada Inc. 

VMC  is  a  subsidiary  of  Votorantim  Metais  a  company  that  is  part  of  the  Votorantim  Group  that  was founded  in  Brazil  in  1918.  The  Votorantim  Group  operates  in  twenty  countries  and  has  over  40,000 employees.  Votorantim Metais is the largest electrolytic nickel producer in Latin America and one of the world's leaders in the production of zinc, aluminum and nickel.   VMC is operator of the Bathurst Option and Joint Venture which is actively exploring for base metal deposits within the Bathurst Mining Camp.

About El Nino Ventures Inc. 

El Niño Ventures Inc. is an international exploration company, focused on exploring for lead, zinc, copper, silver and gold in New Brunswick, Canada and copper in the Democratic Republic of Congo ("DRC").

On Behalf of the Board of Directors,

Harry Barr 

Chairman & CEO 

El Niño Ventures Inc. 

Further Information: Tel: +1 604 685 1870 Fax: +1 604 685 8045

Email: [email protected] or visit www.elninoventures.com

650‐555 West 12th Avenue, City Square, West Tower, Vancouver, B.C., Canada, V5Z 3X7

Neither  the  TSX  Venture  Exchange  nor  its  Regulation  Services  Provider  (as  that  term  is  defined  in  the  policies  of  the  TSX  Venture  Exchange)  accepts responsibility for the adequacy or accuracy of this release.

Cautionary  Note  Regarding  Forward  Looking  Statements.  This  release  contains  forward‐looking  statements  that  involve  risks  and  uncertainties.    These statements may differ materially from actual future events or results and are based on current expectations or beliefs.  For this purpose, statements of historical fact may be deemed to be forward‐looking statements.  In addition, forward‐looking statements include statements in which the Company uses words such as “continue”,  “efforts”,  “expect”,  “believe”,  “anticipate”,  “confident”,  “intend”,  “strategy”,  “plan”,  “will”,  “estimate”,  “project”,  “goal”,  “target”,  “prospects”, “optimistic” or similar expressions.  These statements by their nature involve risks and uncertainties, and actual results may differ materially depending on a variety of important factors, including, among others, the Company’s ability and continuation of efforts to timely and completely make available adequate current  public  information,  additional  or  different  regulatory  and  legal  requirements  and  restrictions  that  may  be  imposed,  and  other  factors  as  may  be discussed in the documents filed by the Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk factors that could cause actual results to differ from those contained in the forward‐looking statements.  The Company does not undertake any obligation to review or confirm analysts’ expectations or estimates or to release publicly any revisions to any forward‐looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.  Investors should not place undue reliance on forward‐looking statements.

ELN News Release  Page 3 of 3  Sept. 10, 2013