Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MOON.V ·

8SX0:FRANKFURT Blue Moon Discovers Additional Zone, West of Current Mineral Zone

Drill Results

MOON:TSX-V

BMOOF:OTCQB

8SX0:FRANKFURT

Blue Moon Discovers Additional Zone, West of Current Mineral Zone

November 8, 2021 – Blue Moon Metals Inc. (TSXV: MOON; OTCQB: BMOOF) (the

“Company”) is pleased to report on exploration progress at its property, the polymetallic Blue

Moon project containing zinc, silver, gold, and copper located in the accreted terrains of the

Western Sierra Metamorphic Belt.

Patrick McGrath, Chief Executive officer, stated, "We are excited to announce that our BM-83

exploration hole intersected visible massive and semi-massive sulfide mineralization over 100 feet

of core length. BM-83 was targeting an untested electromagnetic target south of the Blue Moon

deposit and appears to have discovered a new massive sulphide lens.”

Hole BM-83 (Off-Hole Conductor)

A new discovery was made testing a geophysics conductor target, located west of the three

previously discovered Blue Moon mineral zones and south of the American Eagle workings. This

new Zone was dis covered deep and lateral to the previous mineral system. The Zinc Sulfide

(Sphalerite) encountered in this new discovery has a different hue from the other zones which may

indicate a separate emplacement pulse with slightly different timing which could add to the

currently known zones. This conductor was revealed first as stringers and blebs of sulfides were

encountered starting at a core depth of 2,363 feet and continued until the banded and massive

interval from 2,400-2,452 feet (52 feet interval at a vertical depth from surface of approximately

800 feet) then minerali zation tapered off into another stringer zone down to 2 ,461 feet at core

depth. The whole mineral rich zone covered near 100 feet of core length (core length not true

thickness). Higher up in the hole several smaller zones were encountered indicated by the section

and in the table. The mineralization is hosted in rhyolite and rhyolite tuffs of the Gopher Ridge

Formation. The stringer and main zone of sulfides are composed of Sphalerite, Chalcopyrite,

Galena Tetrahedrite and Pyrite. Details of the assay will be discussed as results become available.

In the photos below, the part of the mineralized zone drill interval is displayed.

Photo from Mineral zone of BM -83hole depth 2,440.9 feet. Red brown mineral is sphalerite.

Brassy mineral is Chalcopyrite.

Hole BM -81 (American Eagle)

BM-81 was set to test for continuity of the mineral zone between the old American Eagle workings

near surface and the historical hole AE1 which indicated significant mineral zones. Several

significant zones were intercepted in the drilling which are indicated in Table 1 below. This

confirmed the continuity from the American Eagle workings and historical hole AE1. Details of

the assay will be discussed as results become available.

Blue Moon Long Section

Long section showing pierce points of drill-holes on grid 7600E section with respect to hole BM-

83 and BM-81. Hole BM-84 is the next hole in the drill program. BM-82 was abandoned at 577

feet due to deviation and does not plot on the section . The second attempt was BM-83 which

reached the target.

Blue Moon Cross Section of Discovery Hole BM-83

Cross section showing location of hole BM -83 relative to other holes on section . Stringer

mineralization in Hole B-70 is interpreted to be a feeder zone a nearby massive sulphide lens which

could be what hole BM-83 intersected.

Table 1 Drill hole collar location and intercept Information (downhole intersections in FT)

Drill Hole East North Azimuth Dip Hole depth From (ft) To (ft) Thickness(ft) Grade

BM-81 742,458 4,160,839 238 -65 719 197 262 65 Pending

430 524 94 Pending

559 632 73 Pending

689 707 18 Pending

BM-82 742,448 4,160,391 84 -80 577 none none none

BM-83 744,402 4,153,911 88 -74 2475 161 205 44 Pending

354 379 25 Pending

1204 1384 180 Pending

1799 1869 70 Pending

2363 2461 98 Pending

Mineralized intercepts are core length and not true thickness

About Blue Moon Metals

Blue Moon Metals (TSX.V: MOON; OTCQB: BMOOF) is currently advancing its Blue Moon

polymetallic deposit which contains zinc, gold, silver and copper. The property is wel l located

with existing local infrastructures including paved highways three miles from site; a hydroelectric

power generation facility a few miles from site, three-hour drive to the Oakland port and a four-

hour drive to service centre of Reno. The deposit is open at depth and along strike. The Blue Moon

43-101 Mineral Resource includes 7.8 million inferred tons at 8.07% zinc equivalent (4.95% zinc,

0.04 oz/t gold, 0.46% copper, 1.33 oz/t silver), containing 771 million pounds of zinc, 300,000

ounces of gold, 71 million pounds of copper, and 10 million ounces of silver. The 43-101 Mineral

Resource report dated November 14, 2018 was authored by Gary Giroux, P. Eng., and Lawrence

O’Connor, a QP, and entitled “Resource Estimate for the Blue Moon Massive Sulphide

Occurrence”. The 43-101 and related press release with details on the resource are available on the

company’s website and were filed on www.sedar.com on November 20, 2018. The Company also

holds 100% of the Yava polymetallic project in Nunavut that is in the same volcanic lithologies

and south of Glencore’s Hackett River deposit. More information is available on the company’ s

website (www.bluemoonmetals.com).

Qualified Persons

Richard Walker, CPG, is a qualified person as defined by NI 43 -101, has reviewed the scientific

and technical information that forms the basis for this press release.

For more information please contact:

Patrick McGrath, CEO

+1-832-499-6009

[email protected]

Investor Contact:

Kevin Shum

Investor Relations

+1-647-725-3888 ext702

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Resource estimates included in this news release are forward-looking statements. Although the Company believes the

expectations expressed in such forward -looking statements are based on reasonable ass umptions set forth in the

relevant technical report and otherwise, such statements are not guarantees of future performance and actual results

or developments may differ materially from those in the forward -looking statements. Factors that could cause actual

results to differ materially from those in forward-looking statements include market prices for commodities, the results

of future exploration, uncertainties related to the ability to obtain necessary permits, licenses and titles, changes in

government policies regarding mining, continued availability of capital and financing, drilling results and general

economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of

future performance and actual results or developments may differ materially from those projected in the forward -

looking statements. Readers are cautioned not to place undue reliance on this forward -looking information, which is

given as of the date it is expressed in this press release, and the Company undertakes no obligation to update publicly

or revise any forward-looking information, whether as a result of new information, future events or otherwise, except

as required by applicable securities laws.