Montero identifies initial mineral resource of 3.3M tonnes grading 2.6% LREO5 including 510,000 tonnes averaging 4.4% LREO5 on the eastern ridge of the Wigu Hill Rare Earth Project, Tanzania

Resource Estimates

Toronto,   Ontario   (September   12th,   2011):   Montero   Mining   and   Exploration   Ltd.   (TSX.V:   MON)   (“Montero”)   is   pleased   to announce  the  completion  of  an  independent  NI  43-­‐101  Resource  Estimate  of  the  Tembo  and  Twiga  deposits  on  the  eastern  ridge of  the  Wigu  Hill  carbonatite  complex.  A  total  inferred  mineral  resource  of  3.3  million  tonnes  at  a  grade  of  2.6%  LREO5  (Light   Rare   Earth   Oxide)   has   been   outlined   from   the   preliminary   drilling   program   of   21   boreholes   (2,225m).   A   cut-­‐off   sensitivity   analysis  has  shown  that  the  Inferred  Mineral  Resource  contains  a  higher-­‐grade  portion  consisting  of  510,000  tonnes  averaging   4.4%   LREO5.   The   independent   estimate   was   prepared   by   AMEC   Earth   &   Environmental   Services   Limited   (AMEC)   and   has   an effective  date  of  25  August  2011.

Dr  Tony  Harwood,  President  and  Chief  Executive  Officer  of  Montero  commented,  “We  are  excited  to  report  an  initial   inferred  mineral  resource  of  3.3  million  tonnes  at  2.6%  LREO5  based  on  2,225m  of  drilling,  with  a  higher  grade  core   of  0.51  million  tonnes  at  4.4%  LREO5.  Our  initial  resource  only  represents  shallow  drilling  down  to  150m  from  surface   on   two   of   ten   drill   targets   currently   identified   at   Wigu   Hill   and   we   are   focused   on   adding   to   our   initial   43-­‐101   Compliant   Resource   Estimate   through   exploration   drilling   on   the   remaining   8   targets.   The   resource   is   currently   classified  as  inferred,  however  through  further  in-­‐fill  drilling  and  metallurgical  test-­‐work,  currently  underway,  we  are   confident  it  can  be  upgraded  to  the  indicated  category.  The  results  of  our  initial  resource  combined  with  the  potential   of  the  Tumbili  and  Nyati  targets,  indicate  the  potential  for  a  sizeable  Light  Rare  Earth  deposit.”  

Overview  

AMEC  used  assay  results  from  808  sawn  outcrop  channels  and  914  sawn  half-­‐core  samples  totaling  1,617m  sampled  length, obtained   from   63   trenches   and   21   cored   diamond   drill   holes,   to   develop   the   Mineral   Resource   Estimate   which   is   reported according  to  CIM  Definition  Standards  (2010).

Trenches  were  cut  across  the  trend  of  the  mineralized  structures  at  spacing  of  20m  to  30m  along  strike  in  the  mineralized  zones that  have  been  investigated.  Detailed  sampling  in  2010  had  identified  high-­‐grade  TREO  values  on  the  Tembo  and  Twiga  Targets with  individual  values  of  up  to  26.20%  TREO  and  27.25%  TREO,  respectively  (see  news  release  dated  11/04/2011).  Outcrops  of fresh  crystalline  carbonatite  were  traced  over  distances  of  up  to  300  metres.  The  widths  of  the  carbonatite  dikes  vary  and  the continuity  of  individual  dikes  is  difficult  to  trace  both  along  strike  and  in  depth.  The  anastomosing  nature  of  the  intrusions  makes it  easier  to  correlate  a  zone  of  dikes,  mostly  with  narrow  intercalated  bands  of  highly  altered  and  carbonated  gneisses.  The higher  concentrations  of  rare  earth  oxide  minerals  are  focused  within  the  carbonatite  dikes.  The  dikes  remain  remarkably  fresh, whereas   the   intercalated   gneisses   are   highly   weathered   and   friable.   The   amount   of   mineralisation   in   the   adjacent   altered gneisses  is  often  very  low,  but  ranges  from  0.50%  TREO  to  3.00%  TREO.  The  better  trench  values  were  returned  from  the  Twiga target  from  the  easterly  trending  dike,  where  high-­‐grade  TREO  values  could  be  traced  over  significant  widths  up  to  12m  true width  and  over  a  strike  of  more  than  200m.

Exploration  drilling  by  Montero  on  the  Twiga  and  Tembo  targets  at  the  beginning  of  the  year  achieved  2,225m  of  core  drilling from  21  boreholes  (2  of  which  were  re-­‐drills).  Drill  holes  were  drilled  on  transverse  sections,  with  two  or  three  holes  per  section to  a  maximum  depth  of  about  150m  below  the  surface.  The  drill  holes  were  angled  at  50  degrees  to  intersect  the  mineralized structures  at  a  high  angle  with  intersections  at  spacing  of  between  30m  and  70m  in  the  down  dip  direction  on  individual  drill sections.   Inferred   Mineral   Resources   totaling   3.3Mt   grading   0.82%   La,   1.04%   Ce,   0.08%   Pr,   0.21%   Nd   and   0.01%   Sm   were estimated;   full   details   and   corresponding   REO   grades   are   provided   in   Table   1.   The   effective   date   of   the   Mineral   Resource Estimate   is   August   25,   2011;   the   cut-­‐off   date   for   assay   data   used   in   the   resource   estimate   was   May   8,   2011.     Drilling recommenced  on  the  Twiga  deposit  in  August;  no  new  assay  data  have  yet  been  received  and  to  date  the  geological  information from  the  new  holes  is  consistent  with  the  interpretation  used  as  the  basis  for  the  mineral  resource  estimate.

ZoneTonnage MtResource grades (REEs)Corresponding oxide grades (REOs)
LREE5LaCePrNdSmLREO5La O 2 3CeO 2Pr O 6 11Nd O 2 3Sm O 2 3
%%%%%%%%%%%%
Twiga -­‐ NE Twiga -­‐ SW Tembo -­‐ NW Tembo -­‐ SE1.6 0.5 0.9 0.22.2 0.84 1.03 0.08 0.19 0.01 2.9 1.13 1.40 0.11 0.26 0.02 1.8 0.67 0.89 0.07 0.20 0.01 1.8 0.59 0.90 0.08 0.23 0.012.60.98 1.26 0.10 0.23 0.01 1.33 1.71 0.13 0.30 0.02 0.78 1.09 0.09 0.23 0.02 0.69 1.10 0.10 0.27 0.01
3.6
2.2
2.2
TOTAL3.32.20.821.040.080.210.012.60.961.270.100.240.02
Notes: 1 The effective date for this resource estimate is 25 August 2011. The Qualified Person r esponsible for this resource estimate is Edmund Sides, EurGeol, P.Geo. The resource is reported according to CIM Definition Standards (2010). 2 A selective mining unit (SMU) size of 3m by 3m by 3m was assumed when creating the block model. 3 Reported grades are based on consideration of the grades of mineralised material and weakly to non-­‐mineralised wallrock material estimated to fall inside each SMU. 4 The reported Mineral Resource is based on a grade cut-­‐off of 1.0% LREO5 (sum of estimated grades of LaO, CeO, PrO , NdO 2 3 2 6 11 2 3 and SmO). 2 3 5 The Mineral Resources for the Twiga and Tembo deposits have been constrained by an optimised pit shell defined by the following assumptions; slope angles of 50º; a mining recovery of 100% and mining dilution of 0% (already incorporated in the SMUs); a mining cost of USD2.85/t; process operating costs of USD12.0/t; G&A costs of USD 3.0/t of resource, with 90% recovery of REOs to a 45% LREO5 bastnaesite concentrate; and a concentrate price of USD10/kg.

Table  1:  Wigu  Hill  Inferred  Mineral  Resource  Statement  (Cut-­‐off  of  1%  LREO5)

Cutoff  sensitivity  analysis  

To  outline  a  higher-­‐grade  zone  within  the  above  resource,  AMEC  looked  at  the  grade-­‐tonnage  distribution  with  respect  to  the ‘mineralised  indicator’  value  which  has  been  estimated  for  each  block  and  which  has  been  used  to  determine  the  reported  block grades  (based  on  combination  of  wallrock  and  mineralized  grades).

Where  the  mineralized  indicator  is  close  to  1.0  it  indicates  a  higher  proportion  of  the  block  is  made  up  of  mineralized  material. An  analysis  was   carried  out  of  the  distribution  of  tonnage   and  grade  for  the  blocks  on  which   the  reported  Inferred   Mineral Resource  is  based  (i.e.  blocks  having  LREO5  >1%  and  falling  inside  the  pit  shell  used  to  constrain  the  reported  Mineral  Resource). Based  on  consideration  of  the  factors  used  to  assess  the  prospects  for  economic  extraction  of  the  reported  Mineral  Resource, AMEC  considers  that  applying  a  mineralised  indicator  cut-­‐off  of  0.7  (>=70%  mineralised  material  within  a  SMU)  would  define  a subset  of  the  mineral  resource  estimate  that  would  consist  of  smaller,  higher-­‐grade  mineralised  volumes  that  would  also  have realistic  prospects  for  economic  extraction.  This  sensitivity  case  has  the  sub-­‐set  mineral  resources  as  tabulated  in  Table  2.

ZoneTonnage MtResource grades (REEs)Corresponding oxide grades (REOs)
LREE5LaCePrNdSmLREO5La O 2 3CeO 2Pr O 6 11Nd O 2 3Sm O 2 3
%%%%%%%%%%%%
Twiga -­‐ NE Twiga -­‐ SW Tembo -­‐ NW0.21 0.09 0.214.3 1.68 2.05 0.16 0.38 0.02 5.4 2.12 2.59 0.19 0.47 0.03 2.2 0.82 1.08 0.09 0.24 0.025.21.97 2.52 0.19 0.44 0.03 2.48 3.18 0.23 0.55 0.03 0.96 1.32 0.11 0.28 0.02
6.5
2.7
TOTAL0.513.71.411.760.140.340.024.41.662.160.170.390.02
Notes: 1 The tonnages and grades quoted above are for a high-­‐grade sensitivity sub-­‐set of the total Inferred Mineral Resource and are not additive to it. The tonnages and grades given above are based on selection of only those blocks (SMUs) with >70% mineralised material. Isolated SMUs which could not realistically be mined separately have been excluded from the tonnage reported in this table. 2 The effective date for the resource estimate on which these figures are based is 25 August 2011. The Qualified Person responsible for this resource estimate is Edmund Sides, EurGeol, P.Geo. The resource is reported according to CIM Definition Standards (2010). 3 Reported grades are based on consideration of the grades of mineralised material and weakly to non-­‐mineralised wallrock material estimated to fall inside each SMU. 4 The reported Mineral Resource is based on a grade cut-­‐off of 1.0% LREO5 (sum of estimated grades of LaO, CeO, PrO , NdO 2 3 2 6 11 2 3 and SmO). 2 3 5 The Mineral Resources for the Twiga and Tembo deposits have been constrained by an optimised pit shell defined by the following assumptions; slope angles of 50º; a mining recovery of 100% and mining dilution of 0% (already incorporated in the SMUs); a mining cost of USD2.85/t; process operating costs of USD12.0/t; G&A costs of USD 3.0/t of resource, with 90% recovery of REOs to a 45% LREO5 bastnaesite concentrate; and a concentrate price of USD10/kg.

Table  2:  Wigu  Hill  –  Sensitivity  Case  Subset  of  Mineral  Resources  (Reported  at  a  0.7  mineralised  indicator  cut-­‐off)

The  sensitivity  case  presented  in  Table  2  highlights  the  fact  that  the  Mineral  Resource  contains  some  higher-­‐grade  areas  which may   be   amenable   to   selective   mining;   in   particular   in   the   Twiga   SW   domain.   More   detailed   investigation   of   these   zones   is warranted  in  the  next  phase  of  evaluation  to  try  to  better  define  the  continuity  and  extent  of  such  high-­‐grade  zones.

Resource  estimate  

The  approach  used  for  resource  estimation  included  the  following  steps:

  • The  digital  database  of  all  relevant  trench  and  drill  hole  data  was  compiled  and  validated.
  • The  data  was  then  transferred  to  statistical  and  resource  modelling  software  packages  to  allow  the  calculation  of sample  coordinates  and  additional  analysis.
  • Exploratory   data   analysis   including   preparation   of   histograms,   cumulative   frequency   plots,   boxplots   and calculation  of  summary  statistics  was  completed.
  • The  trench  and  drill  hole  data  were  visualised  on  sections  and  plans  in  order  to  assess  the  vertical  and  lateral continuity  of  the  mineralisation  and  to  assist  in  domain  identification.
  • Based  on  the  results  obtained  in  the  three  previous  steps,  an  indicator  approach  was  selected  for  use  in  resource estimation.  A  mineralised  indicator  value  of  1.0  represents  100%  mineralised  dike,  a  value  of  0.0  represents  0% mineralised  dike  (i.e.  100%  weakly-­‐  or  un-­‐mineralised  wallrock).
  • Regular  1m  down-­‐hole  composites  were  prepared  for  use  in  resource  estimation.
  • A   regular   3-­‐dimensional   block   model   was   established   and   block   values   were   estimated   for   the   mineralised indicator,  grades  of  mineralised  material  and  grades  of  wallrock  material  (weakly-­‐  to  un-­‐mineralised).  Grades were  estimated  for  lanthanum,  cerium,  praseodymium,  neodymium,  samarium,  LREE5,  thorium,  and  uranium.
  • The  estimated  block  values  were  validated  using  statistical  analysis  and  displayed  on  sections  and  plans.
  • Final  block  grades  were  then  determined  as  a  weighted  combination  of  the  estimated  grades  of  mineralised  and wallrock  material,  based  on  the  relative  proportions  of  mineralised  and  wallrock  material  present.
  • In  order  to  ensure  that  the  reported  resource  has  reasonable  prospects  for  economic  extraction,  a  pit  shell  was generated  using  optimistic  economic  parameters  in  order  to  eliminate  isolated  mineralised  blocks  and  material at  depth  that  does  not  have  realistic  prospects  of  being  mined  economically.
  • Resource  summaries  were  then  tabulated  and  grade-­‐tonnage  curves  generated.

Resource  classification:

To  support  an  assessment  of  reasonable  prospects  for  economic  extraction,  AMEC  completed  a  general  review  of  likely  capital and  operating  costs  plus  product  recoveries  and  prices  based  on  an  open-­‐pit  mining  operation,  with  recovery  of  a  bastnaesite concentrate   using   flotation.   Using   parameters,   which   were   considered   realistic,   a   pit   shell   was   developed   to   constrain   the reported  Mineral  Resource  so  as  to  exclude  isolated  zones  of  mineralization  which  were  unlikely  to  be  amenable  to  economic extraction.  The  parameters  used  to  develop  the  resource  pit  shell  are  indicated  in  footnote  4  at  the  bottom  of  Table  1.

Based  on  considerations  of  the  evaluation  database  used,  geological  and  grade  continuity  and  economic  factors,  the  reported resource  has  been  classified  as  an  Inferred  Mineral  Resource.

Risk/opportunity  issues:    

Comparison   of   the   final   resource   model   against   the   original   trench   and   drill   hole   data   used,   indicated   that   in   general   the approach  used  provides  a  reasonably  realistic  representation  of  the  interpreted  geology  and  grade  distributions.  Most  of  the discrepancies  that  were  noted  are  related  to  areas  of  the  deposit  where  more  limited,  wider  spaced,  sampling  is  available.  AMEC concluded   that   the   resource   model   was   acceptable   for   reporting   of   an   Inferred   Mineral   Resource   for   the   Twiga   and   Tembo deposits.

The  Mineral  Resource  identified  to  date  is  relatively  small  and,  due  to  the  discontinuous  nature  of  the  mineralised  dikes,  the reported   grades   incorporates   a   considerable   amount   of   weakly   to   un-­‐mineralised   wall-­‐rock   material.   There   is   scope   for increasing   the   overall   tonnage   potential   of   the   deposit,   or   alternatively   trying   to   identify   larger,   more   continuous   individual mineralised  dikes  where  selective  mining  of  higher-­‐grade  mineralisation  might  be  possible.  These  aspects  should  be  investigated in  the  next  stage  of  the  project.

An   analysis   of   the   grade-­‐tonnage   distribution   for   the   blocks   used   as   the   basis   for   the   reported   Inferred   Mineral   Resource indicates  that  this  contains  a  smaller  higher  grade  portion  which  warrants  further  investigation.  This  resource  is  in  part  related  to the  higher-­‐grade  samples  which  are  more  common  in  the  trench  samples  and  as  such  may  reflect  near  surface  mineralisation which  could  be  extracted  at  an  early  stage  during  the  development  of  a  mining  operation.

Future  work  programs:    

Metallurgical   test   work   on   samples   from   the   property   and   further   drilling,   including   infill   drilling   on   the   Twiga   and   Tembo prospects  as  well  as  drilling  on  other  targets  that  have  been  identified,  is  in  progress.  These  results  will  form  the  basis  for  an updated  resource  estimate  and  further  more  detailed  studies  of  the  property.

The  inferred  mineral  resource  estimate  at  Wigu  Hill  is  very  encouraging  in  that  it  confirms  the  presence  of  a  significant  quantity of  Rare  Earth  Oxide  material  that  is  amenable  to  extraction.  The  tonnage  itself  may  appear  to  be  limited,  however  the  resource reflects  the  potential  of  only  a  fraction  of  the  Wigu  Hill  Complex.  Exploration  and  core  drilling  on  other  defined  targets  at  Wigu Hill   is   progressing   and   greater   potential   exists   in   the   central   portion   of   the   carbonatite   complex   where   more   extensive occurrences  of  mineralized  carbonatite  have  been  located.

Definition  of  REE  Terminology  

The  Mineral  Resource  grades  for  TREE  (Total  Rare  Earth  Elements)  and  corresponding  TREO  (Total  Rare  Earth  Oxides)  grades  in  this  release  include  only  the  5 most  abundant  REEs,  namely  Ce,  La,  Nd,  Pr,  and  Sm.  The  following  oxide  formulae  were  used:  CeO2,  La2O3,  Nd2O3,  Pr6O11  and  Sm2O3;  these  are  based  on  the compositions  used  for  marketed  REOs  for  which  price  information  is  generally  quoted.  The  sum  of  the  analyses  of  the  five  elements  indicated  above  is  referred to  as  LREE5  (and  LREO5  for  the  corresponding  sum  of  the  oxide  grades).  Grades  for  these  five  REEs  make  up  over  99%  of  the  REE  content  at  Wigu  Hill;  the  other ten  REEs  (Eu,  Er,  Dy,  Gd,  Ho,  Tb,  Tm,  Lu,  Y  and  Yb)  are  present  in  trace  amounts  only.  Due  to  the  low  grades  and  unknown  analytical  quality  for  the  remaining  ten REEs,  AMEC  concluded  that  the  available  database  for  these  elements  did  not  support  their  reporting  as  part  of  the  Mineral  Resource.  [Note:  Assay  results reported  in  previous  press  releases  used  the  ‘laboratory  convention’  of  REE2O3  for  the  REO  grades  which  will  give  slightly  different  grades  for  the  oxides  of  Ce and  Pr].

Quality  Assurance/Quality  Control  (QA/QC):  

Montero  has  used  blanks,  field  duplicates  and  one  analytical  standard  to  monitor  the  sampling  and  analytical  quality.  Results  to  date  for  the  blank  and  field duplicates  show  acceptable  quality  for  the  main  REEs  of  interest.  The  standard  used  was  prepared  on  behalf  of  Montero  using  material  from  Wigu  Hill  and  has certified  analytical  values  for  Ce,  La,  Pr  and  Sm  based  on  analyses  from  16  different  laboratories.  A  review  of  the  QA//QC  results  was  completed  by  AMEC  who concluded  that  the  results  for  Ce,  La,  Pr,  Nd  and  Sm  were  acceptable  for  use  in  the  estimation  of  an  Inferred  Mineral  Resource.  A  discussion  of  the  results  will  be incorporated  into  the  Technical  Report  to  be  filed  within  45  days.

Qualified  Person’s  Statement  

The   technical   information   contained   in   this   press   release   has   been   reviewed   by   Mr.   Mike   Evans,   M.Sc.   Pr.Sci.Nat.,   who   is   a qualified   person   for   the   purpose   of   National   Instrument   43-­‐101   and   a   consulting   geologist   to   Montero.   Grab   samples   are selective  by  nature  and  are  unlikely  to  represent  average  grades  on  the  property.  The  independent  estimate  was  prepared  by AMEC   Earth   &   Environmental   Services   Limited   (AMEC)   and   is   reported   according   to   CIM   Definition   Standards   (2010).     The Qualified  Person  responsible  for  the  resource  estimate  is  Edmund  Sides,  EurGeol,  P.Geo.  an  AMEC  employee.

About  Montero  Mining  &  Exploration  

Montero  Mining  and  Exploration  Limited  is  a  mineral  exploration  and  development  company  focused  on  the  development  of  our flagship  Wigu  Hill  Rare  Earth  Element  Project  in  Tanzania.  The  Wigu  Hill  project  is  a  high  grade  undeveloped  Light  Rare  Earth Element   deposit   where   the   company’s   current   focus   is   further   exploration   drilling   to   add   to   our   initial   NI   43-­‐101   Mineral Resource  Estimate.

Rare  Earth  Elements  (a  group  of  15  metals)  are  critical  in  the  advancement  and  development  of  emerging  "green"  technologies and  high-­‐tech  applications  such  as  electric  and  hybrid  vehicles,  wind  and  hydro  power  turbines,  energy  efficient  lighting,  LCD screens,  MRI,  X-­‐ray  machines  and  neodymium-­‐based  magnets  crucial  to  ear-­‐buds,  MP3  Players,  microphones,  mobile  devices and  other  computing  equipment.  Currently  China  produces  97%  of  world  supply  of  REEs  and  these  are  becoming  increasingly critical  to  both  21stCentury  technological  progress  and  environmentally  sustainable  development.  With  the  rising  prices  of  REEs and  China's  control  over  export  quotas,  it  is  becoming  imperative  that  the  rest  of  the  world  develops  new  rare  earth  resources  to meet  the  increasing  demand  from  “green”  technology.

Montero’s  growth  strategy  is  to  develop  the  Wigu  Hill  Rare  Earth  Element  project  and  to  bring  this  to  account  through  eventual rare  earth  production  and  cash  flow.  Montero  plans  to  operate  in  an  environmentally  and  socially  responsible  manner,  adding value  to  all  stakeholders.  Montero  trades  on  the  TSX  Venture  Exchange  under  the  symbol  MON.

Signed.  Dr.  Tony  Harwood  -­‐  President  and  CEO

For  more  information,  contact:

Montero  Mining  and  Exploration  Ltd.  

Tel:  +1  416  840  9197|Fax:  +1  866  688  4671 E-­‐mail:[email protected] www.monteromining.com

CAUTIONARY   STATEMENT:   Neither   TSX   Venture   Exchange   nor   its   Regulation   Services   Provider   (as   that   term   is   defined   in   the   policies   of   the   TSX   Venture Exchange)   accepts   responsibility   for   the   adequacy   or   accuracy   of   this   release.   This   News   Release   includes   certain   "forward-­‐looking   statements".   These statements  are  based  on  information  currently  available  to  the  Company  and  the  Company  provides  no  assurance  that  actual  results  will  meet  management’s expectations.  Forward-­‐looking  statements  include  estimates  and  statements  that  describe  the  Company’s  future  plans,  objectives  or  goals,  including  words  to the  effect  that  the  Company  or  management  expects  a  stated  condition  or  result  to  occur.  Forward-­‐looking  statements  may  be  identified  by  such  terms  as “believes”,  “anticipates”,  “expects”,  “estimates”,  “may”,  “could”,  “would”,  “will”,  or  “plan”.  Since  forward-­‐looking  statements  are  based  on  assumptions  and address  future  events  and  conditions,  by  their  very  nature  they  involve  inherent  risks  and  uncertainties.  Actual  results  relating  to,  among  other  things,  results  of exploration,  project  development,  reclamation  and  capital  costs  of  the  Company’s  mineral  properties,  and  the  Company’s  financial  condition  and  prospects, could  differ  materially  from  those  currently  anticipated  in  such  statements  for  many  reasons  such  as:  changes  in  general  economic  conditions  and  conditions  in the  financial  markets;  changes  in  demand  and  prices  for  minerals;  litigation,  legislative,  environmental  and  other  judicial,  regulatory,  political  and  competitive developments;  technological  and  operational  difficulties  encountered  in  connection  with  the  activities  of  the  Company;  and  other  matters  discussed  in  this  news release.  This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  the  Company’s  forward-­‐looking  statements.  These  and  other  factors  should  be  considered carefully  and  readers  should  not  place  undue  reliance  on  the  Company’s  forward-­‐looking  statements.  The  Company  does  not  undertake  to  update  any  forward-­‐ looking  statement  that  may  be  made  from  time  to  time  by  the  Company  or  on  its  behalf,  except  in  accordance  with  applicable  securities  laws.