Monumental Minerals Samples 405 Mg/L Lithium IN Shallow Brine with a Lithium to Magnesium Ratio of 2.5 at the Laguna Blanca Project, Ii Region, Chile High Grade Lithium Result Achieved Despite Recent Precipitation
MONUMENTAL MINERALS SAMPLES 405 MG/L LITHIUM IN SHALLOW BRINE
WITH A LITHIUM TO MAGNESIUM RATIO OF 2.5 AT THE LAGUNA BLANCA
PROJECT, II REGION, CHILE
HIGH GRADE LITHIUM RESULT ACHIEVED DESPITE RECENT PRECIPITATION
News Release - Vancouver, British Columbia – September 1 , 2022: Monumental Minerals Corp.
(“Monumental” or the “ Company”) (TSX -V: MNRL; FSE: BE5; OTCQB: MNMRF) is pleased to
announce the results of a follow-up shallow brine sampling program at the Laguna Blanca lithium (Li) brine
and cesium (Cs) sediment project (the “Project”), located within the Lithium Triangle, northern Chile.
The Laguna Blanca Project lies within the eastern Andean Geomorphic Belt of Chile’s Central Andean
Altiplano and is located 120 km from the Salar de Atacama, the largest lithium producing salar in the world.
The felsic volcanic rocks of the Central Andean Altiplano are enriched in Li and Cs.
Monumental contracted Atacama Water SpA (“AW”) to undertake a surface brine sampling campaign at
the Company’s Laguna Blanca Project between June 28 and July 6 (Photo 1). Sediment samples were also
collected, results from which are pending. The objective of the program was to confirm results of previous
sampling campaigns carried out by Lithium Chile Inc.
Figure 1. Shallow 1.5 m brine sampling holes made with an auger.
Seven shallow auger holes were completed by Monumental at sites proximal to the Laguna Blanca brine
pool, where the groundwater table was deemed close enough to surface to obtain a brine sample. One brine
sample was also collected from the surface. Analysis of the 4 sample locations that contained brine (three
auger holes and the surface sample) returned lithium values to 405 milligrams per litre (mg/l) , with mean
and median values of 306 mg/l and 297 mg/l, respectively (Figure 1). These lithium values are consistent
with shallow auger samples previously collected by Lithium Chile in 201 9. The favorable lithium results,
plus highly conductive TEM geophysical features deeper in the subsurface (see Monumental Minerals press
release dated June 29, 2022), justify a deeper exploration drilling program.
Figure 1. Near surface brine sample locations and lithium concentrations at the Monumental Minerals Laguna Blanca Project.
Significantly, the ratios of lithium to magnesium (“Mg”) within the Laguna Blanca brine samples range
from 2.5 to 1.8 and are considerably higher than other known projects in Lithium Triangle (Figure 2) .
Besides Li grades, higher ratios of Li:Mg ratios are more favorable for brine-type developments of LCE,
as the geochemical behavior of Mg ions can interfere with the Li purification process. Thus, low magnesium
brines are considered more desirable. While the Laguna Blanca Salar samples were collected from near
surface brines and may not be directly comparable to deeper subsurface brine chemistry o r advanced
projects or producing mines, the results are nonetheless encouraging.
Dr. Jamil Sader, CEO and Director of Monumental, comments:
“The brine results from Laguna Blanca are extremely encouraging. Although the samples were
collected during the wet time of the year, and only 2 weeks after a major snow event, lithium
concentrations are consistent with previous values determined by Lithium Chile in 2019. We are
optimistic that our future drilling results will demonstrate lithium brine concentrations that
significantly exceed these surface values. Additionally, we are excited about the low magnesium
concentrations, as high values can be deleterious for processing.”
Figure 2. The Li/Mg ratio vs Li concentration of Laguna Blanca brines demonstrates both favourable grades and processing
chemistry. The ratio of Li/Mg is significantly better than other lithium brines from the Lithium Triangle. Figure is modified from
Steinmetz et al. 2020. Abbreviations are as follows: AN = Antofalla Botijuelas, AR = Arizaro, CE = Centenario, DI = Diablillos,
HM = Hombre Muerto, IN = Incahuasi, PC = Pocitos -Quirón, PG = Pastos Grandes, PZ = Pozuelos, RA = Ratones, RG = Río
Grande, and RI = Rincón, CA = Cauchari, GG = Guayatayoc, JA = Jama, OL = Olaroz, and SG = Salinas Grandes, ATA =
Atacama, and UYU = Uyuni.
Methodology and QA/QC
A total of 7 sample collection holes were drilled using a gasoline-powered auger to approximately 1.6 m
depth. The holes were temporarily completed with 2 m length, 2 -inch diameter PVC bla nk and screened
casing. Sampling was conducted 48 hours after installation to let water levels equilibrate. Of the 7 auger
holes, 4 did not reach the water table, thus a brine sample could not be obtained. One brine sample was
collected from surface. Brine samples were taken by AW personnel using dedicated plastic bailers and
collected in new, rinsed, one -litre plastic bottles . The bottles were sealed and labelled with the sampling
site, date, and time. All samples were stored in coolers. Field parameters (pH, electrical conductivity,
temperature, and density) were measured at each sample site. QA/QC protocols included the collection field
duplicates and insertion of blank samples into the sample sequence. Following the completion of auger
sampling casings were removed, and holes were back-filled to conform with the Company ESG policy on
minimizing environmental impacts.
Brine samples were submitted to the laboratory of the University of Antofagasta for chemical analysis. The
University of Antofagasta laboratory is independent of Monumental Minerals and the QP. The laboratory
of the University of Antofagasta is not ISO certified, but it is specialized in the chemical analysis of brines
and inorganic salts, and their laboratory quality control and analyti cal procedures are of high quality and
are appropriate with respect to the sample media. The analytical methods used were inductively coupled
plasma optical emission spectroscopy for cations, ion selective electrodes for anions, and titration for
carbonate and bicarbonate determinations.
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved
by Kristopher J. Raffle, P.Geo. (BC) Principal and Consultant of APEX Geoscience Ltd. of Edmonton, AB,
a Director of the Company and a “Qualified Person” as defined in National Instrument 43-101 – Standards
of Disclosure for Mineral Projects. Mr. Raffle verified the data disclosed which includes a re view of the
sampling, analytical and test data underlying the information and opinions contained therein. Monumental
cautions that past results or discoveries on proximate land are not necessarily indicative of the results that
may be achieved on the Laguna Blanca Project.
About Monumental Minerals Corp.
Monumental Minerals Corp. is a mineral exploration company focused on the acquisition, exploration, and
development of mineral resource properties in the critical and electric metals sector. The Company’s
flagship asset is the Jemi HREE project located in Coahuila, Mexico near the Texas, USA border which the
Company has an option to acquire 100% of the 3,650-hectare project. The Company has an option to acquire
a 75% interest and title to the Laguna Blanca project located in Chile.
On behalf of the Board of Directors,
/s/ “Jamil Sader”
Jamil Sader, Chief Executive Officer and Director
Contact Information:
Email: [email protected]
Or
Email: [email protected]
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
References
Steinmetz, R.L.L., Salvi, S., Sarchi, C., Santamans, C. and Steinmetz, L.C.L., 2020. Lithium and brine
geochemistry in the salars of the Southern Puna, Andean plateau of Argentina. Economic Geology, 115(5),
pp.1079-1096.
Forward Looking Information
This news release contains “forward‐looking information or statements” within the meaning of applicable securities
laws, which may include, without limitation, the potential plans for the Company’s projects , the timing, completion
and expected outcomes of the next phase of exploration work on the Laguna Project, other statements relating to the
technical, financial and business prospects of the Company, its projects and other matters. All statements in this news
release, other than statements of historical facts, that address events or developments that the Company expects to
occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward -
looking statements are based on reasonable assumptions, such statements are not guarantees of future performance
and actual results may differ materially from those in the forward-looking statements. Such statements are based on
numerous assumptions regarding present and future business strategies and the environment in which the Company
will operate in the future, including the price of metals, the ability to achieve its goals, that general business and
economic conditions will not change in a material adverse manner and that financing will be available if and when
needed and on reasonable terms. Such forward -looking information reflects the Company’s views with respect to
future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the
interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates and the
potential for unexpected costs and expenses and those other risks filed under the Company’s profile on SEDAR at
www.sedar.com. While such estimates and assumptions are considered reasonable by the management of the
Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and
risks. Factors that could cause actual results to differ materially from those in forward looking statements include, but
are not limited to, continued availability of capital and financing and general economic, market or business conditions,
failure to secure personnel and equipment for work programs , adverse weather and climate conditions, risks relating
to unanticipated operational difficulties (including failure of equipme nt or processes to operate in accordance with
specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays
in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to
health, safety and environmental matters), risks relating to inaccurate geological assumptions, failure to maintain all
necessary government permits, approvals and authorizations, failure to obtain surface access agreements or
understandings from local communities, land owners or Indigenous groups, fluctuation in exchange rates, the impact
of Covid-19 or other viruses and diseases on the Company’s ability to operate, an inability to predict and counteract
the effects of COVID-19 on the business of the Company, including but not limited to, the effects of COVID -19 on
the price of commodities, capital market conditions, restriction on labour and international travel and supply chains ,
decrease in the price of rare earth elements, lithium, cesium and other metals, loss of key employees, consultants, or
directors, failure to maintain community acceptance (including from the Indigenous communities), increase in costs,
litigation, and failure of counterparties to perform their contractual obligations . The Company does not undertake to
update forward‐looking statements or forward‐looking information, except as required by law.