Monumental Minerals Provides Corporate and Operational Update
MONUMENTAL MINERALS PROVIDES CORPORATE AND OPERATIONAL
UPDATE
News Release - Vancouver, British Columbia – November 1 , 2022: Monumental Minerals Corp.
(“Monumental” or the “ Company”) (TSX -V: MNRL; FSE: BE5; OTCQB: MNMRF) is pleased to
provide a corporate and operational update regarding business initiatives and project development.
Corporate
As announced on September 15, 2022, Monumental Minerals has retained Ocean Wall Ltd (“Ocean Wall”)
to act as strategic and corporate advisor to the company. Max Sali, Vice President of Corporate
Development recently presented at an event held at Ocean Wall ’s corporate office in London (UK) .
Investors included fund managers and ultra high net worth (UHNW) individuals and family offices.
Max Sali, VP of Corporate Development comments
“Retaining Ocean Wall to help Monumental with strategic and corporate aspects is a great
opportunity for us. Their close relationships with high-quality investors in Europe who are
looking for a pure critical metals play related to the automotive sector will help open new doors
for Monumental.”
Turi and Laguna Blanca Projects
As announced on October 3, 2022, Monumental Minerals signed the Definitive Agreement to acquire a
50.01% interest in the Salar de Turi Project located in the lithium triangle in the Antofagasta region (Region
II), Chile. The Turi Project is accessible from the city of Calama (60 km to the southwest) via the paved
roads 21CH, and B-165 and is close to infrastructure.
• Near surface brine sampling carried out by Lithium Chile in 2019 returned values of lithium to 590
mg/l (see Lithium Chile Press Release Jan uary 16, 2019). The samples also reveal favourable
chemistry with ratios of lithium to potassium of 0.06 and lithium to magnesium of 0.2, very similar
to brines from the Salar de Atacama1.
• Transient electromagnetic (TEM) geo physics survey conducted by Lithium Chile delineated
conductive anomalies that could potentially represent lithium-bearing brines at depth . These
anomalies are shallow northeast-dipping, are 150 – 300 metres (m) below surface, are at least 200
to 300 m thi ck and often open at depth (see Lithium Chile Press Release April 30, 2019) . The
spatial extent is at least an 18 square kilometre (km2) area.
On September 1, 2022, Monumental Minerals announced results from shallow hand-auger holes at Laguna
Blanca that included brine samples returning 405 mg/l lithium despite recent precipitation interpreted to
have diluted the near surface brines. Samples returned a favourable lithium to magnesium ratio to of 2.5:1
(Figure 1) as higher ratios of Li:Mg ratios are more attractive for production of lithium from brine. The
geochemical behavior of high concentrations of Mg ions can interfere with the Li production and
purification process. The Company anticipates a drill program will commence at Laguna Blanca during Q1
2023.
Monumental’s CEO, Dr. Jamil Sader will be visiting both projects in early November 2022 to accompany
local community members and contractors on site visits to the increased land package at Laguna Blanca
(Monumental Press Release October 18, 2022) and at Turi . Dr. Sader will also meet with contractors and
consultants in Santiago and La Serena, Chile.
1 Not necessarily indicative of mineralization on Monumental Minerals properties
Figure 1. The Li/Mg ratio vs Li concentration of Laguna Blanca brines demonstrates both favourable grades and
processing chemistry. The ratio of Li/Mg is significantly better than other lithium brines from the Lithium Triangle.
Figure is modified from Steinmetz et al. 2020. Abbreviations are as follows: AN = Antofalla Botijuelas, AR = Arizaro,
CE = Centenario, DI = Diablillos, HM = Hombre Muerto, IN = Incahuasi, PC = Pocitos -Quirón, PG = Pastos
Grandes, PZ = Pozuelos, RA = Ratones, RG = Río Grande, and RI = Rincón, CA = Cauchari, GG = Guayatayoc, JA
= Jama, OL = Olaroz, and SG = Salinas Grandes, ATA = Atacama, and UYU = Uyuni.
Jemi
A field exploration program commenced at the Jemi Project in Mexico in late August 2022 and is presently
on-going. This program aims to reduce the exploration search space from approximately 800 hectares , as
defined by an airborne radiometric survey (see Monumental Minerals press release dated May 3, 2022), to
discreet drill targets. The program consists of detailed geological mapping, regional stream sediment
sampling, ground radiometric geophysical surveys, and lithogeochemistry.
To date, the stream sediment program has been completed and results received from a total of 47 samples.
Stream sediments are an effective exploration tool, defining the mineralization fingerprint of each
catchment area to prioritize follow-up exploration. Of the 47 stream samples, a total of five (5) samples
returned values greater than 7.8 parts-per-million (ppm) dysprosium (Dy), 65.3 ppm neodymium (Nd); and
up to 14.1 ppm Dy and 160 ppm Nd. These anomalous concentrations of rare earth elements (REE) have
defined four (4) general areas of interest along the west and south portions of the Company’s concessions
(Figure 2). Only tw o of the four areas are associated with known HREE mineralized (eudialyte bearing)
peralkaline rock (Jemi Dyke Area and Veladora North) (Figure 2). The remaining two areas with anomalous
Dy and Nd concentrations were previously unrecognized as being prospective (Zone 2 and Zone 4). Follow-
up exploration work to identify the source of the high REEs at these two areas will be undertaken during
the current field program for quick delineation.
Dr. Jamil Sader, CEO and Director comments:
“The definition of two additional areas of prospectivity at the Jemi Project is a significant step
forward in defining additional drilling targets and expanding the potential mineralized footprint.
We plan to follow up on these two additional areas in short order with mapping, and
lithogeochemical sampling to identify further mineralized peralkaline rocks. The Jemi
exploration program is rapidly providing the additional clarity required to select the best drill
hole locations.”
Figure 2. Locations of anomalous REE contents in stream sediments over the western concessions of Monumental’s
Jemi project.
Grant of Stock Options
The Company has granted incentive stock options to certain of its directors and consultants to purchase up
to an aggregate 337,875 common shares of the Company at a price of $0.25 per common share for a period
of three years, with the options vesting immediately.
Methodology and QQA/QC
The analytical work reported on herein was performed by ALS Canada Ltd. (ALS) at Hermosillo, Mexico
(sample preparation) and Vancouver, B.C. (ICP-MS). ALS is an ISO-IEC 17025:2017 and ISO 9001:2015
accredited geoanalytical laboratory and is independent of Monumental Minerals and the QP. Stream
samples were subject to sieving at 180 micron (80 mesh). A 0.25-gram sample of the fine fraction was then
subject to multi-element ICP-AES/MS analysis via 4-acid digestion to determine individual REE content
(ME-MS61r). Four acid digestions can dissol ve most minerals , however REE values represent the acid
leachable portion of the REE minerals, which the Company deems appropriate for early-stage stream basin
target delineation. Monumental Minerals and the QP detected no significant QA/QC issues during r eview
of the data, and is not aware of any sampling, or other factors that could materially affect the accuracy of
the results.
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved
by Kristopher J. Raffle, P.Geo. (BC) Principal and Consultant of APEX Geoscience Ltd. of Edmonton, AB,
a Director of the Company and a “Qualified Person” as defined in National Instrument 43-101 – Standards
of Disclosure for Mineral Projects. Mr. Raffle verified the data disclosed which includes a review of the
sampling, analytical and test data underlying the information and opinions contained therein.
About Monumental Minerals Corp.
Monumental Minerals Corp. is a mineral exploration company focused on the acquisition, exploration, and
development of mineral resource properties in the critical and electric metals sector. The Company’s
flagship asset is the Jemi HREE project located in Coahuila, Mexico near the Texas, USA border which the
Company has an option to acquire 100% of the 3,650-hectare project. The Company has an option to acquire
a 75% interest and title to the Laguna cesium-lithium brine project located in Chile and a 50.01% interest
in the Salar De Turi lithium project in Chile.
On behalf of the Board of Directors,
/s/ “Jamil Sader”
Jamil Sader, Chief Executive Officer and Director
Contact Information:
Email: [email protected]
Or
Max Sali, VP Corporate Development and Director
Email: [email protected]
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news
release.
Forward Looking Information
This news release contains “forward‐looking information or statements” within the meaning of applicable securities
laws, which may include, without limitation, the potential plans for the Company’s projects, completion of exploration
work on Jemi, the expected timing and completion of these work programs and potential drilling, potential
developments from Ocean Wall, completing project site visits, , other statements relating to the tec hnical, financial
and business prospects of the Company, its projects and other matters. All statements in this news release, other than
statements of historical facts, that address events or developments that the Company expects to occur, are forward-
looking statements. Although the Company believes the expectations expressed in such forward -looking statements
are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may
differ materially from those in the forward-looking statements. Such statements are based on numerous assumptions
regarding present and future business strategies and the environment in which the Company will operate in the future,
including the price of metals, the ability to achieve its goals, that general business and economic conditions will not
change in a material adverse manner and that financing will be available if and when needed and on reasonable terms.
Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks,
uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results,
risks related to the inherent uncertainty of exploration and cost estimates and the potential for unexpected costs and
expenses and those other risks filed under the Company’s profile on SEDAR at www.sedar.com. While such estimates
and assumptions are considered reasonable by the management of the Company, they are inherently subject to
significant business, economic, competitive and regulatory uncert ainties and risks. Factors that could cause actual
results to differ materially from those in forward looking statements include, but are not limited to, continued
availability of capital and financing and general economic, market or business conditions, failure to secure personnel
and equipment for work programs, adverse weather and climate conditions, risks relating to unanticipated operational
difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations,
cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government
approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and
environmental matter s), risks relating to inaccurate geological assumptions, failure to maintain all necessary
government permits, approvals and authorizations, failure to obtain surface access agreements or understandings from
local communities, land owners or Indigenous groups, fluctuation in exchange rates, the impact of Covid-19 or other
viruses and diseases on the Company’s ability to operate, an inability to predict and counteract the effects of COVID-
19 on the business of the Company, including but not limited to, the effects of COVID-19 on the price of commodities,
capital market conditions, restriction on labour and international travel and supply chains, decrease in the price of rare
earth elements, lithium, cesium and other metals, loss of key employees, consultants, or directors, failure to maintain
community acceptance (including from the Indigenous communities) , increase in costs , litigation, and failure of
counterparties to perform their contractual obligations. The Company does not undertake to update forward‐looking
statements or forward‐looking information, except as required by law.