Key Highlights
Pilot scale results indicate Battery Hill material is very amenable to ore sorting:
• Mill feed grade can be increased by 80%.
• Testing was conducted with full size production equipment, not lab scale.
• By increasing mill feed grade, ore sorting is projected to positively impact
CAPEX, OPEX, and production cost per tonne, leading to enhanced Project
economics.
• Discussions underway to integrate ore sorting into the Battery Hill Pre -
Feasibility Study (“PFS”) program.
Montreal, Quebec – August 12, 2025 – Manganese X Energy Corp. (TSXV: MN) (FSE: 9SC)
(TRADEGATE: 9SC) (OTCQB: MNXXF) (the “ Company” or “ Manganese X ”) is pleased to
announce highly positive Phase 2 ore-sorting results, demonstrating an 80% increase in mill feed
grade in its large scale Battery Hill pilot program, managed by ABH Engineering.
An 80% increase in mill feed grade means that, after ore-sorting, the material sent to the mill
contains 80% more manganese per tonne than the original mined material.
The ore-sorting program was performed at RADOS Technologies lab in South Africa where over
400kg of rock from the Company’s Battery Hill manganese deposit near Woodstock, New
Brunswick, was processed. The sample was split into two size fractions and tested using full-scale
production equipment. Through ore sorting, waste rock was effectively removed, pre -
concentrating the rock before further processing.
This ore-sorting process is also projected to deliver significant capital expenditure (CAPEX) and
operating cost (OPEX) savings, potentially supporting a strong outcome in the Company’s
upcoming PFS.
Results confirm that Battery Hill material is highly amenable to ore -sorting, enabling substantial
improvements in feed grade while providing significant potential capital and operating costs
savings.
The study was conducted in preparation for the Company’s PFS, scheduled to commence in Q3
2025. Manganese X is having ongoing discussions with lead consultants regarding the integration
of ore-sorting into the Battery Hill PFS program.
CEO Martin Kepman commented , “We are highly encouraged by the results of this large -scale
pilot program, which confirm the economic potential of the ore -sorting technology we are
employing. These findings strongly support the viability of integrating this process into our
operations. By increasing mill feed grade, ore sorting is projected to positively impact CAPEX,
OPEX, and production cost per tonne.”
He continued, “With higher-grade feed, a smaller facility can produce more metal, while the ability
to create low -grade stockpiles enables very high upgrade ratios and maximizes resource
utilization. Potential benefits also include improved project NPV and IRR, reduced energy and
water consumption, expanded resources through cut-off grade reduction, and decreased tailings
storage requirements - along with the associated reduction in environmental impact.”
Brent Hilscher, VP of Mineral Processing at ABH Engineering, added, “The Manganese X results
are an excellent example of what we call a ‘clean sort’ or ‘sharp separation.’ The high-grade rock
can be easily concentrated with very high recovery rates. The impact of higher mill feed grade on
project economics can be profound.”
Ore-Sorting Details:
• Results are consistently positive between 10mm and 100mm feed sizes.
• Pilot plant used a large sample over 400kg.
• Testing was conducted on full size production equipment, not lab scale.
• Potential mill feed grades of 10% to 15% manganese (Mn) were achievable, with full scale
production equipment. Potential to stockpile medium grade rock by XRF system in single
stage three-way split.
Table 1: XRF sorting average results for -100mm +10mm
Mass Pull Mn Product
Grade
Mn Reject
Grade
Upgrade
Ratio
(%) (%) (%)
Operating Condition 1 36% 15.7% 3.5% 2.0
Operating Condition 2 51% 13.5% 2.0% 1.7
Operating Condition 3 65% 11.4% 1.3% 1.5
Operating Condition 4 80% 9.6% 0.9% 1.2
Operating Condition 5 90% 8.6% 0.6% 1.1
Sorter Head Grade 7.86%
This news release has been reviewed and approved by Brent Hilscher , P.Eng., VP of Mineral
Processing at ABH Engineering Inc. , a Qualified Person under National Instrument 43 -101
Standards of Disclosure for Mineral Projects.
About Manganese X Energy Corp.
Manganese X's mission is to advance its Battery Hill project into production, thereby becoming
the first public actively traded manganese mining company in Canada and US to commercialize
EV compliant high purity manganese, potentially supplying the North American supply chain. The
Company intends on supplying value -added materials to the lithium -ion battery and other
alternative energy industries, as well as striving to achieve new carbon -friendly more efficient
methodologies, while processing manganese at a lower competitive cost.
For more information visit the Company’s website at www.manganesexenergycorp.com.
On behalf of the Board of Directors of
MANGANESE X ENERGY CORP.
Martin Kepman
CEO and Director
Email: [email protected]
Tel: 1-514-802-1814
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Cautionary Note Regarding Forward-Looking Statements:
This news release contains certain “forward-looking information” and “forward-looking statements”
(collectively “forward-looking statements”) within the meaning of applicable securities legislation.
All statements, other than statements of historical fact, included herein, without limitation,
statements relating to the future operations and activities of Manganese X, are forward -looking
statements. Forward-looking statements in this news release relate to the Company’s goals and
plans for 2025, the impact t hat increasing mill feed grade may have on project economics at
Battery Hill, any integration of ore sorting into the PFS, and the commencement of the PFS. There
can be no assurance that such statements will prove to be accurate, and actual results and future
events could differ materially from those anticipated in such statements. Forward -looking
statements reflect the beliefs, opinions and projections on the date the statements are made and
are based upon a number of assumptions and estimates that, while considered reasonable by
Manganese X, are inherently subject to significant business, economic, competitive, political and
social uncertainties and contingencies. Many factors, both known and unknown, could cause
actual results, performance or achievements to be materially different from the results,
performance or achievements that are or may be expressed or implied by such forward -looking
statements and the parties have made assumptions and estimates based on or related to many
of these factors. These risks, as well as others, are disclosed within the Company's filings on
SEDAR+ (www.sedarplus.ca), which investors are encouraged to review prior to any transaction
involving the securities of the Company. Readers should not place undue reliance on the forward-
looking statements. Manganese X does not assume any obligation to update the forward-looking
statements if beliefs, opinions, projections, or other factors, should change, except as required by
applicable securities laws.