Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MMY.V ·

Monument’s Drill Assay Results Highlight Selinsing Gold Mine Expansion Potential

Drill Results

1 | 26

May 29, 2026 News Release Release #04-2026

Monument’s Drill Assay Results Highlight Selinsing Gold Mine Expansion Potential

Vancouver, B.C., May 29 , 2026 - Monument Mining Limited (TSX -V: MMY and FSE: D7Q1)

("Monument" or the "Company") is pleased to announce the results of a n additional twenty-three

(23) holes that have been received with high gold assay results from the Buffalo Reef/Felda areas and

updated drilling activities , under the mine expansion drilling program at the Selinsing Gold Mine ,

located in Pahang State in the Central Gold Belt of Western Malaysia.

Ms. Cathy Zhai, President and CEO of Monument commented: "The drill assay results reported in this

announcement underlie the strong potential for resource addition outside of the Life of Mine (“LOM”)

and the Expanded Pit Shell. We have deployed more drill rigs and continue to improve the efficiency

of exploration.”

The Stage 1 and Stage 2 drilling for mine expansion program have completed, including 123 holes for

17,136m, compared to the planned 118 holes for 17,477m. Further drilling programs are under review.

DRILL PROGRAM HIGHLIGHTS

Results from twenty-three (23) completed drill holes of the Buffalo Reef/Felda Mine Expansion Drilling

Program have been received (Appendix A), with high gold assay results returned.

Significant highlights include:

Stage 1

BRC2 / BRC3 Gap

o MBRDD622: 6.5m @ 0.66g/t Au from 148.9m includes:

2.5m @ 1.35g/t Au from 152.9m

o MBRDD624: 3.8m @ 3.77g/t Au from 109.7m

o MBRDD625: 3.6m @ 3.58g/t Au from 136.9m

o MBRDD628: 6.2m @ 1.4g/t Au from 61.6m

0.8m @ 3.25g/t Au from 68.9m

3.0m @ 5.66g/t Au from 78.9m

1.1m @ 13.9g/t Au from 94.3m

5.8m @ 1.68g/t Au from113.4m

o MBRRC632: 2.2m @ 1.73g/t Au from 0.0m

2.0m @ 2.0g/t Au from 32.2m

15.5m @ 2.61g/t Au from 67.7m includes:

6m @ 5.62g/t Au from 72.7m

o MBRRC636: 3.9m @ 1.98g/t Au from 81m

o MBRDD641: 21.0m @ 1.99g/t Au from 42m includes:

4.5m @ 3.66g/t Au from 52.5m

2 | 26

o MBRDD642: 6.7m @ 1.53g/t Au from 70.3

3.8m @ 4.60g/t Au from 96m

BRC3 / BRC 4 Gap

o MBRDD633: 1.3m @ 2.14g/t Au from 16.1m

o MBRDD637: 4.8m @ 2.81g/t Au from 26.0m

o MBRDD643: 7.6m @ 0.53g/t Au from 59.9m

Stage 2

BRC2/BRC3 Mineralization Extension

o MBRDD623: 2.6m @ 1.25g/t Au from91.3 m

4.5m @ 1.54g/t Au from 164.0m

o MBRDD626: 16.5m @ 3.07g/t from 64.1m

o MBRDD627: 10.1m @ 4.68g/t Au from 63.7m

3.4m @ 3.47g/t Au from 84.7m

o MBRDD629: 7.0m @ 3.10g/t Au from 39.0m

o MBRDD630: 1.7m @ 2.17g/t Au from 21.3m

5.3m @ 3.49g/t Au from 59.0m

6.0m @ 2.64g/t Au from 78.5m

o MBRDD631: 6.1m @ 6.12g/t Au from 44.2m

o MBRDD645: 1.0m @ 1.21g/t Au from 22.5m

o MBRDD646: 4.5m @ 1.47g/t Au from 100.5m

BRC3 Mineralization Extension

o MBRDD635: 8.1m @ 1.27g/t Au from 6.9m

3.0m @ 7.53g/t Au from 79.5m

3.0m @ 2.95g/t Au from 88.5m

12.5m @ 1.52g/t Au from 94.5m

6.5m @ 2.39g/t Au from 113.5m

o MBRDD638: 19.8m @ 1.90g/t Au from 100.7m includes:

4.3m @ 2.93g/t Au from 110.2

o MBRDD639: 22.5m @ 1.77g/t Au from 58.5m includes:

7.5m @ 3.58g/t Au from 64.5m

o MBRDD644: 5.5m @ 1.92g/t Au from 16.2m

Note: the reported intervals are downhole lengths and do not represent true widths. True widths will

be determined once geological modelling has been completed.

BUFFALO REEF/FELDA MINE EXPANSION DRILLING

Buffalo Reef/Felda mine expansion drilling (Figure 1) contains Stage 1 and Stage 2 as a part of the

Selinsing gold mine expansion program. The target area covers 115 acres of land, laying the foundation

to evaluate the potential to extend the currently defined Mineral Resources , and to convert the

3 | 26

current resources to reserves that are currently constrained by tenement boundaries. Success of

exploration may potentially support the pit expansion at Buffalo Reef/Felda [1] and inform future LOM

planning, subject to the tenement extension.

Figure 1: Long section through Buffalo Reef Central depicting Mine Expansion target Areas (Stage 1 and Stage 2) targeted

in the Mine Expansion Drilling, looking west.

An additional twenty-three (23) assay results were received from diamond drill holes (Figure 1 and

Figure 2). Drill holes continue to intersect multiple zones of gold mineralization in Stage 1 and Stage 2

targets. Continuity betwe en previously modelled mineralized domains, and mineralized intervals

intersected in drill holes , and between some drill holes is evident , which will likely result in an

increased Inferred Mineral Resource.

[1] TSX: Monument announces commencement of expansion drilling program at Selinsing Gold Mine (July 7, 2025).

4 | 26

Figure 2: Plan view of the Buffalo Reef Central (BRC2, BRC3 & BRC4), showing reported assay results (orange callouts),

along with previously reported results [2] (white callouts). Blue symbols are holes waiting for results. Drilling is generally

orientated from

5 | 26

Figure 3: Plan view of BRC3 Pit, showing reported assay results (orange callouts) along with previously reported results

[2] (white callouts). Blue symbols are holes waiting for results. Drilling is generally orientated from east to west.

6 | 26

Table 1: Buffalo Reef/Felda Mine Expansion Drilling results. The reported intervals are downhole lengths and do not

represent true widths. True widths will be determined once geological modelling has been completed.

Hole ID Intercept Comments

1 MBRDD622: 4.2m @ 0.55g/t Au from 37.5m

14.4m @ 0.64g/t Au from 46.6m

1.0m @ 0.32g/t Au from 86.0m

4.0m @ 0.49g/t Au from 93.0m

0.7m @ 0.60g/t Au from 100.5m

0.9m @ 0.32g/t Au from 122.2m

1.4m @ 0.84g/t Au from 138.2m

1.0m @ 0.23g/t Au from 143.5m

6.5m @ 0.66g/t Au from 148.9m

includes 2.5m @ 1.35g/t Au from

152.9m

BRC2/BRC3 Stage 2

2 MBRDD626: 16.5m @ 3.07g/t Au from 64.1m BRC2/BRC3 Stage 2

3 MBRDD627: 10.1m @ 4.68g/t Au from 63.7m

3.4m @ 2.47g/t Au from 84.7m

1.6m @ 0.43g/t Au from 91.2m

BRC2/BRC3 Stage 2

4 MBRDD629: 2.0m @ 0.22g/t Au from 35.5m

7.0m @ 3.10g/t Au from 39.0m

0.5m @ 0.29g/t Au from 54.7m

2.6m @ 0.32g/t Au from 61.8m

BRC2/BRC3 Stage 2

5 MBRDD630: 1.7m @ 2.17g/t Au from 21.3m

5.3m @ 3.49g/t Au from 59.0m

6.0m @ 2.64g/t Au from 78.5m

BRC2/BRC3 Stage 2

6 MBRDD631: 6.1m @ 6.12g/t Au from 44.2m

4.6m @ 0.50g/t Au from 54.4m

BRC2/BRC3 Stage 1

7 MBRDD632 2.2m @ 1.73g/t Au from 0.0m

3.0m @ 2.0g/t Au from 32.2m

15.5m @ 2.61g/t Au from 67.7m

includes

6m @ 5.62g/t Au from 72.7m

BRC2/BRC3 Stage 2

8 MBRDD637 1.6m @ 0.43g/t Au from 0.0m

4.8m @ 2.81g/t Au from 26.0m

0.7m @ 1.99g/t Au from 48.7m

0.9m @ 0.49g/t Au from 56.8m

BRC3/BRC4 Stage 2

9 MBRDD642 1.0m @ 0.86g/t Au from 59.0m

1.4m @ 0.68g/t Au from 64.6m

6.7m @ 1.53g/t Au from 70.3m

3.8m @ 4.60g/t Au from 96.0m

0.9m @ 4.0g/t Au from 122.1m

BRC2/BRC3 Stage 2

10 MBRDD643 3.0m @ 0.33g/t Au from 4.5m

7.6m @ 0.53g/t Au from 59.9m

2.0m @ 0.43g/t Au from 71.5m

BRC3/BRC4 Stage 1

BRC3/BRC4 Stage 2

(continue to next page)

7 | 26

(continued from previous page)

Table 2: Buffalo Reef/Felda Mine Expansion Drilling results. The reported intervals are downhole lengths and do not

represent true widths. True widths will be determined once geological modelling has been completed.

Hole ID Intercept Comments

11 MBRDD644 1.5m @ 0.31g/t Au from 1.5m

5.5m @ 1.92g/t Au from 16.2m

1.8m @ 0.99 g/t Au from 38.2m

11.5m @ 1.90 g/t from 83.6m

BRC2/BRC3 Stage 2

BRC2/BRC3 Stage 1

MBRDD623 1.5m @ 0.63g/t Au from 51.5m

0.9m @ 0.28g/t Au from 56.0m

2.6m @ 1.25g/t Au from 91.3m

4.5m @ 1.54g/t Au from 164.0m

BRC2 Stage 2

MBRDD624 0.8m @ 0.82g/t Au from 68.6m

3.8m @ 3.77g/t Au from 109.7m

BRC2/BRC3 Stage 2

MBRDD625 1.5m @ 0.21g/t Au from 9.9m

1.5m @ 0.24g/t Au from 14.4m

1.5m @ 0.26g/t Au from 45.9m

5.6m @ 3.58g/t Au from 136.9m

BRC2/BRC3 Stage 2

MBRDD628 1.5m @ 0.55g/t Au from 2.4m

0.7m @ 4.3g/t Au from 58.9m

6.2m @ 1.4g/t Au from 61.6m

0.8m @ 3.25g/t Au from 68.9m

3.0m @ 5.66g/t Au from 78.9m

1.1m @ 13.9g/t Au from 94.3m

5.8m @ 1.68g/t Au from 113.4m

BRC2/BRC3 Stage 2

MBRDD633 1.3m @ 2.14g/t Au from 16.1m BRC3/BRC4 Stage 1

MBRDD635: 8.1m @ 1.27g/t Au from 6.9m

3.0m @ 7.53g/t Au from 79.5m

0.7m @ 0.48g/t Au from 85.5m

3.0m @ 2.95g/t Au from 88.5m

12.5m @ 1.52g/t Au from 94.5m

6.5m @ 2.39g/t Au from 113.5m

BRC3 Stage 2

MBRDD636: 3.9m @ 1.98g/t Au from 81.0m BRC3 Stage 2

MBRDD638 19.8m @ 1.90g/t Au from 100.7m

includes:

[email protected]/t Au from 100.7m and

2.8m @ 2.31g/t Au from 105.4m and

4.3m @ 2.93g/t Au from 110.2m

BRC3 Stage 2

MBRDD639 1.5m @ 0.66g/t Au from 1.5m

1.5m @ 0.50g/t Au from 10.5m

22.5m @ 1.77g/t Au from 58.5m

includes 7.5m @ 3.58g/t Au from

64.5m

BRC3 Stage 2

(continue to next page)

8 | 26

(continued from previous page)

Table 3: Buffalo Reef/Felda Mine Expansion Drilling results. The reported intervals are downhole lengths and do not

represent true widths. True widths will be determined once geological modelling has been completed.

Hole ID Intercept Comments

MBRDD641 2.0m @ 0.51g/t Au from 0.0m

0.7m @ 0.53g/t Au from 4.3m

21.0m @ 1.99g/t Au from 42.0m

includes

4.5m @ 3.66g/t Au from 52.5m

1.5m @ 0.39g/t Au from 77.0m

BRC2/BRC3 Stage 2

MBRDD641 2.0m @ 0.51g/t Au from 0.0m

0.7m @ 0.53g/t Au from 4.3m

21.0m @ 1.99g/t Au from 42.0m

includes

4.5m @ 3.66g/t Au from 52.5m

1.5m @ 0.39g/t Au from 77.0m

BRC2/BRC3 Stage 2

MBRDD645 1.0m @ 1.21g/t Au from 22.5m

1.3m @ 0.24g/t Au from 30.2m

BRC2/BRC3 Stage 1

MBRDD646 4.5m @ 1.47g/t Au from 100.5m BRC2/BRC3 Stage 2

MBRDD635: 8.1m @ 1.27g/t Au from 6.9m

3.0m @ 7.53g/t Au from 79.5m

0.7m @ 0.48g/t Au from 85.5m

3.0m @ 2.95g/t Au from 88.5m

12.5m @ 1.52g/t Au from 94.5m

6.5m @ 2.39g/t Au from 113.5m

BRC3 Stage 2

MBRDD638 19.8m @ 1.90g/t Au from 100.7m

includes

2.5m @ 3.02g/t Au from 100.7m and

2.8m @ 2.31g/t Au from 105.4m and

4.3m @ 2.93g/t Au from 110.2m

BRC3 Stage 2

MBRDD639 1.5m @ 0.66g/t Au from 1.5m

1.5m @ 0.50g/t Au from 10.5m

22.5m @ 1.77g/t Au from 58.5m

includes

7.5m @ 3.58g/t Au from 64.5m

BRC3 Stage 2

STAGE 1. Buffalo Reef “Gap” Drilling

Stage 1 Buffalo Reef/Felda Expansion drilling program focuses on evaluation of the potential resource

increase to bridge the gaps between BRC2/BRC3 and between BRC3/BRC4 (Figure 1), to enable the

pits to be combined and expanded, which may inform future LOM planning subject to further studies.

Eleven (11) of the Twenty (23) holes reported in this announcement (Table 1) targeted BRC2 / BRC3

Gap and the BRC3 / BRC4 Gap.

BRC2/BRC3 “Gap”

Drilling around the BRC2/BRC3 Gap continues to demonstrate continuity between drill holes and the

existing resource domains. The successful intersecting of gold mineralization targeting the projection