Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MMA.V ·

Termination of Earn-IN Agreement

Mergers & Acquisitions Property Options & Staking

TERMINATION OF EARN-IN AGREEMENT

Vancouver, British Columbia, June 10, 2022 – Midnight Sun Mining Corp. (the “ Company” or “Midnight

Sun”) (TSX -V: MMA / OTCQB: MDNGF) has received notification of Rio Tinto Mining and Exploration

Limited’s (“Rio Tinto ”) intention to terminate the previously announced Earn -In and Joint Venture

Agreement (the “ Earn-In Agreement ”) (see the Company’s news release dated April 27, 2020) .

Termination will be effective June 28, 2022.

Under the terms of the Earn -In Agreement, Rio Tinto has not earned any ownership of the Solwezi

Licences, and control will be returned to Midnight Sun, along with all samples and data collected while

Rio Tinto acted as the project operator.

Al Fabbro, President & CEO commented, “While Rio Tinto were not satisfied with the results generated

by their work on our properties, I do not share their feelings. From the outset of this Agreement, Rio

Tinto made it clear to me they were looking for a ‘Rio sized deposit .’ Falling short of their parameters

does not mean we don’t have the makings of an economic orebody on our hands. They have generated

excellent databases of geochemical and geophysical information that tell me the Solwezi Licences are

very much still alive and warranting further work.”

2021 WORK PROGRAM

Midnight Sun has received the 2021 Solwezi exploration report from Rio Tinto. All of the work in this

field season was fo cused on license 12124 -HQ-LEL and t otal expenditures for the 2021 program were

approximately USD $2.95 million.

The work consisted of 5,968 meters (“m”) of drilling divided into: 2,483 m of diamond d rilling (“DD”)

over 8 holes, 1,050 m of Reverse Circulation drilling (“RC”) and 2,682 m of air core drilling (“AC”). There

were also 668 new soil samples taken and 1,200 AC samples from Mitu reanalyzed.

A total of five target areas were examined: Gameno, Likoko, Sanda, Mawemba and Dumbwa.

Gameno

There were three DD h oles at Gameno totalling 1 ,300 m. The program was designed to test a Cu -Bi

anomaly that was upgraded by two AC holes in 2020 that returned 18 m of 0.21% Cu and 14 m of 0.23%

Cu. The three best intercepts were 2.1 m of 0.68% Cu from 360 m, 1.5 m of 0.79% Cu from 188.5 m, and

1.42 m of 8.3% Cu from 164 m.

No further work is recommended due to lack of strike continuity and thickness. It is also the most

populous part of the licenses , running into the town of Solwezi, which hampers further exploration and

potential development.

Likoka

Two DD holes, totalling 461 m tested the Mitu extension to the southeast over a moderate copper soil

anomaly coincident with a strong Versatile Time Domain Electromagnetic (“ VTEM”) anomaly and an

audiomagnetotelluric (“ AMT”) conductor. Neither diamond drill hole intersected Cu mineralisation,

indicating further geological and structural modelling of the Mitu Trend is required to understand the

controls of mineralisation and the fluid focusing mechanism along this target area.

Sanda

Two DD holes totalling 499 m tested a weak soil geochemical anomaly and a large VTEM anomaly similar

to Mitu. Weak mineralisation was encountered in each hole.

Mawemba

One diamond drill hole was completed to test a Cu in soil anomaly on the north -west edge of a large

mafic intrusive body. This diamond drill hole intercepted 20 m of 0.19% Cu from 27.3 m.

At Mawemba NE, 18 air core holes were drilled across three fences, t esting a Cu in soil anomaly and

along a linear magnetic anomaly. The strongest result was 1 m of 1.13% Cu from 26 m, terminating in

mineralization.

Dumbwa

Rio Tinto performed a full review of the diamond drilling previously performed by Midnight Sun on the

area to get an understanding of the geology and mineralisation of the area. A 200 m x 200 m infill soil

geochemical grid confirmed the continuity of the anomaly and seven reverse circulation holes were

drilled.

NEXT STEPS

Midnight Sun engaged an independent Copperbelt expert, Dr. Simon Dorling , to review the data

generated by Rio Tinto’s work and prepare recommendations for Midnight Sun’s 2022 work program.

QUALITY ASSURANCE/QUALITY CONTROL

All samples collected by Rio Tinto including soil samples and all drilling were sent to ALS Global Ndola

facility for preparation and on turn ALS Vancouver for analysis. The prepared samples was provisionally

analysed by ALS certified pXRF at Ndola and in turn by ICP -AES/MS method in Vancouver. One duplicate

sample and one certified standard sample were inserted by Rio Tinto in every 20 samples analysed for

quality control/quality assurance purposes.

Qualified Person: Richard Mazur, P.Geo., a Director of the Company and a Qualified Person under NI 43-

101, has reviewed and approved the technical data and contents of this release.

ON BEHALF OF THE BOARD OF MIDNIGHT SUN MINING CORP.

Al Fabbro

President & CEO

For Further Information Contact:

Al Fabbro

President & CEO

Tel: +1 604 351 8850

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS

DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE

ADEQUACY OR ACCURACY OF THIS NEW RELEASE.

This news release includes certain statements that may be deemed "forward -looking statements." All

statements in this release, other than statements of historical facts, are forward -looking statements.

Although the Company believes the expectations expressed in such forward -looking statements are

based on reasonable assumptions, such statements are not guarantees of future performance and

actual results or developments may d iffer materially from those in the forward -looking statements.

Factors that could cause actual results to differ materially from those in forward -looking statements

include, changes in market conditions, unsuccessful exploration results, changes in commodi ty prices,

unanticipated changes in key management personnel and general economic conditions. Mining

exploration and development is an inherently risky business. Accordingly, the actual events may differ

materially from those projected in the forward -looking statements. This list is not exhaustive of the

factors that may affect any of the Company's forward -looking statements. These and other factors

should be considered carefully and readers should not place undue reliance on the Company's forward -

looking s tatements. The Company does not undertake to update any forward -looking statement that

may be made from time to time by the Company or on its behalf, except in accordance with applicable

securities laws.