Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MKR.V ·

Melkior Urban Soil Sampling Underway

Exploration Programs Sampling & Geoscience Results

Head Office: 66 Brousseau Ave., Suite 207, Timmins, ON P4N 5Y2 Canada

MELKIOR URBAN SOIL SAMPLING UNDERWAY

July 24, 2017 Trading Symbol: MKR

TSX Venture Exchange

Timmins, Ontario. Melkior Resources Inc. (“ Melkior ”) is pleased to announce that it is

presently onsite conducting a soil sampling program on the Maseres Project in the Urban-Barry

Greenstone Belt, Quebec.

The Maseres Project is located about 14 km southwes t of the Osisko Black Dog Deposit. The

Black Dog Project has been reported by Osisko to be a gold-silver-copper discovery in a volcanic

sequence coincident with magnetic and electromagnet ic anomalies and disseminated to semi-

massive Au-Ag-Cu bearing sulfides. The Black Dog appears to be on the same magnetic trend as

Bonterra’s Gladiator Project. Geophysical data sugg est that this magnetic trend is folded and

continues through Melkior’s Maseres Project. Minera lized boulders co-incident with this

formational conductor have been historically identified and reported to contain 11 ppm gold and

2% copper (NR April 13, 2017).

The soil sampling currently being conducted will cover the area of the formational trend recently

investigated (NR June 20, 2017) and consists of about 700 soil samples collected on a 50 m x 50

m grid spacing over an area of about 3,000 x 600 m centered over the axis of the formational

conductor. Soil samples will be obtained from the A -horizon and submitted for multi-elemental

analysis. This sample program will determine if A-horizon sampling is capable of discriminating

gold anomalies in the environment present on the Ma seres project. If successful, soil sampling

coverage will be extended over areas of the Maseres Project that were surveyed in the historical

1992 airborne survey. Additionally, if the A-horizo n soil sampling is capable of discriminating

gold anomalies, Melkior will be in a position to proceed with implementing a VTEM survey with

the confidence that the data, in conjunction with A-horizon soil sampling can be used together to

advance targets towards the drill stage. The near u biquitous presence of the A-horizon in

conjunction with its ease and rapidity of collectio n, could make it a useful and cost-effective

exploration tool.

The results of the chemical analysis from the rock samples obtained from bedrock and boulders

(NR June 20, 2017) did not return any significant g old values. While the analytical results were

disappointing, the observations from the reconnaiss ance program confirmed that the Maseres

Project is located in a favorable geology setting.

Melkior’s Carscallen Project, Timmins, Ontario, has been awarded an exploration permit. The

start of drilling is imminent and will be announced . The 2017 Exploration Plan is available on

the Melkior website ( http://www.melkior.com/wp-content/uploads/MKR-2017-Exploration-

Plan.pdf ).

2

Jim Deluce, CEO of Melkior commented, “Melkior is o f the opinion we are on the same

formational conductor that hosts Osisko’s Black Dog deposit. We are pleased to be in the enviable

position of having so many quality EM and conductive targets in such close proximity to Osisko.

Our team is now endeavoring to validate the best exploration tools for the Maseres project and to

determine priority areas for more advanced exploration.”

Wade Kornik, P.Geo., has approved the information contained in this release. Mr. Kornik is the

Exploration Manager of the Company and is Qualified Person as defined by National Instrument

43-101.

ON BEHALF OF THE BOARD

Keith James Deluce, CEO

For more information, please contact:

Melkior Resources Inc.

E-mail: [email protected]

Tel: 705-267-4000

The reader is invited to visit Melkior's web site www.melkior.com.

This news release may contain or refer to forward-l ooking information based on current expectations, i ncluding, but

not limited the prospect of the Company achieving s uccess in exploring the Maseres Project and the imp act on the

Company of these event, including the effect on the share prices. Forward-looking information is subject to significant

risks and uncertainties, as actual results may diff er materially from forecasted results. Forward-look ing information

is provided as of the date hereof and we assume no responsibility to update or revise such information to reflect new

events or circumstances.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.