Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MKR.V ·

Melkior Provides Report on Future Expectations

Corporate Updates

Head Office: 66 Brousseau Ave., Suite 207, Timmins, ON P4N 5Y2 Canada

Melkior Provides Report on Future Expectations

October 5, 2017 Trading Symbol: MKR

TSX Venture Exchange

Timmins, Ontario. Melkior Resources Inc. (“ Melkior ” or the “ Company ”) is pleased to provide a

summary of the Company’s achievements on its proper ties in 2017 and the goals the Company hopes to

accomplish over the next year.

Timmins

1. Soil samples submitted, evaluated and reported;

2. Assays results from drilling pending;

3. Next phase drilling;

4. Acquire additional strategic claims.

Timmins area projects include: Carscallen, Big Marsh, Bristol and Sewell.

Carscallen: The 2017 Exploration plan has been initiated. A significant majority of the core samples

submitted for analysis are outstanding. The drill program has been paused to await assays. Upon receipt

of analytical data and its evaluation, it is anticipated that the 2017 Exploration Plan will be re-engaged.

A significant number of soil samples from Carscalle n were taken in August 2017. These samples will be

submitted for trace element analysis and the subseq uent evaluation used to guide additional surface wo rk

this year. It is hoped that these results, in addition to follow-up ground work, will generate additional drill

targets.

Big Marsh: The Big Marsh Project requires a significant amount of assessment work to maintain the group

in good standing. Several options are currently being considered to keep the claim group in good standing.

While no definite exploration commitments have been made, there is no current plan to let these claims

lapse.

Bristol: Soil sampling program has been completed over a ch argeability anomaly on the Bristol claim

group. Samples will be analysed for trace elements and these results evaluated. Based on the analytica l

results, additional avenues of exploration will be assessed. Expenditures on this program will maintain the

claim group in good standing for several years when the assessment report is filed in late 2017.

Sewell: This is a recent addition to the Timmins project group. While Sewell is not on the forefront of our

exploration plans, its exploration potential is being assessed prior to budgetary commitment.

Urban Quebec (map link http://www.melkior.com/maseres-gold-project/assay-results/ )

1. Surface samples submitted, evaluated and reported;

2. Airborne of complete property;

3. Exploration permits followed by drilling.

In the summer of 2017, a test grid of soil sampling was undertaken and samples submitted for trace analysis.

The soil samples have recently been received and ar e being evaluated. It is anticipated that the succe ss of

this exploration method in this area will lead to undertaking a helicopter borne electromagnetic survey over

the entire claim group. The detailed geophysical in formation is anticipated to generate an additional

program of soil sampling, summer 2018. The goal is to generate high quality drill targets and to catap ult

this embryonic project to the drill stage.

White Lake Project - Hemlo Ontario

1. Surface sample submitted, evaluated and reported;

2. Airborne of complete property;

3. Exploration permits followed by drilling.

A field crew is completing the acquisition of a significant soil sampling program over a portion of the White

Lake project. These samples will be submitted for trace analysis. The work will be submitted for assessment

credits to maintain the claim group in good standin g. The area of the survey historically hosted sever al

anomalous gold in soil trends. Based on the evaluat ion of the analytical results a progressive explora tion

program will be planned and implemented.

Other

Sell or joint venture all other non-core properties: Melkior is within a period of re-focus, re-branding

and rejuvenation. A conscious focus is being maintained on three areas: Timmins, Urban-Barry and Hemlo.

All other assets at the current time are being considered for sale or joint venture.

New Website: A fresh online rebrand is in the works with the dev elopment of a new website with the

addition to a more comprehensive social media strategy. The new website will reflect the new direction that

management has recently taken with new content and design. The website will be modernized to be more

user-friendly on mobile devices with addition to the desktop.

New Corporate Presentation: After the new website launch, we will be providing investors with a new

corporate presentation that reflects our new rebranding strategy and outlook that solidifies the direction

the Company is planning.

ON BEHALF OF THE BOARD

Keith James Deluce, CEO

For more information, please contact:

Melkior Resources Inc.

E-mail: [email protected]

Tel: 705-267-4000

The reader is invited to visit Melkior's web site www.melkior.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release contains "forward-looking inform ation" that is based on Melkior’s current expectati ons, estimates, forecasts

and projections. This forward-looking information includes, among other things, statements with respect to Melkior’s exploration

and development plans. The words "will", "anticipat ed", "plans" or other similar words and phrases are intended to identify

forward-looking information. Forward-looking information is subject to known and unknown risks, uncertainties and other factors

that may cause Melkior’s actual results, level of a ctivity, performance or achievements to be material ly different from those

expressed or implied by such forward-looking inform ation. Such factors include, but are not limited to : uncertainties related

exploration and development; the ability to raise s ufficient capital to fund exploration and developme nt; changes in economic

conditions or financial markets; increases in input costs; litigation, legislative, environmental and other judicial, regulatory,

political and competitive developments; technologic al or operational difficulties or inability to obta in permits encountered in

connection with exploration activities; and labour relations matters. This list is not exhaustive of t he factors that may affect our

forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance

on such forward-looking information. Melkior discla ims any intention or obligation to update or revise forward-looking

information, whether as a result of new information, future events or otherwise.