Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MKA.V ·

Mkango Announces Results of Definitive Feasibility Study FOR the Songwe Hill Rare Earths Project IN Malawi - NPV of USS559.0 Million and IRR of 31.5%

Economic Studies

MKANGO RESOURCES LTD.

550 Burrard Street

Suite 2900

Vancouver

BC V6C 0A3

Canada

MKANGO ANNOUNCES RESULTS OF DEFINITIVE FEASIBILITY STUDY FOR THE SONGWE HILL RARE EARTHS

PROJECT IN MALAWI - NPV OF USS559.0 MILLION AND IRR OF 31.5%

London, U.K. and Vancouver, CANADA — 5 July, 2022 — Mkango Resources Ltd. (AIM/TSX-V: MKA) (the

“Company” or “Mkango”) is pleased to announce the results of the definitive feasibility study (“DFS”) for the

Songwe Hill Rare Earths Project (“Songwe” or the “Project”) in Malawi.

Highlights

USS559.0 million post-tax net present value (“NPV”), using a 10% nominal discount rate, with an

internal rate of return (“IRR”) of 31.5%, payback period of 2.5 years from full production (5 years from

start of capital expenditure) and post-tax life-of-operations nominal cash flow of $2.1 billion.

DFS is for 100% of Songwe on a stand-alone basis. Under the Mines and Minerals Act of Malawi, the

Government of Malawi is entitled to a 10% free carried interest in Songwe.

Songwe is now confirmed as one of the very few rare earths projects globally to have reached the DFS

stage, with a full Environmental, Social, Health Impact Assessment (“ESHIA”) completed in compliance

with IFC Performance Standards and The Global Industry Standard for Tailings Management

(2020) (“GISTM”) adopted for design and management of the tailings storage facility.

Long operating life of 18 years, with mining assumed to commence in February 2025, production

ramping up from July 2025 and averaging 5,954 tonnes per year total rare earth oxides (“TREO”) for

the first five years of full production (September 2025 — August 2030), including 1,953 tonnes per year

of neodymium and praseodymium oxides, and 56 tonnes per year of dysprosium and terbium oxides,

in a mixed rare earth carbonate (“MREC”) grading 55% TREO, generating nominal EBITDA of US$215

million per year.

Neodymium, praseodymium, dysprosium and terbium are critical for the green transition, used in

permanent magnets for electric vehicles, wind turbines and many electronic devices.

Initial capital expenditure (“capex”) of US$277 million (excluding a US$S34 million contingency) for

development of mine, mill, flotation and hydrometallurgy plants, tailings storage facility, and related

project infrastructure in Malawi.

The NPV excludes any value attributable to the proposed Pulawy Rare Earth Separation Project

(“Pulawy”) in Poland, which is expected to process MREC from Songwe, enabling Mkango to capture

additional value via growing its integrated downstream business with a captive source of primary raw

material feed from Songwe. The NPV also excludes any value attributable to Mkango’s interests in rare

earth magnet recycling.

e The results of the DFS for an integrated project, comprising both Songwe and Pulawy, are expected to

be announced when both the Mine Development Agreement (“MDA”) with the Malawi Government

is completed for Songwe and the feasibility study is completed for Pulawy.

e Inparallel, a major focus for the Company will be further optimisation of the Project with the objective

of lowering capex and operating costs (“opex”), both of which have been negatively impacted by

current market dislocations, creating the potential to reduce costs as markets stabilise.

The Company will host an investor conference call at 3pm UK time / 10am Eastern Time on Friday 8°" July 2022.

Please join the call at least 5 minutes before the booked start time to allow the operator to transfer you into the call

by the scheduled start time: Canada toll free: 1 866 378 3566; UK toll free: 0808 109 0700; USA toll free: 1 866

966 5335; Password: Mkango DFS Results.

The DFS indicates a US$559.0 million post-tax NPV, using a 10% nominal discount rate, and 31.5% post-tax IRR

for 100% of Songwe. The DFS is based on Songwe as a stand-alone project selling MREC as opposed to separated

rare earth oxides and excludes Pulawy, which has potential to add significant downstream value. The financial

analysis doesn’t reflect any changes to the fiscal regime that may be contained in the MDA that is currently being

negotiated with the Government of Malawi. The Company plans to announce the results of the feasibility study

for an integrated project comprising both Songwe and Pulawy (the “Integrated DFS”) when both the MDA is

completed for Songwe and the feasibility study is completed for Pulawy.

With the release of the Songwe DFS and in anticipation of releasing the Integrated DFS, Mkango continues to

advance ongoing discussions with potential strategic investors, development and commercial banks, and off-

takers, working closely with its brokers, its project finance advisors, Terrafranca Capital Partners Ltd

(www.terrafranca.co.uk), its United States strategic advisors, Jones Group International

(www.jonesgroupinternational.com) and EIT RawMaterials (www.eitrawmaterials.eu) within the framework of

the European Raw Materials Alliance.

During the week of 27" June 2022, the Company hosted site visits to Songwe for a number of major commercial

and development banks.

Derek Linfield, Chairman of Mkango, stated: “This is a major milestone which few rare earth companies have

been able to reach. It reflects the perseverance and outstanding work completed by our executive and

management team since Project inception in 2010, as well as by our excellent team of international consultants,

advisors and academic partners, in addition to the longstanding support of our local stakeholders and the

Government of Malawi. We look forward to developing this exciting Project for the benefit of Malawi and our

shareholders.”

William Dawes, Chief Executive of Mkango, stated: “Songwe is the cornerstone of Mkango’s Mine, Refine,

Recycle strategy, underpinning development of the proposed Pulawy separation plant in Poland and

complementing our interests in rare earth magnet recycling in the UK and Germany via HyProMag. The DFS is a

major step forward for the Company, uniquely positioning Mkango as a future supplier of both mined and recycled

rare earths for the green transition, against a backdrop of a very strong demand and pricing outlook.”

Alexander Lemon, President of Mkango, stated: “Mkango is pleased to announce this major milestone for the

Company, and looks forward to finalising the Mining Development Agreement with the Government of Malawi.

This Project is transformational for Malawi, and Mkango welcomes the very strong support it is receiving from all

stakeholders. Songwe will catalyse a new industrial revolution in Malawi, creating employment opportunities and

producing high value-added exports, as well as further unlocking Malawi’s mineral potential and new

infrastructure developments.”

Summary of Selected Financial Inputs and Corresponding Results — Post-Tax Valuation

Item Unit Value

Life of operations post-tax nominal cash flow USS million 2,083.3

Payback period from project start? Years 5.0

Payback period from start of full production? Years 2.5

Post-tax NPV at 10% (nominal) discount rate USS million 559.0

Post-tax IRR (nominal) % 31.5

1 Assumes project start ie start capital expenditure March 2023 and start of full production September 2025

Project Overview

Mkango appointed SENET, a DRA Global company, as the principal consultant to complete the DFS. SENET is a

leading engineering, procurement and construction management (EPCM) minerals processing and project

delivery firm located in Africa. Other primary consultants for the DFS included the following:

e Geology, Mineral Resource, and Geotechnical Investigation: The MSA Group (Pty) Ltd (“MSA”)

e Mining: Bara Consulting (Pty) Ltd (“Bara”)

e Comminution: Grinding Solutions Limited (“Grinding Solutions”), Keramos

e Process Plant including On-Site and Off-Site Infrastructure: SENET, a DRA Global Company (“SENET”)

e Hydrometallurgy: Australian Nuclear Science and Technology Organisation (“ANSTO”)

e Flotation: KYSPY Investments (Pty) Ltd ("KYSPYmet”), ALS Metallurgy (Pty) Ltd (“ALS Metallurgy”)

e = Tailings Storage Facility (TSF): Epoch Resources (Pty) Ltd (“Epoch”)

e Environmental, Social and Health Impact Assessment (ESHIA): Digby Wells and Associates (Pty) Ltd

(“Digby Wells Environmental”), Kongiwe Environmental (Pty) Ltd

e Geochemistry: SGS Australia (Pty) Ltd

e Geotechnical testwork: Western Geotechnical and Laboratory Services

e Logistics: C. Steinweg Bridge (Pty) Ltd

The DFS is based on a conventional open pit contract mining operation, feeding mills, flotation and

hydrometallurgy plants on site in Malawi to produce a MREC, with an operating life (mining and processing) of

18 years with mining expected to commence in February 2025, processing expected to ramp up from July 2025

and full production expected from September 2025. The Company believes there is potential to increase the

mine life given the additional Inferred Resource, the potential to expand the Mineral Resource, and the

exploration potential from the nearby Nkalonje project. The DFS supports the declaration of a Proven and

Probable Mineral Reserve Estimate of 18.1 million tonnes grading 1.16% TREO.

Energy supply for the Project comprises a 24 MW solar facility supplemented with grid power, which in Malawi

is largely from hydroelectric sources. The Company is also evaluating wind power to further enhance and

diversify the renewable power mix.

Songwe features broad zones of outcropping rare earth mineralisation on the northern slopes of a steep sided

hill. The annual processing capacity is assumed to be approximately 1.0 million tonnes per year of ore with a

view to producing an average of 5,954 tonnes of TREO in MREC per year for the first five years and 4,081 tonnes

of TREO in MREC per year in years 6 to 18. The MREC will be cerium depleted. Because cerium is currently

considered to have challenging market fundamentals, there is a strong economic rationale to remove as much

cerium as possible and, as a result, a large proportion of the cerium will be removed from the MREC during the

hydrometallurgical process. Confirmation of the flotation and hydrometallurgical processing flow sheets was

underpinned by seven piloting campaigns at ALS Metallurgy and ANSTO.

The final stage of hydrometallurgical piloting at ANSTO produced MREC grading 55% TREO equivalent, enriched

in neodymium and praseodymium (“Nd/Pr”) oxides, which together made up 31% of the rare earth oxide content

in the carbonate product (i.e. Nd/Pr oxides / TREO = 31%).

The MREC produced from Songwe is expected to be a high value product (averaging USS32,816 per tonne (real

2022 US dollars)) for the first full five years of production based on pricing estimates from Adamas Intelligence

and will be exported via largely existing infrastructure. The Project is connected by road to Blantyre, the largest

commercial centre in Malawi, located approximately 70 km away, which has a rail head and international airport.

There have been significant improvements to local infrastructure in recent months. The Malawi Roads Authority

has upgraded an existing government road from nearby Migowi to the Songwe Hill project site. To date, 12 km

of an existing 15 km government dirt track has been upgraded and widened to an all-weather gravelled road

with new reinforced concrete culverts, embankments and bridges installed.

The MREC is expected to be shipped to the proposed Pulawy project in Poland for separation. The DFS is based

on selling the MREC rather than separated products. As a result, a 27% discount was applied to the forecasted

value of rare earths contained in the MREC (discount equivalent to approximately USS22.07 per kilogram (real

2022 US dollars) of TREO in MREC for first full five years of production to reflect the discount that would be

applied for MREC product versus the value of the underlying separated rare earth oxides (“REO”). A significant

proportion of this discount is expected to be captured in the Pulawy separation plant. It is envisaged that the

Pulawy plant will sell separated neodymium, praseodymium and / or didymium (NdPr) oxides as well as a heavy

rare earth enriched carbonate and a lanthanum cerium carbonate, thereby capturing more of the value of the

underlying REOs. Subject to the results of the Pulawy feasibility study, Mkango is targeting a separation cost of

less than USS3 per kilogram of TREO in MREC (based on the rare earth distribution below) to produce this

product suite at Pulawy, with a capex for the separation plant targeted at approximately USS120 million.

A summary of the key outputs of the DFS is presented in the tables below:

Summary of Mining and Processing Inputs and Results — Average over First Full Five Years?

Item Unit Value

Mining

Average yearly ore mined kt 2,186

Average TREO grade mined % 1.19

Average yearly waste mined kt 3,667

Average strip ratio (waste:ore) 1.68

Processing

Average yearly flotation plant feed kt 1,000.8

Average plant feed TREO grade % 1.50

Flotation TREO concentrate grade % 15.05

Average TREO recovery to concentrate % 74.10

Average yearly flotation concentrate feed to kt 74.06

hydrometallurgical plant

Average NdPr oxide hydrometallurgical recovery to % 85.3

carbonate

Average Ce oxide hydrometallurgical recovery to carbonate % 20.9

Average yearly TREOs in carbonate product t 5,954

Average carbonate TREO grade % 55

Average yearly carbonate production (dry basis) t 10,826

1First 5 years refers to the 60 months from start of processing in September 2025. Mining excludes first 5 months of mined and stockpiled ore prior to

start of processing (819,437 tonnes at 1.00% TREO)

Summary of Mining and Processing Inputs and Results — Life of Operations (averages)

Item Unit Value

Life of operations (mining and processing) Years 18

Mining (February 2025 — April 2037)

Average yearly ore mined kt 1,481

Average TREO grade mined % 1.16

Average yearly waste mined kt 3,311

Average strip ratio (waste:ore) 2.2

Processing (September 2025 — August 2043)?

Average yearly flotation plant feed kt 1,000.8

Average plant feed TREO grade % 1.16

Flotation TREO concentrate grade % 11.64

Average TREO recovery to concentrate % 74.10

Average yearly flotation concentrate feed to kt 74.06

hydrometallurgical plant

Average NdPr oxide hydrometallurgical recovery to % 85.3

carbonate

Average Ce oxide hydrometallurgical recovery to carbonate % 20.9

Average yearly TREOs in carbonate product t 4,634

Average carbonate TREO grade % 55.00

Average yearly carbonate production (dry basis) t 8,425

+ Excludes final month of partial operations

Summary of Mining and Processing Inputs and Results — Life of Operations (totals)

Item Unit Value

Mining

Total ore mined kt 18,147.8

Total waste mined kt 40,553.9

Strip ratio (waste: ore) 2.2

Processing

Total flotation concentrate feed to hydrometallurgical plant kt 1,341.4

Total contained TREO in carbonate product kt 83.4

Total carbonate production (dry basis) t 151,644

Market and Financial Analysis

A detailed financial model was constructed based on input parameters set out in the DFS. Free cash flows were

modelled in both real and nominal terms for a range of discount rates and on a debt free basis.

MREC price forecasts and underlying REO price forecasts were based on the following market analysis by Adamas

Intelligence from their report dated April 2022 entitled Rare Earth Magnet Market Outlook to 2035:

e From 2022 through 2035:

o Global demand for NdFeB magnets is expected to increase at a compound annual growth rate

(“CAGR”) of 8.6%, bolstered by double-digit growth from the electric vehicle and wind power