Military Metals Reports Maiden Inferred Resource Estimate

Containing 67,000 Tonnes of Antimony and 222,000 Ounces of Gold

at Flagship Trojárová Project, Europe

VANCOUVER, BC, April 8, 2026 - Military Metals Corp. (the “Company” or “MILI”)

(CSE: MILI, OTC: MILIF, FSE: QN90) is pleased to announce the completion of a maiden

Inferred Mineral Resource estimate (MRE) of 6.5 Mt at 1.02% Sb and 1.06 g/t Au for 67 thousand

tonnes (kt) of antimony and 222 thousand ounces (koz) of gold at the Company’s wholly owned

flagship Trojárová Project (the “Project”) in Western Slovakia.

Highlights:

• Inferred Mineral Resource of 6.5 Mt at 1.02% Sb and 1.06 g/t Au for 67 kt of

antimony and 222 koz of gold (Table 1)

• Resource estimate incorporated 53 diamond drill holes totaling 7,167 m of drilling

and 55 intervals of underground chip samples totaling 202 m

• Historical MRE is now replaced by a modern MRE that is prepared in accordance

with the 2014 Canadian Institute of Mining, Metallurgy and Petroleum ("CIM")

Definition Standards (CIM, 2014) and the CIM Best Practice Guidelines of Mineral

Resources and Reserves (2019)

Scott Eldridge, Chief Executive Officer of the Company, commented, “The maiden mineral

resource estimate of the Trojárová Project firmly underpins the value of Military Metals.

Following our 2025 confirmation drilling campaign Trojárová has emerged as the largest antimony

resource in the European union that is defined by a modern regulatory standard 1, and among the

largest antimony resources globally. At a time when the need for secure, domestically sourced

critical minerals is more pressing than ever, these results strengthen the project’s potential

importance to, and alignment with, the EU’s objective of building a dependable, home -grown

supply of critical raw materials.”

1The Company defines “ a modern regulatory standard” as NI 43-101, JORC, or S -K 1300

disclosure standards.

Table 1 - Trojárová Mineral Resource Estimate – April 6, 2026

Classification Tonnage Average Grade Contained Metal

(Mt) Sb (%) Au (g/t) Sb (kt) Au (koz)

Inferred 6.5 1.02 1.06 67 222

Notes:

1. The Mineral Resource Estimate was completed by SLR Consulting (Canada) Ltd. ("SLR") in accordance

with the 2014 Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards and

the CIM Best Practice Guidelines of Mineral Resources and Reserves (2019)

2. SLR is independent of Military Metals Corp.

3. The Mineral Resource is reported on a 100% ownership basis.

4. Mineral Resources are estimated at a cut-off grade of 0.8% SbEq.

5. The formula for SbEq is SbEq = Sb % + (Au g/t * 0.562).

6. Mineral Resources are estimated using a long-term antimony price of US$29,000 per tonne and a gold price

of US$3,000 per ounce.

7. A uniform bulk density of 2.82 t/m3 was applied based on the length-weighted mean from laboratory

density determinations from the Project’s main mineralized zone.

8. Metallurgical recovery is 85% for antimony and 85% for gold.

9. The Mineral Resource excludes a 50 m crown pillar.

10. Resource estimation domains were modelled to a 2.0 m minimum width.

11. Totals may vary due to rounding.

The 2026 Trojárová Mineral Resource Estimate

The maiden Mineral Resource Estimate (“MRE”) incorporates all historical and modern drilling

completed on the project, as well as historical underground sampling, comprising 53 diamond

drill holes totaling 7,167 m and 55 underground face chip sampling intervals totaling 202 m.

Three historical drill holes without analytical results available were excluded. Six mineralization

wireframes, each supported by a minimum of two drill holes, were manually built based on

a 0.1% SbEq threshold. A minimum wireframe width of 2.0 m was applied to all zones. Mineral

Resources above the 0.8% SbEq cut-off were reported in four of the six mineralization

wireframes (Figure 1).

Inferred Mineral Resources correspond to areas supported by at least two drill holes with

nominal drill spacing of no more than 150 m. Classification boundaries were locally refined

manually to reflect geological interpretation, grade continuity, and zone thickness.

The MRE is constrained within estimation domains meeting a 2.0 m minimum mining

width. A 50 m crown pillar was also excluded from the MRE.

Resource classification follows the CIM (2014) Definition Standards. Modeling and estimation

were completed in Leapfrog Geo and Leapfrog Edge, and validation included database checks,

wireframe-to-block volume comparisons, statistical reviews, and visual inspections on sections,

plans, and longitudinal sections. Reporting assumes an antimony price of US $29,000 per tonne

and a gold price of US$3,000/oz, with an effective date of April 6th, 2026.

The average grade, minimum mining width and other results or assumptions above do not

guarantee future production.

Figure 1: Trojárová deposit showing Inferred Mineral Resources above cut off (grey), and mineralization wireframes (red)

Exploration Growth Potential

To date no significant mineralization has been intersected beyond the boundaries of the current

Inferred Mineral Resource estimate. However, mineral exploration beyond these boundaries has

also been limited. There is geological evidence of the mineralizing structure or other sympathetic

structures continuing northward along strike within the boundaries of the Trojárová project.

Additional exploration along this corridor could identify targets for future drilling. Furthermore,

the Inferred Mineral Resource is open to depth, where additional drilling has the potential to

incorporate additional volume into future mineral resource estimates.

About the Trojárová Project

Discovered in the late 1970s, Trojárová was the focus of extensive surface and underground

exploration over a 2 km strike length from 1983 to 1995, including 66 diamond drill holes for a

total of 9,049 m and 1.7 km of underground workings . Efforts continued over the years as

additional trenches were dug, and holes were drilled. Starting in 1990, underground development

began, ultimately comprising a 300- metre-long adit connected to a 700- plus-metre-long drive in

the footwall of the mineralized zone, with seven crosscuts into the mineralized zone for sampling.

These efforts culminated in a comprehensive study comprising drill logs, analyses, drill plans,

maps and sections, deposit model studies, petrographic studies, metallurgical studies and more,

now detailed in a multi -volume compendium of reports produced by the Slovak Geological

Institute published in 1992.

The historical work carried out appears comprehensive, detailed and at a professional standard.

The Company considers this historical data relevant, as it will use it as a guide to plan future

exploration programs and informs the I nferred Mineral Resource estimate. The Company also

considers the data to be reliable for these purposes.

The Company completed a confirmation drilling campaign in the winter of 2025 to validate

historical work. Seven diamond drill holes totaling 1,383 m were drilled (Figure 2).

Figure 2: Map of Military Metals' Trojárová Project, Western Slovakia.

Qualified Person

The Mineral Resource estimate was prepared by Luke Evans, M.Sc., P.Eng., Principal Resource

Geologist, Global Technical Director, Geology Group Leader for SLR Consulting (Canada) Ltd.

It is reported in accordance with the CIM Definition Standards (2014). The scientific and technical

information in this news release related to the Trojárová Mineral Resource estimate has been

reviewed and approved by Mr. Ev ans, who is independent of Military Metals Corp. and a

“Qualified Person” under National Instrument 43-101.

SLR is unaware of any environmental, permitting, legal, title, taxation, socio-political, marketing,

or other relevant issues that could materially affect the Mineral Resource estimate.

David Murray, P.Geo., Vice President of Exploration at Military Metals Corp. a “Qualified

Person” under National Instrument 43-101, has reviewed and approved the scientific and technical

information in this press release.

A technical report will be prepared by Qualified Persons in accordance with the requirements of

NI 43-101 and will be filed on SEDAR+ within 45 days of this press release.

About Military Metals Corp.

The Company is a British Columbia-based mineral exploration company that is primarily engaged

in the acquisition, exploration and development of mineral properties with a focus on antimony.

For more information about Military Metals Corp. and its critical minerals initiatives, please visit:

https://www.militarymetalscorp.com.

LinkedIn: https://www.linkedin.com/company/military-metals/

X: https://x.com/militarymetals

Facebook: https://www.facebook.com/profile.php?id=61564717587797

ON BEHALF OF THE BOARD OF DIRECTORS

For more information, please contact:

Scott Eldridge

CEO and Director

[email protected] or [email protected]

For inquiries, please call 604-537-7556

Cautionary Statement regarding Forward Looking Statements

This news release contains "forward-looking information". Often, but not always, forward-looking

statements can be identified by the use of words such as "plans", "expects", "is expected",

"budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations

(including negative variations) of such words and phrases, or state that certain actions, events or

results "may", "could", "would", "might" or "will" be taken, occur or be achieved, the continuation

of the value of antimony, and the future needs of Europe and the E.U. specifically. A variety of

factors, including known and unknown risks, many of which are beyond our control, could cause

actual results to differ materially from the forward-looking information in this news release. These

include geopolitical developments related to the supply and value of antimony, the continued use

of antimony and availability of alternatives, availability of capital and labour in respect of the

property that is the subject of this news release, the results of any future exploration activities,

which cannot be guaranteed, and any other future activities in respect of the property held by the

Target. Additional risk factors can also be found in the Company's public filings under the

Company's SEDAR+ profile at www.sedarplus.ca. Forward-looking statements contained herein

are made as of the date of this news release and the Company disclaims any obligation to update

any forward-looking statements, whether as a result of new information, future events or results or

otherwise. There can be no assurance that forward-looking statements will prove to be accurate,

as actual results and future events could differ materially from those anticipated in such statements.

The Company undertakes no obligation to update forward looking statements if circumstances,

management's estimates or opinions should change, except as required by securities legislation.

Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.

The Canadian Securities Exchange has neither approved nor disapproved the information

contained herein and does not accept responsibility for the adequacy or accuracy of this news

release.