Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MGM.V ·

Maple Gold Reports Additional Drill Results from the Porphyry Zone

Drill Results

Maple Gold Reports Additional Drill Results from the

Porphyry Zone

Montreal, Quebec--(Newsfile Corp. - June 27, 2019) -

Maple Gold Mines Ltd.

(

TSXV: MGM) (OTCQB: MGMLF) (FSE: M3G

)

("

Maple

Gold

" or the "

Company

") is pleased to report additional results within the Porphyry Zone from its 6,045 metre winter 2019

drilling campaign. The Company drilled a total of eight (8) holes (3,120m) within the Porphyry Zone, with all eight holes

intersecting gold mineralisation. Targets in the Porphyry Zone were selected with the aim of extending known zones with higher

than deposit-average grades, both near-surface and at moderate depths. New assay results are highlighted below, using a 0.25

g/t Au cut-off grade (see Table 1):

DO-19-264

cut

27m averaging 1.03 g/t Au,

including

14m averaging 1.56 g/t Au,

both

from 488m downhole

(approximately 300m vertical)

.

This new intercept is found within a significantly broader (60m) halo

of variable and lower

grade Au mineralisation.

DO-19-263

cut

8.7m averaging 1.14 g/t Au

from 273m downhole (approximately 200m vertical), including

6m of 1.45 g/t

Au,

which tested the up-dip extension of an area drilled during 2018.

DO-19-265

cut

13m averaging 1.04 g/t Au

from 66m downhole or about 40m vertically

(from top of

bedrock),

including

9m averaging 1.36 g/t Au

, confirming the presence of near-surface higher than deposit-average grades in this area.

DO-19-267

cut

multiple intercepts,

including

7m averaging 1.49 g/t Au

from 145m downhole (approximately 130m

vertical), confirming up-dip continuity of a 2018 drill intercept

DO-19-268

cut multiple intercepts over 1 g/t Au, including

1m averaging 9.89 g/t Au

from 269m downhole (approximately

215m vertical),

within a 5.5m interval with variable grade averaging 2.33 g/t

Au

.

This hole ended in mineralisation

.

The new highlighted intercepts reported above build upon the previously announced 2019 results from the Porphyry Zone, which

included DO-19-258 with 19m averaging 2.46 g/t Au (DO-19-258) within a broader interval of 41m averaging 1.41 g/t Au and

DO-19-256 with multiple near-surface intercepts including 16m averaging 1.57 g/t Au (see press release May 29, 2019).

Maple Gold's VP, Exploration, Fred Speidel, commented:

"We are pleased with the results to-date from our focused 6,045

metre drill campaign, as we have consistently intersected and extended gold zones within the resource area. These new

Porphyry Zone results will continue to help guide our down-dip / down-plunge targeting of higher grade mineralisation going

forward."

Figure 1 (below) illustrates the spatial distribution of the 2019 drill-holes within the Porphyry Zone, with corresponding assay

results presented in table 1 below.

Fig. 1: Drill plan with 2019 Porphyry and 531 Zone drill-holes on residual total field magnetic background image.

To view an enhanced version of Fig. 1, please visit:

https://orders.newsfilecorp.com/files/3077/45942_2ca199ee24df599c_001full.jpg

Fig. 2: Section 706650E with ±50m corridor; mineralised zone uses 0.1 g/t cut-off. DO-18-216 is off section.

To view an enhanced version of Fig. 2, please visit:

https://orders.newsfilecorp.com/files/3077/45942_2ca199ee24df599c_002full.jpg

Hole DO-19-264 was originally designed to test the depth continuity of a very strong 2018 intercept in DO-18-216 (52m

averaging 3.53 g/t Au, or 1.46 g/t Au capped at 13 g/t). However, the 2019 hole deviated more than expected, with the above-

mentioned holes ending approximately 150m apart in an EW direction down-hole. Therefore, the depth continuity was not

adequately tested as planned. However, results from DO-19-264 still support the down-dip continuity of the broader

mineralisation envelope and the presence of higher grade mineralisation within it. The Company will continue testing the down-

plunge continuity of these higher grade zones or shoots in a subsequent drilling campaign.

Table 1: Highlighted 2019 Drill Intercepts from the Porphyry Zone and Exploration Area (10 holes in total)

To view an enhanced version of this Table 1, please visit:

https://orders.newsfilecorp.com/files/3077/45942_2ca199ee24df599c_003full.jpg

*Denotes new assays results (DO-19-256, DO-19-258 and DO-19-260 were first reported on May 29, 2019). All intervals are

downhole lengths, with true estimated width varying from approximately 70-90% depending on the hole and mineralised zone

orientation. Capping in the Porphyry Zone is done at 13 g/t Au per Micon (2018). Cut-off used for broader intercepts is 0.25 g/t

Au. **Denotes two greenfield exploration drill-holes (see text below).

The Company also drilled two greenfield exploration holes (DO-19-259 and -261) more than 1km south of the Porphryry Zone.

These two drill holes were targeting potential new gold zones in an area that had previously yielded multiple narrow intercepts

from 1-17 g/t Au.

A single zone gave 1.05 g/t Au over 1.8m in one of the holes, with anomalous Zn also indicative of base metal

potential in this general area.

Additional figures and core images corresponding to the drill-holes reported in this press release will be posted to the

Company's website shortly.

Qualified Person

The scientific and technical data contained in this press release was reviewed and prepared under the supervision of Fred

Speidel, M. Sc, P. Geo., Vice-President Exploration, of Maple Gold. Mr. Speidel is a Qualified Person under National Instrument

43-101 Standards of Disclosure for Mineral Projects. Mr. Speidel has verified the data related to the exploration information

disclosed in this news release through his direct participation in the work.

Quality Assurance (QA) and Quality Control (QC)

Maple Gold implements strict Quality Assurance ("QA") and Quality Control ("QC") protocols at Douay covering the planning and

placing of drill holes in the field; drilling and retrieving the NQ-sized drill core; drill-hole surveying; core transport to the Douay

Camp; core logging by qualified personnel; sampling and bagging of core for analysis; transport of core from site to ALS

laboratory; sample preparation for assaying; and analysis, recording and final statistical vetting of results. For a complete

description of protocols, please visit the Company's QA/QC page on the website at:

http://maplegoldmines.com/index.php/en/projects/qa-qc-qp-statement

About Maple Gold

Maple Gold is an advanced gold exploration and development company focused on defining a district-scale gold project in one

of the world's premier mining jurisdictions. The Company's ~355 km² Douay Gold Project is located along the Casa Berardi

Deformation Zone (55 km of strike) within the prolific Abitibi Greenstone Belt in northern Quebec, Canada. The Project benefits

from excellent infrastructure and has an established gold resource

3

that remains open in multiple directions. For more

information please visit

www.maplegoldmines.com

.

ON BEHALF OF MAPLE GOLD MINES LTD.

"Matthew Hornor"

B. Matthew Hornor, President & CEO

For Further Information Please Contact:

Mr. Joness Lang

VP, Corporate Development

Cell: 778.686.6836

Email:

[email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS

DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY

OR ACCURACY OF THIS PRESS RELEASE.

Forward Looking Statements:

This news release contains "forward-looking information" and "forward-looking statements" (collectively referred to as "forward-

looking statements") within the meaning of applicable Canadian securities legislation in Canada, including statements about the

prospective

mineral potential of the Porphyry Zone, the potential for significant mineralisation from other drilling in the referenced

drill program and the completion of the drill program. Forward-looking statements are based on assumptions, uncertainties and

management's best estimate of future events. Actual events or results could differ materially from the Company's expectations

and projections. Investors are cautioned that forward-looking statements involve risks and uncertainties. Accordingly, readers

should not place undue reliance on forward-looking statements. For a more detailed discussion of such risks and other factors

that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to

Maple Gold Mines Ltd.'s filings with Canadian securities regulators available on

www.sedar.com

or the Company's website at

www.maplegoldmines.com

.

The Company does not intend, and expressly disclaims any intention or obligation to, update or

revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by

law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/45942