Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MGM.V ·

Maple Gold defines new Nika Gold Zone with initial drill results from gap area between Porphyry, Douay West and NW zones

Drill Results

PRESS RELEASE

April 23, 2018

Maple Gold defines new Nika Gold Zone with initial drill results from gap

area between Porphyry, Douay West and NW zones

April 23, 2018 – Montreal (Quebec): Maple Gold Mines Ltd. (“Maple Gold” or the “ Company”) (TSX-V:

MGM, OTCQB: MGMLF; Frankfurt: M3G) is pleased to provide an update on the ongoing winter drilling

campaign. The program has ramped up with eight (8) diamond core drill rigs now actively testing all target

areas (Resource Area, NE Syenite and NW Syen ite targets). One of the company’s high-priority targets

is the area between the Porphyry, Douay West and NW zones, now referred to as the “Nika Zone”, which

has a lower drill -hole density and strong potential for new d iscoveries and extension s of existing

resource zones. The Company has received results from 4 drill-holes in this area, with highlights below:

 DO-18-217: 104m of 0.44 g/t Au from 284m, including 17m of 1.08 g/t Au from 309m (additional

assays pending);

 DO-18-218: 13.2m of 0.86 g/t Au from 409.8m, collared 133m SE of DO-18-217 (additional assays

pending)

Furthermore, historic hole DO-12-105 (2012) was collared 265m WSW of DO -18-218 and bottomed in

mineralization at 467.6m (estimated vertical depth of 320m), returning 21.1 g/t Au and remaining open.

The DO-18-217, DO-18-218 and DO-12-105 intercepts may form part of the same two mineralized zones

(see Figure 1 below).

Maple Gold’s VP, Exploration, Fred Speidel, stated: “One of our objectives with the current drilling

campaign is to take steps toward connecting the existing resource zones and extending known

mineralization beyond the current limits of the block model that was used in the 2018 Micon estimate.

The initial results in this “Gap” area are indicative of the discovery of a new gold zone there, and one we

believe has strong potential to make a positive impact on future resource estimations at Douay. We look

forward to results from the additional 5 drill-holes with assays still pending from this priority target area,

and we are confident that similar new zones will be defined elsewhere within the resource area.”

Figure 1: Initial drill highlights from the Nika Zone (gap area between NW, DW and POR zones)

In addit ion to the assays still pending from drill -holes DO -18-217 and DO -18-218, Maple Gold has

completed a further 5 drill-holes in this area for which assays are pending, and that have the potential to

continue expanding the Nika Zone.

Table 1: Drill highlights from and Nika zones at Douay

*All lengths above are core lengths and not true widths. True widths are estimated to be approximately 90% of core lengths.

Uncut assay values used for intervals given. Coordinates are NAD83 Zone 17N.

Hole

From

(m) To (m) Interval (m) Au (g/t)

Azimuth Dip Coordinate

East

Coordinate

North

DO-18-212 28.7 42 13.3 0.43 0 -60 704892 5491799

DO-18-217 165 178 13.0 0.50 360 -50 705112 5491600

DO-18-217 284 388 104.0 0.44

including 309 326 17.0 1.08

DO-18-217 391 498 Assays pending

DO-18-218 38.8 409 Assays pending 360 -45 705200 5491498

DO-18-218 409.8 423 13.2 0.86

A total of 47 drill-holes have now been completed or are ongoing property-wide, of an originally planned

total of approximately 65 holes. The Company has only received assay results for ten (10) complete drill-

holes to-date and will continue to provide updates as sufficient assay results are received for each target

area. More than 8,600 samples have now been submitted to ALS Laboratories, and with drilling expected

to continue into early May, the Company anticipates drill results throughout April, May and June 2018.

Qualified Person

The scientific and technical data contai ned in this press release was reviewed and prepared under the

supervision of Fred Speidel, M. Sc, P. Geo., Vice -President Exploration, of Maple Gold. Mr. Speidel is a

Qualified Person under National Instrument 43 -101 Standards of Disclosure for Mineral Pro jects. Mr.

Speidel has verified the data related to the exploration information disclosed in this news release

through his direct participation in the work.

Quality Assurance (QA) and Quality Control (QC)

Maple Gold implements strict Quality Assurance (“Q A”) and Quality Control (“QC”) protocols at Douay

covering the planning and placing of drill holes in the field; drilling and retrieving the NQ-sized drill core;

drill-hole surveying; core transport to the Douay Camp; core logging by qualified personnel; sampling

and bagging of core for analysis; transport of core from site to the analytical laboratory; sample

preparation for assaying; and analysis, recording and final statistical vetting of results. For a complete

description of protocols, please visit th e Company’s QA/QC page on the website at:

http://maplegoldmines.com/index.php/en/projects/qa-qc-qp-statement

About Maple Gold

Maple Gold is a well-funded gold exploration company focused on advancing a district-scale gold project

in one of the world’s premier mining jurisdictions. The Company’s 370 km² Douay Gold Project is located

along the Casa Berardi Deformation Zone within the prolific Abitibi Greenstone Belt in northern Quebec,

Canada. The Project has an established gold resource that remains open in multiple directions, with

excellent infrastructure and several large scale operating mines within this prolific mining district. Maple

Gold has a significant drill campaign under way to expand on the known Resource A reas and test new

discovery targets within the Company’s 55 km of strike along the Casa Berardi Deformation Zone. For

more information please visit www.maplegoldmines.com.

ON BEHALF OF MAPLE GOLD MINES LTD.

“Matthew Hornor”

B. Matthew Hornor, President & CEO

For Further Information Please Contact:

Mr. Joness Lang

VP, Corporate Development

Office: +1 416.306.8124

Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE

POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADE QUACY OR ACCURACY OF THIS PRESS

RELEASE.

Forward Looking Statements:

This news release contains “forward -looking information" and “forward-looking statements” (collectively referred to as “forward -looking

statements”) within the meaning of applicable Canadian securities legislation in Canada , including statements about the prospective

mineral potential of the Nika zone, the potential for significant mineralization from other drilling in the referenced drill program and the

completion of the drill program. Forward-looking statements are based on assumptions, uncertainties and management’s best estimate of

future events. Actual events or results could differ materially from the Company’s expectations and projections. Investors ar e cautioned

that forward-looking statements involve risks and uncertainties. Accordingly, readers should not place undue reliance on forward -looking

statements. Forward -looking statements include, but are not limited to, statements regarding timing and completion of the private

placement. When used herein, words such as “anticipate”, “will”, “intend” and similar expressions are intended to identify forward-looking

statements.

Forward-looking statements are based on certain estimates, expectations, analysis and opinions that management believed reasonable at

the time they were made or in certain cases, on third party expert opinions. Such forward-looking statements involve known and unknown

risks, and uncertainties and other factors that may cause our actual events, results, performance or achievements to be materially different

from any future events, results, performance, or achievements expressed or implied by such forward -looking statements. For a more

detailed discussion of such risks and other factors that could cause actual re sults to differ materially from those expressed or implied by

such forward-looking statements, refer to Maple Gold Mines Ltd.’s filings with Canadian securities regulators available on www.sedar.com

or the Company’s website at www.maplegoldmines.com. The Company does not intend, and expressly disclaims any intention or obligation

to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required

by law.