Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MGM.V ·

Maple Gold Completes 6,050 Metre Drill Campaign at Douay

Exploration Programs

Maple Gold Completes 6,050 Metre Drill Campaign at

Douay

Montreal, Quebec--(Newsfile Corp. - April 30, 2019) -

Maple Gold Mines Ltd.

(

TSXV: MGM) (OTCQB: MGMLF) (FSE: M3G

)

("

Maple Gold

" or the "

Company

")

has completed its winter 2019 drilling program, with approximately 6,050 metres drilled in 15 holes,

distributed across the Nika, Porphyry, 531 and Exploration Target areas (see Fig. 1). Several of the drill-holes were drilled to

greater than planned depths as a result of visually significant sulfide mineralisation noted at the originally planned depths.

The primary objective of this work was to demonstrate continuity of higher grade areas both near surface and at moderate

depths (at or beyond base of conceptual pit depths). All of the holes, including exploration drilling 1km south of the resource

area, encountered visually significant sulfide mineralisation; all assays are pending. About half of the drill core has been sawed

to-date; Maple Gold's in-house technicians will complete this work in the coming weeks to prepare samples for shipment to ALS

Laboratory. Assay results are expected to be released as received over the course of the next 8-10 weeks.

Maple Gold's VP Exploration, Fred Speidel, commented:

"

Our drilling within the Nika and Porphyry Zones was designed

to follow up on some of our best results from 2018, with the aim of extending zones and confirming continuity of higher-than-

deposit-average-grade mineralisation within these respective areas. We are equally excited about pending results from the

more limited drilling we completed at the 531 Zone and Exploration Target; the latter has very limited drill density, has not

been drill tested for years and our updated geological model gives us reason to believe there is excellent potential for new

discoveries there."

Additional Drill Campaign Details

2019 contract drilling costs were approximately 15% cheaper on a per-metre basis than in 2018, and drill program support costs

were also reduced. The Company was pleased to surpass its targeted meterage with this 15-hole campaign and believes the

results and new data will make meaningful contributions to the Company's evolving deposit-wide 3D models.

Nika Zone: 1,794 metres drilled (4 drill-holes)

These holes tested near surface and moderate depth extension of the new Nika Zone discovered in 2018, in particular DO-18-

218 (50m averaging 1.77 g/t Au) and DO-18-217 (17m averaging 1.08 g/t Au, within a broader slightly lower-grade interval), and

also deepened one historical hole that ended in 21.10 g/t Au on the western edge of the Nika Zone.

Porphyry Zone: 3,120 metres drilled (8 drill-holes)

These holes mainly tested the continuity of higher than average grades, particularly from 2018 drill intercepts such as in DO-18-

216 (21m averaging 7.87 g/t Au uncut, including visible gold, and within a broader lower grade interval), DO-18-247 (21m

averaging 3.49 g/t Au uncut, including visible gold) and DO-18-254 (27.5m averaging 1.24 g/t Au within a broader lower grade

interval). The holes tested both contact style and syenite-hosted mineralisation.

531 Zone: 432 metres drilled (1 drill-hole)

This single hole tested the near-surface continuity of higher grade mineralisation in historical hole D-92-41 which gave 1.37 g/t

Au over 31.5m in contact style mineralisation including a fault zone.

Exploration Target: 699 metres drilled (2 drill-holes)

Drilling at the Exploration Target tested expansion potential of locally high grade (2.08-17.45 g/t Au from historical drilling)

contact style mineralisation in area with mixed syenite-basalt, located about 1km south of the southern limit of the Porphyry

Zone.

Fig. 1:

Distribution of 2019 drill-hole collars on gradient magnetic base map

To view an enhanced version of Fig. 1, please visit:

https://orders.newsfilecorp.com/files/3077/44416_maple2.jpg

Corporate Updates

The Company is pleased to advise that its Annual General Meeting will be held at 1pm PST on Thursday, June 13, 2019 at the

Company's offices in Vancouver, B.C., located at Suite 600, 1111 West Hastings Street. The Company further reports that it will

not be proceeding with a second tranche to the financing as announced on March 26, 2019. The Company has therefore closed

on a total of $2.3 million of the previously announced $2.6 million.

Qualified Person

The scientific and technical data contained in this press release was reviewed and prepared under the supervision of Fred

Speidel, M. Sc, P. Geo., Vice-President Exploration, of Maple Gold. Mr. Speidel is a Qualified Person under National Instrument

43-101 Standards of Disclosure for Mineral Projects. Mr. Speidel has verified the data related to the exploration information

disclosed in this news release through his direct participation in the work.

Quality Assurance (QA) and Quality Control (QC)

Maple Gold implements strict Quality Assurance ("QA") and Quality Control ("QC") protocols at Douay covering the planning and

placing of drill holes in the field; drilling and retrieving the NQ-sized drill core; drill-hole surveying; core transport to the Douay

Camp; core logging by qualified personnel; sampling and bagging of core for analysis; transport of core from site to ALS

laboratory; sample preparation for assaying; and analysis, recording and final statistical vetting of results. For a complete

description of protocols, please visit the Company's QA/QC page on the website at:

http://maplegoldmines.com/index.php/en/projects/qa-qc-qp-statement

About Maple Gold

Maple Gold is an advanced gold exploration and development company focused on defining a district-scale gold project in one

of the world's premier mining jurisdictions. The Company's ~355 km² Douay Gold Project is located along the Casa Berardi

Deformation Zone (55 km of strike) within the prolific Abitibi Greenstone Belt in northern Quebec, Canada. The Project benefits

from excellent infrastructure and has an established gold resource

3

that remains open in multiple directions. For more

information please visit

www.maplegoldmines.com

.

ON BEHALF OF MAPLE GOLD MINES LTD.

"Matthew Hornor"

B. Matthew Hornor, President & CEO

For Further Information Please Contact:

Mr. Joness Lang

VP, Corporate Development

Cell: 778.686.6836

Email:

[email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS

DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY

OR ACCURACY OF THIS PRESS RELEASE.

Forward Looking Statements:

This news release contains "forward-looking information" and "forward-looking statements" (collectively referred to as "forward-

looking statements") within the meaning of applicable Canadian securities legislation in Canada, including statements about the

prospective

mineral potential of the Porphyry Zone, the potential for significant mineralisation from other drilling in the referenced

drill program and the completion of the drill program. Forward-looking statements are based on assumptions, uncertainties and

management's best estimate of future events. Actual events or results could differ materially from the Company's expectations

and projections. Investors are cautioned that forward-looking statements involve risks and uncertainties. Accordingly, readers

should not place undue reliance on forward-looking statements. Forward-looking statements include, but are not limited to,

statements regarding timing and completion of the private placement. When used herein, words such as "anticipate", "will",

"intend" and similar expressions are intended to identify forward-looking statements.

Forward-looking statements are based on certain estimates, expectations, analysis and opinions that management believed

reasonable at the time they were made or in certain cases, on third party expert opinions. Such forward-looking statements

involve known and unknown risks, and uncertainties and other factors that may cause our actual events, results, performance or

achievements to be materially different from any future events, results, performance, or achievements expressed or implied by

such forward-looking statements. For a more detailed discussion of such risks and other factors that could cause actual results

to differ materially from those expressed or implied by such forward-looking statements, refer to Maple Gold Mines Ltd.'s filings

with Canadian securities regulators available on

www.sedar.com

or the Company's website at

www.maplegoldmines.com

.

The

Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking

statements whether as a result of new information, future events or otherwise, except as required by law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/44416