Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MGG.V ·

Minaurum Drills 8.25 m of 1,760 g/t (57 opt) Silver at Alamos Silver Project

Drill Results

NEWS RELEASE

MINAURUM GOLD INC.

FOR RELEASE: January 18, 2018 TRADING SYMBOL TSX.V:MGG

(MGG 2018 – NR #1)

Minaurum Drills 8.25 m of 1,760 g/t (57 opt) Silver at Alamos Silver Project

Minaurum Gold, Inc, (“Minaurum”) is pleased to announce results from its on -going drill

program in the historic Alamos Silver District in Sonora, Mexico (Fig. 1). Hole AL17-07, the

first hole ever drilled into the Europa -Guadalupe Vein system, intersected 8.25 metres grading

1,760 g/t (57 opt) Silver, 1.6% Copper, 1.5% Lead, and 2.6% Zinc, including 2.2 metres

grading 5,098 g/t (164 opt) Silver, 2.76% Copper, 0.5% Lead, and 1.18 % Zinc. The vein

was cut 325m below surface (Fig. 2) and its true width is estimated to be 90% of the intersection.

Hole AL17 -07 also cut two blind veins that have no surface exposure as well as the Nueva

Europa vein (See Fig. 1), which returned 1.2m grading 542 g/t (17 opt) Silver.

The Europa-Guadalupe vein system is located 1 kilometre west of the Promontorio-Quintera vein

system which was the source of almost all of the historic production from the Alamos district.

The narrow surface outcrop of the Europa-Guadalupe vein was prospected during Colonial times

over more than 1.4 km but was never drill tested.

“We are excited by the grades and widths returned by Hole 7”, stated Stephen Maynard,

VP Exploration of Minaurum. “As only the second hole ever drilled outside of the historic

core of the district , it confirms our “piano -key” structural model and opens the door for

drilling throughout the nearly untouched down-dropped blocks located on both sides of the

up-thrown La Quintera-Promontorio block. With these results, we have now encountered

significant mineralization in every target drilled in our initial drill program including;

Minas Nuevas, Promontorio, Nueva Europa, Gap, and Europa-Guadalupe.”

“Hole 7 emphatically confirms our model that at least some of the narrow veins lacing the

down-dropped blocks flanking the historic production zone are high-level expressions of

significant underlying vein mineralization” said Dr. Peter Megaw, Minaurum Director and

Co-Founder. “It is still early days, but this prov es the Alamos District is bigger than

previously conceived and now we have to focus broadly on stringer swarms throughout the

district to determine just how much larger this system really is.”

Alamos District

The Alamos District produced an estimated 200 million ounces of silver between 1680 and 1907,

largely from three outcropping high-grade veins in the Promontorio -Quintera block. Very little

production came from outside of this block. Historical reports indicate that Alamos’ vein widths

averaged 4 m and locally ranged up to 20 m with grades exceeding 2,000 g/t Ag. Minaurum’s

drill program is the first modern exploration program to be conducted in the district.

Other Results

Two additional drill holes (AL17 -006 and AL17 -008) were drilled into the Gap target, a 400 m

long unmined segment of vein linking the historic La Quintera and Promontorio Mines. Hole

AL17-008 was drilled from the same pad as AL17 -007, but in the opposite direction, and

returned 9.60 metres grading 88 g/t Ag, 0.24% Cu, 0.37% Pb, 0.33% Zn including 2.65 m

averaging 147 g/t Ag . Hole AL17-006 was drilled 400 m to the south of Hole AL17-008 and

intersected a wide zone of faulted quartz veining that returned 16.75 m grading 12 g/t Ag and

0.13% Cu, from 94.05 to 110.80 metres. The nature of the mineralization and the presence of

stringer veins in both holes suggest that these are high -level intercepts and that the target lies

deeper in the structure.

Table 1. Summary of mineralized intercepts, holes AL17-006, AL17-007 and AL17-008

Hole From

(m)

To

(m)

Interval

(m)

Ag

(g/t)

Au

(ppb)

Cu

(%)

Pb

(%)

Zn

(%) Comment

AL17-006 94.05 110.8 16.75 11.8 11 0.13 0.04 0.05 Gap Vein System

AL17-007

181.1 181.6 0.5 81.1 13 0.92 0.1 0.18 Blind Vein

273.3 274.5 1.2 541.5 16 0.28 0.44 0.88 Nueva Europa Vein Zone

499.1 500.1 1 218 23 0.42 0.33 0.73 Blind Vein

521.55 524.6 3.05 114 4 0.19 0.07 0.22

Europa-Guadalupe Vein

System

534.65 542.9 8.25 1,760 58 1.6 1.48 2.6

including

534.65 536.85 2.2 5,098 42 2.76 0.47 1.18

AL17-008

201.30 201.65 0.35 185 16 1.05 2.37 1.44 Blind Vein

229.20 238.80 9.60 88 14 0.24 0.37 0.33

Gap Vein System including

229.75 232.40 2.65 147 24 0.25 0.21 0.28

Figure 1. Map of the central part of the Alamos project, showing known vein zones and surface projections of

drilling to date. Tics on drill-hole traces are at 100-m intervals.

* Ag Equivalent is reported for comparison only, with no assumptions regarding metal recovery or smelter payments. Prices used

are: Au: $1,321.00/troy ounce; Ag: $16.92/troy ounce; Cu: $3.20/pound; Pb: $1.17/pound; and Zn $1.54/pound (all amounts in

U.S. dollars).

Figure 2. Cross section of holes AL17-007 and AL17-008, showing locations of mineralized intervals and

interpreted geology.

* Ag Equivalent is reported for comparison only, with no assumptions regarding metal recovery or smelter payments. Prices used

are: Au: $1,321.00/troy ounce; Ag: $16.92/troy ounce; Cu: $3.20/pound; Pb: $1.17/pound; and Zn $1.54/pound (all amounts in

U.S. dollars).

To date, Minaurum has drilled 2,770 metres of a budgeted 5,000 -metre program at Alamos.

Drilling of additional targets outside of the historic district center is slated to recommence soon.

Minaurum is a Mexico -focused explorer concentr ating on southern Sonora State, the Oaxaca -

Chiapas Region, and the Guerrero Gold Belt, is managed by one of the strongest technical and

finance teams in Mexico. Minaurum's goal is to continue its founders' leg acy of creating

shareholder value by making district-scale mineral discoveries and executing accretive mining

transactions. For more information, please visit our website at www.minaurum.com and our

YouTube Minaurum Video Channel.

ON BEHALF OF THE BOARD

“Darrell A. Rader”

Darrell A. Rader

President and CEO

For more information, please contact:

Sunny Pannu – Investor Relations Manager

(778) 330 0994 or via email at [email protected]

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this

news release.

___________________________________________________________________________

2300 – 1177 West Hastings Street Telephone 778 330-0994

Vancouver, BC V6E 2K3 www.minaurum.com

[email protected]

Stephen R. Maynard, Vice President of Exploration of Minaurum and a Qualified Person as defined by National

Instrument 43-101, reviewed and verified the assay data, and has approved the disclosure in this News Release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward -

looking information. In making the forward -looking statements in this release, Minaurum has applied certain

factors and assumptions that are based on Minaurum’ s current beliefs as well as assumptions made by and

information currently available to Minaurum. Although Minaurum considers these assumptions to be reasonable

based on information currently available to it, they may prove to be incorrect, and the forward -looking statements in

this release are subjec t to numerous risks, uncertainties and other factors that may cause future results to differ

materially from those expressed or implied in such forward -looking statements. Readers are cautioned not to place

undue reliance on forward-looking statements. Minaurum does not intend, and expressly disclaims any intention or

obligation to, update or revise any forward -looking statements whether as a result of new information, future events

or otherwise, except as required by law.

Quality Assurance/Quality Control: Preparation and assaying of drilling samples from Minaurum's Alamos project

are done with strict adherence to a Quality Assurance/Quality Control (QA/QC) protocol. Core samples are sawed

in half and then bagged in a secure facility near the site, and t hen shipped by a licensed courier to ALS Minerals'

preparation facility in Hermosillo, Sonora, Mexico . ALS prepares the samples, crushing them to 70% less than

2mm, splitting off 250g, and pulverizing the split to more than 85% passing 75 microns. The res ulting sample pulps

are prepared in Hermosillo, and then shipped to Vancouver for chemical analysis by ALS Minerals. In Vancouver,

the pulps are analyzed for gold by fire assay and ICP/AES on a 50 -gram charge. In addition, analyses are done for

a 48-element suite using 4 -acid digestion and ICP analysis. Samples with silver values greater than 100 g/t; and

copper, lead, or zinc values greater than 10,000 ppm (1%) are re -analyzed using 4 -acid digestion and atomic

emission spectrometry (AES) or atomic absorption spectrometry (AAS). Samples with silver values more than 1,500

g/t by

AES or AAS are re analyzed by fire assay and gravimetric finish.

Quality-control (QC) samples are inserted in the sample stream every 20 samples, and thus repres ent 5% of the

total samples. QC samples include standards, blanks, and duplicate samples. Standards are pulps that have been

prepared by a third -party laboratory; they have gold, silver, and base -metal values that are established by an

extensive analytical process in which several commercial labs (including ALS Minerals) participate. Standards test

the calibration of the analytical equipment. Blanks are rock material known from prior sampling to contain less

than 0.005 ppm gold; they test the sample prepara tion procedure for cross -sample contamination. In the case of

duplicates, the sample interval is cut in half, and then quartered. The first quarter is the original sample, the second

becomes the duplicate. Duplicate samples provide a test of the reproducib ility of assays in the same drilled interval.

When final assays are received, QC sample results are inspected for deviation from accepted values. To date, QC

sample analytical results have fallen in acceptable ranges on the Alamos project.