Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MERG.V ·

Metal Energy Intersects 36.55 m of 1.13% Nickel Equivalent, Including 19.45 m of 1.69% Nickel Equivalent in a New High-Grade Zone at Manibridge Highlights Include: MNB040A : 36.55 metres of 1.13% NiEq, including 19.45 m of 1.69% NiEq

Drill Results

Metal Energy Intersects 36.55 m of 1.13%

Nickel Equivalent, Including 19.45 m of 1.69%

Nickel Equivalent in a New High-Grade Zone at

Manibridge

Highlights Include:

MNB040A

: 36.55 metres of 1.13% NiEq, including 19.45 m of 1.69% NiEq

MNB039

: 36.2 metres of 0.69% NiEq including 12.15 m of 1.14% NiEq

New high-grade nickel zone demonstrates the discovery potential for multiple high-grade

nickel shoots within the broader mineralized shell at Manibridge.

Toronto, Ontario--(Newsfile Corp. - March 16, 2023) - Metal Energy Corp. (TSXV: MERG) (OTCQB:

MEEEF) (the "

Company

" or "

Metal Energy

") is pleased to announce the final drill hole assays of the

Phase Two drill program (Table 1, Figures 1 & 2) on the high-grade nickel and copper-cobalt

Manibridge project (the "

Project

" or "

Manibridge

") in the Thompson Nickel Belt, Manitoba.

"This new zone of over 1% nickel mineralization in the Upper Lens demonstrates discovery potential for

multiple high-grade nickel shoots within the overall mineralized shell at Manibridge. Manibridge's

mineralized shell is over 1 km of strike, traced down to 800 m depth, and locally exceeds 90 m

thickness. Drill holes MNB036, MNB037 and MNB040A show the growth of this new nickel mineralized

zone that currently measures 25 m thick by 40 m down-dip.

This new zone contains our highest-grade

continuous nickel intersection (19.45 m of 1.69% NiEq). We have maintained a 100% Ni-sulphide

intersection success rate, and 34 of 36 drill holes have intersected over 1% nickel over variable sample

widths.

These facts demonstrate the robust nature of the Manibridge nickel system. Overall, we're thrilled

with the results from 2022's drill programs, and we look to expand and discover additional high-grade

nickel mineralization in 2023," said James Sykes, CEO of Metal Energy.

Table 1 - Drill hole composite assay results from Sections 3N & 4N

DDH

Composite

Width (m)

Ni%

Cu%

Co%

NiEq%

GT

(NiEq% x m)

MNB036 (4N)

Upper Lens

34.25

0.53

0.02

0.01

0.55

18.8

Lower Lens

27.90

0.49

0.02

0.01

0.51

14.2

MNB037 (4N)

Upper Lens

4.50

1.35

0.04

0.02

1.40

6.3

Lower Lens

27.15

0.45

0.01

0.01

0.47

12.8

MNB038 (4N)

Upper Lens

2.70

0.47

0.02

0.01

0.49

1.3

Lower Lens

41.65

0.52

0.02

0.01

0.55

22.9

MNB039 (4N)

Upper Lens

4.25

0.53

0.02

0.02

0.56

2.4

Lower Lens

36.20

0.69

0.03

0.02

0.73

26.4

MNB040A (3N)

Upper Lens

36.55

1.09

0.04

0.02

1.13

41.3

Lower Lens

17.65

0.41

0.01

0.01

0.44

7.8

NOTES:

1. See Table 3 for individual results used to compile these composite results.

Figure 1 – Cross-section of results for Section 4N (MNB036 to MNB039)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7926/158564_figure01.jpg

Figure 2 – Cross-section of results for Section 3N (MNB040A)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7926/158564_figure02.jpg

Manibridge Phase 2 Drill Program Results

A total of 10,091 metres were completed over 36 diamond drill holes, including 6 abandoned drill holes,

with all completed drill holes intersecting visible nickel sulphides. The drill hole collar locations were all

within 150 to 600 metres of the old mine workings. The drill holes targeted the shallower parts of the

Manibridge nickel sulphide system at depths between 100 and 400 metres from surface.

Table 3 provides the individual and composite assay results and Table 4 provides the collar details for

drill holes MNB036 to MNB040A.

Geochemical Sampling Procedures

Drill core samples were shipped to the Saskatchewan Research Council Geoanalytical Laboratories

(SRC) in Saskatoon, Saskatchewan, in secure containment for preparation, processing, and whole rock

and multi-element analysis by ICP-MS2 using total 4-acid digestion (HF:NHO3:HCl:HClO4). Assay

samples comprise 0.2 to 1.5 m continuous samples of cut-core samples over nickel-sulphide

mineralized intervals determined with a handheld XRF.

Point samples comprise an isolated 0.1 to 0.5 m

sample to characterize the rock types, alteration, structure, and potential for mineralization. The SRC is

an ISO/IEC 17025/2005 and Standards Council of Canada certified analytical laboratory. Blanks,

standard reference materials, and quartered core repeats were inserted into the sample stream at

regular intervals by Metal Energy and the SRC in accordance with Metal Energy's quality assurance and

quality control (QA/QC) procedures. Geochemical assay data are subject to verification procedures by

qualified persons employed by Metal Energy prior to disclosure.

All reported depths and intervals are drill hole depths and intervals, unless otherwise noted, and do not

represent true thicknesses, which have yet to be determined.

For the latest videos from Metal Energy, Ore Group, and all things Mining, subscribe to our YouTube

Chanel:

youtube.com/@theoregroup

About the Manibridge Project

Manibridge encompasses 4,368 hectares within the world-class Thompson Nickel Belt. The Project is

20 kilometers southwest of Wabowden, which has significant infrastructure and capacity that has

supported previous exploration programs and mine development, including year-round highway access

via Highway 6.

Table 2 below shows some of Metal Energy's 2022 individual drill hole intersections compared with

historic drill intersections from the mined portion of the Manibridge project.

Table 2 - Selected Historic and Recent Individual Drill Intersections on Manibridge

Hole

Number

Location

From (m)

To (m)

Interval (m)

%Ni

%Ni*m

6-60

Underground

33.83

75.59

41.76

1.80

75.02

W50-39

Mined

98.45

163.98

65.53

1.10

72.14

W50-27

Mined

185.93

210.01

24.08

2.93

70.61

W50-34

Mined

86.26

110.64

24.38

1.88

45.76

W50-31

Mined

244.75

261.52

16.77

2.67

44.84

W50-05

Mined

311.51

336.80

25.29

1.57

39.64

MN08-01

Surface

156.50

195.75

39.25

0.98

38.47

MNB035*

Surface

189.7

221.0

31.30

1.19

37.25

W50-28

Mined

203.30

211.99

8.69

4.15

36.07

W50-09

Mined

178.92

198.73

19.81

1.80

35.62

MNB040A*

Surface

202.55

223.0

20.45

1.62

33.13

W50-33

Mined

274.93

289.56

14.63

2.15

31.50

MNB004*

Surface

150.45

183.4

32.95

0.88

29.00

W50-50

Surface

184.40

196.60

12.20

1.24

15.13

Notes to Table 2:

Cut-off grade = 0.3% Ni

Maximum consecutive internal dilution = 3.0 m downhole

Historic drill holes have not been verified or confirmed with twinned drill holes.

Metal Energy considers "high-grade" to be nickel mineralization with a concentration greater than 0.8% Ni.

All reported depths and intervals are drill hole depths and intervals, unless otherwise noted, and do not represent true thicknesses, which

have yet to be determined.

"*" Drilled by Metal Energy in 2022.

Table 3 - Individual interval and total drill hole composite assay results

DDH

From

To

Interval

Ni%

Cu%

Co%

Ni eq.%

GT (Ni eq%*m)

MNB036

179.00

180.00

1.00

0.34

0.00

0.00

0.34

0.34

186.00

209.00

23.00

0.58

0.02

0.01

0.60

13.80

215.50

225.75

10.25

0.45

0.01

0.01

0.47

4.82

includes

224.50

225.75

1.25

1.35

0.06

0.02

1.39

1.74

296.00

297.00

1.00

0.39

0.02

0.01

0.41

0.41

309.00

310.00

1.00

0.36

0.01

0.01

0.38

0.38

321.75

330.00

8.25

0.32

0.00

0.01

0.33

2.72

344.70

346.00

1.30

0.38

0.00

0.00

0.39

0.51

350.00

361.00

11.00

0.73

0.04

0.01

0.76

8.36

includes

351.50

352.50

1.00

1.31

0.09

0.02

1.37

1.37

and

includes

358.50

359.00

0.50

1.78

0.09

0.03

1.85

0.93

365.00

370.35

5.35

0.32

0.01

0.01

0.34

1.82

Composite

Summary

62.15

0.51

0.02

0.01

0.53

33.16

MNB037

172.75

173.60

0.85

0.33

0.01

0.02

0.36

0.31

176.65

179.55

2.90

1.57

0.04

0.02

1.61

4.67

182.75

183.50

0.75

1.71

0.08

0.02

1.77

1.33

222.45

224.45

2.00

0.34

0.02

0.01

0.37

0.74

247.00

248.00

1.00

0.40

0.01

0.01

0.42

0.42

256.00

258.00

2.00

0.32

0.01

0.01

0.34

0.68

264.00

267.00

3.00

0.39

0.03

0.01

0.42

1.26

274.00

280.00

6.00

0.55

0.02

0.01

0.57

3.42

includes

279.00

280.00

1.00

1.40

0.10

0.02

1.46

1.46

285.00

291.00

6.00

0.33

0.00

0.01

0.34

2.04

296.45

298.55

2.10

0.49

0.02

0.01

0.51

1.07

301.95

307.00

5.05

0.62

0.01

0.01

0.64

3.23

includes

301.95

303.00

1.05

1.04

0.02

0.02

1.07

1.12

Composite

Summary

31.65

0.58

0.02

0.01

0.61

19.17

MNB038

133.30

135.00

1.70

0.48

0.00

0.01

0.50

0.85

144.00

145.00

1.00

0.46

0.04

0.01

0.48

0.48

171.40

172.40

1.00

0.39

0.00

0.01

0.41

0.41

185.70

192.40

6.70

0.36

0.02

0.01

0.39

2.61

214.90

216.90

2.00

0.38

0.00

0.01

0.40

0.80

221.00

223.00

2.00

0.66

0.03

0.01

0.69

1.38

228.00

229.00

1.00

0.41

0.00

0.01

0.42

0.42

235.00

261.50

26.50

0.59

0.01

0.01

0.61

16.17

includes

256.50

258.50

2.00

1.28

0.04

0.02

1.32

2.64

and

includes

261.00

261.50

0.50

2.13

0.03

0.03

2.18

1.09

264.50

265.00

0.50

0.30

0.00

0.01

0.33

0.17

268.00

269.00

1.00

0.34

0.00

0.01

0.36

0.36

280.00

281.00

1.00

0.31

0.13

0.02

0.37

0.37

Composite

Summary

44.40

0.52

0.01

0.01

0.54

24.01

MNB039

117.50

118.50

1.00

0.57

0.00

0.02

0.59

0.59

131.50

132.50

1.00

0.46

0.03

0.01

0.49

0.49

135.50

137.75

2.25

0.54

0.02

0.02

0.57

1.28

156.00

159.00

3.00

0.40

0.01

0.02

0.44

1.32

includes

156.00

156.35

0.35

1.37

0.00

0.08

1.49

0.52

162.00

166.00

4.00

0.38

0.03

0.01

0.41

1.64

180.00

186.10

6.10

0.99

0.04

0.02

1.03

6.28

includes

181.00

186.10

5.10

1.06

0.04

0.02

1.10

5.61

196.00

201.90

5.90

0.55

0.03

0.01

0.57

3.36

includes

197.00

198.00

1.00

1.14

0.09

0.02

1.19

1.19

205.30

221.00

15.70

0.80

0.02

0.02

0.83

13.03

includes

207.30

212.00

4.70

1.11

0.03

0.02

1.15

5.40

and

includes

219.00

220.00

1.00

1.03

0.03

0.02

1.07

1.07

225.00

226.00

1.00

0.38

0.01

0.02

0.40

0.40

242.90

243.40

0.50

0.42

0.16

0.04

0.52

0.26

Composite

Summary

40.45

0.68

0.03

0.02

0.71

28.66

MNB040A

176.00

179.00

3.00

0.33

0.01

0.01

0.35

1.05

185.00

198.10

13.10

0.52

0.03

0.02

0.55

7.21

202.55

223.00

20.45

1.57

0.06

0.02

1.62

33.13

includes

202.55

222.00

19.45

1.63

0.06

0.02

1.69

32.87

267.50

268.50

1.00

0.44

0.00

0.03

0.49

0.49

275.50

276.50

1.00

0.35

0.00

0.02

0.37

0.37

286.00

296.00

10.00

0.35

0.00

0.01

0.37

3.70

320.20

322.35

2.15

0.40

0.00

0.01

0.41

0.88

335.00

336.00

1.00

1.09

0.05

0.02

1.13

1.13

339.00

341.00

2.00

0.43

0.02

0.01

0.44

0.88

360.50

361.00

0.50

0.35

0.15

0.02

0.43

0.22

Composite

Summary

54.20

0.87

0.03

0.02

0.90

49.05

NOTES:

1

.

Ni% cutoff grade is 0.30%.

2

.

Ni% cutoff grade for "

includes

/

and includes"

is 1.00% Ni.

3

.

Reported widths do not contain greater than 2 m of consecutive core with less than cutoff grades.

4

.

Ni eq.% is calculated as the sum of Ni% + Co% * (51,960/33,960) + Cu% (9,470/33,960).

5

.

Price of Ni = $33,960/metric ton, price of Co = $51,960/metric ton, price of Cu = $9,470/metric ton

6

.

Metal prices were derived from Shanghai Metal Market website (

www.metal.com

) on January 3, 2023.

Table 4 - Drill hole collar details

DDH

Target Area

Section

East

North

Elevation

Azimuth

Dip

EOH

MNB036

Manibridge Mine

4 North

510,738

6,062,122

236

300

-82

401.75

MNB037

Manibridge Mine

4 North

510,738

6,062,122

236

300

-73

356

MNB038

Manibridge Mine

4 North

510,738

6,062,122

236

300

-60

296

MNB039

Manibridge Mine

4 North

510,738

6,062,122

236

300

-47

264.15

MNB040A

Manibridge Mine

3 North

510,713

6,062,093

236

300

-80

283

5 DDH

1,700.9

NOTES: East and North units are metres using NAD83 datum, UTM Zone 14N.

Elevation is recorded as "metres above sea level".

EOH = End of hole, measured in metres

About Metal Energy Corp.

Metal Energy is a nickel and battery metal exploration company with two projects, Manibridge and

Strange, in the politically stable jurisdictions of Manitoba and Ontario, Canada, respectively. The

Manibridge project is 85% owned by Metal Energy and 15% owned by Mistango River Resources Inc.

The Strange project is subject to earn-in agreements where the Company can acquire 100% exploration

rights to approximately 12,000 hectares.

QP Statement

The technical information contained in this news release has been reviewed and approved by Mike

Sweeny, P.Geo., Vice-President, Exploration & Development for Metal Energy, and a Qualified Person

as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

For further information, please contact:

Metal Energy Corp.

MERG on the TSXV

James Sykes, CEO

[email protected]

306-221-8717

www.metalenergy.ca

Reader Advisory

Certain information set forth in this news release contains forward-looking statements or information

("

forward-looking ​statements

"), including details about the business of the Company. By their

nature, forward-looking statements are subject to numerous risks ​and uncertainties, some of which are

beyond the Company's control, including the impact of general economic conditions, ​industry

conditions, volatility of commodity prices, currency fluctuations, environmental risks, operational risks,

competition from ​other industry participants, stock market volatility. Although the ​Company believes

that the expectations in its forward-looking statements are reasonable, its forward-looking statements

have ​been based on factors and assumptions concerning future events which may prove to be

inaccurate. Those factors and ​assumptions are based upon currently available information. Such

statements are subject to known and unknown risks, ​uncertainties and other factors that could

influence actual results or events and cause actual results or events to differ materially ​from those

stated, anticipated or implied in the forward-looking statements. Accordingly, readers are cautioned

not to place undue ​reliance on the forward-looking statements, as no assurance can be provided as to

future results, levels of activity or achievements. ​Risks, uncertainties, material assumptions and other

factors that could affect actual results are discussed in our public disclosure ​documents available at

www.sedar.com

including the Filing Statement dated November 15, 2021. Furthermore, the forward-

looking statements contained in this document are made as of ​the date of this document and, except

as required by applicable law, the Company does not undertake any obligation to publicly ​update or to

revise any of the included forward-looking statements, whether as a result of new information, future

events or ​otherwise. The forward-looking statements contained in this document are expressly

qualified by this cautionary statement.​

Neither the TSX Venture Exchange Inc. nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/158564