Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MEK.V ·

Metals Creek Drills 1.50 g/t Gold over 18.00 Meters at Dona Lake

Drill Results

Metals Creek Drills 1.50 g/t Gold over 18.00

Meters at Dona Lake

Thunder Bay, Ontario--(Newsfile Corp. - May 17, 2022) -

Metals Creek Resources Corp.

(TSXV:

MEK) (OTCQB: MCREF) (FSE: M1C1

) (the "

Company

" or

Metals Creek)

is pleased to announce

additional diamond drill results

from drill hole DL22-028

of the phase III diamond drill program at the

Dona Lake Gold project (See News Release November 08, 2021).

Results from drill hole DL22-028 continue to define gold mineralization within main zone, south of the

mine workings as well as intercepting mineralization within

B-Zone at the past producing Dona Lake

Gold mine. This hole targeted main zone stratigraphy outside the currently defined mineralized envelope,

extending gold mineralization an additional 30m south within the deeper portion of the mineralized iron

formation (See Figure 1, Schematic Long Section and Figure 2, Schematic X-Section)

This hole

intersected the Main Zone stratigraphy 424 meters below surface and returned a core length intercept of

2.56 grammes per ton(g/t) gold (Au) over 6.14 meters(m) ( 464.61 - 470.75m).

This was a part of a

broader zone of mineralization of 1.50 g/t Au over 18.00m (458.00 - 476.00m

). A second zone of

mineralization was intercepted (B-Zone) 473m below surface, which returned a core length intercept of

2.05 g/t Au over 9.11m, included in this is 8.88 g/t Au over 1.45m (See Table 1 Significant Results,

Figure 2 Schematic X-section). Mineralization within the main zone intercept is hosted within silicate-

sulfide iron formation and characterized by stringer to locally disseminated pyrrhotite ranging from 1 to

5% with local pyrite. Magnetite rich sections with local pyrrhotite stringers are locally present. The B-Zone

intercept is characterized by trace to 15%

disseminated to stringer pyrrhotite with minor pyrite. B-Zone

has seen limited drilling historically and represents a prospective target that remains open at depth.

This phase III diamond drill program has successfully defined additional high-grade gold mineralization

south of the Dona Lake mine workings. Deeper drilling targeting Main Zone stratigraphy below the

lowermost mine workings has further extended high grade gold mineralization down plunge to a vertical

depth of 753m (See news release April 5, 2022) from recently reported drill hole DL22-025 returning a

high-grade down hole intercept of 8.11 g/t over 9.51m. This hole represents the deepest hole to date on

the Dona Lake property with gold mineralization remaining open at depth.

Figure 1 Schematic Longitudinal

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/943/124342_553a0883242d1b3d_002full.jpg

Figure 2 Schematic Cross-section

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/943/124342_553a0883242d1b3d_003full.jpg

Table 1 - Significant Results

Drill Hole

From (m)

To (m)

Total (m)

Grammes

Remarks

Number

Per Ton Gold

DL22-026

Hit Mine Workings

DL22-028

458

476

18

1.5

Main Zone

Including

464.61

470.75

6.14

2.56

Main Zone

and

522.1

531.21

9.11

2.05

B Zone

including

522.1

523.55

1.45

8.88

B Zone

True thickness is 70-80% of drill intercept length.

Assays are pending for 3 drill holes at Dona Lake, results will be released once they are received and

compiled. In addition, assays from Ogden drilling will be released once they are received and complied.

The Dona Lake Gold Project was optioned from Newmont Corporation (previously Newmont Goldcorp -

see news release dated 13 June 2019) and is located in the Pickle Lake Greenstone Belt which is host

to several historic mines including the Dona Lake mine, the Central Patricia mine and the Pickle Crow

mine. Dona Lake is accessible by an all-weather road southeast from the Town of Pickle Lake. The

Project consists of 32 patented and leased mining claims and 35 map staked claims totaling

approximately 1,122 hectares and covers the past producing Dona Lake Mine.

Michael MacIsaac, P.Geo and VP Exploration for the Corporation and a qualified person as defined in

National Instrument 43-101, is responsible for this release, and supervised the preparation of the

information forming the basis for this release.

All split core samples were sent to Activation Laboratories.

The precious metals were analyzed utilizing

a standard fire assay with an atomic absorption finish.

As part of the Corporations QAQC protocol,

approximately 10% of the samples submitted for assay were also sent for check assays.

Standards and

blanks were inserted randomly into the sample shipments as part of the sampling protocol.

Samples with

fire assay results above 1.0 g/t gold are re-analyzed using a gravimetric finish and samples with fire

assay results above 5.0 g/t gold or samples showing visible gold are analyzed using the pulp metallic

method.

About Metals Creek Resources Corp.

Metals Creek Resources Corp. is a junior exploration Company incorporated under the laws of the

Province of Ontario, is a reporting issuer in Alberta, British Columbia and Ontario, and has its common

shares listed for trading on the Exchange under the symbol "MEK". Metals Creek has earned a 50%

interest in the Ogden Gold Property from Newmont Corporation, including the former Naybob Gold mine,

located 6 km south of Timmins, Ontario and has an 8 km strike length of the prolific Porcupine-Destor

Fault (P-DF). In addition, Metals Creek has signed an agreement with Newmont Corporation,

where Metals Creek can earn a 100% interest in the past producing Dona Lake Gold Project in the

Pickle Lake Mining District of Ontario.

Metals Creek also has multiple quality projects available for option in Ontario and Newfoundland which

can be viewed on the Corporation's website. Parties interested in seeking more information about

properties available for option can contact the Corporation at the number below.

Additional information concerning the Corporation is contained in documents filed by the Corporation

with securities regulators, available under its profile at

www.sedar.com

.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Alexander (Sandy) Stares, President and CEO

Metals Creek Resources Corp

telephone: (709)-256-6060

fax : (709) -256-6061

email :

[email protected]

www.MetalsCreek.com

Twitter.com/MetalsCreekRes

Facebook.com/MetalsCreek

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/124342