Saturday, September 19, 2026
MiningNewsTerminal
Saturday, September 19, 2026 Admin

MEC.CN ·

Mustang Energy Commences an Airborne Survey at Spur Project South of the Athabasca Basin, Saskatchewan

Exploration Programs

Mustang Energy Commences an Airborne Survey at Spur

Project South of the Athabasca Basin, Saskatchewan

VANCOUVER, British Columbia, June 11, 2025 (GLOBE NEWSWIRE) -- Mustang Energy Corp. (CSE: MEC,

OTC:MECPF, FRA:92T) (the “Company” or “Mustang”) is pleased to announce that it has initiated an Aerial

Electromagnetic Survey (Xcite ™ TDEM) with Radiometrics over the Spur Project (the “Project”) located

south of the Athabasca Basin, Saskatchewan. The Project is located in a favorable region prospective for

uranium, rare earth elements (REEs), and base metal mineralization.

The Xcite™ TDEM survey with Radiometrics will be flown by Axiom Exploration Group. The airborne survey

will encompass the portion of the claim package covering approximately 10,000 hectares which has not

been covered by modern day electromagnetic (EM) survey techniques. The airborne survey aims to

precisely locate EM and radiometric anomalies, and aid in geological interpretations on the property

advancing exploration targeting.

About Xcite™ TDEM

Xcite™ is a new generation of helicopter-borne time-domain electromagnetic (TDEM) systems developed

by New Resolution Geophysics (NRG ™). Axiom is an exclusive provider of this service in North America.

This state-of-the-art technology provides an efficient alternative to prior TDEM technologies for mineral

exploration. The system utilizes a patented inflatable transmitter loop with a dia meter of approximately

20 meters, suspended about 30 meters below the helicopter. The Xcite ™ system offers improved signal

clarity, enabling the detection of subtle subsurface features. It features a programmable waveform with

a fast turn-off time, allowing for flexibility in data acquisition and improved resolution of both shallow and

deep targets.

Figure 1: Mustang Energy Corp. Spur Project Location Map1

About the Spur Project

The Project comprises ten claims covering 23,680 hectares. It is located just south of the Athabasca Basin

in northern Saskatchewan, a region globally renowned for its high-grade uranium deposits. The property

is approximately 40 kilometers southeast of Cameco’s Key Lake Mill Operation and 20 kilometers

southwest of Skyharbour Resources/Terra Clean Energy’s Fraser Lakes Zone B deposit (Figure 1). The

Project’s geological setting combines Proterozoic basement rocks of the Wollaston Group and uraniferous

pegmatites1, presenting potential for uranium, thori um and rare earth element (REE) exploration. The

Project offers lower cost exploration due to the absence of Athabasca Sandstone cover. Adjacent

properties host high-grade surface grab samples including the Pipe Lake Showing with up to 8.0% U₃O₈

(sample # R69-10)2 within a hornblende-rich pegmatite 2.5 km northeast of the Project boundary. 2 The

Red October Showing, east of the Project boundary, shows grab sample assays of up to 1.93% U (sample

# JBELR063) 3 within syenite, and an outcrop chip sample through semipelitic gneiss showing 1.34% U

(sample # AGELR008)3 over 1 meter.

Adjacent Property Disclaimer:

This news release includes references with respect to uranium occurrences which are located near the

Project, including the Pipe Lake Showing and Red October Showing. Mustang considers this information

to be relevant to exploration; however, these results have not been physically verified by Mustang’s

Qualified Person. The Company advises that, notwithstanding their proximity of location, discoveries of

minerals on nearby properties and any promising results thereof are not necessarily indicative of the

mineralization of, or located on the Project, or the Company’s ability to commercially exploit the Project,

or to locate any commercially exploitable deposits therefrom. The Company cautions investors on relying

on this information as the Company has not confirmed the accuracy or reliability of the information.

References:

1. Saskatchewan GeoAtlas,

https://gisappl.saskatchewan.ca/Html5Ext/index.html?viewer=GeoAtlas

2. Saskatchewan Mineral Deposits Index. SMDI# 1005,

https://mineraldeposits.saskatchewan.ca/Home/Viewdetails/1005

3. Saskatchewan Mineral Deposits Index. SMDI# 5219,

https://mineraldeposits.saskatchewan.ca/Home/Viewdetails/5219

Qualifying Statement

The scientific and technical information in this release has been reviewed and approved by Lynde

Guillaume, P.Geo., Technical Advisor for Mustang, a registered member of the Professional Engineers and

Geoscientists of Saskatchewan. Ms. Guillaume is a Qualified Person as defined by National Instrument 43-

101.

About Mustang Energy Corp.:

Mustang is a resource exploration company focused on acquiring and developing high-potential uranium

and critical mineral assets. The Company is actively exploring its properties in Northern Saskatchewan,

Canada and holds 92,211 hectares in around the Athabasca Basin. Mustang’s Ford Lake project covers

7,743 hectares in the prolific eastern Athabasca Basin, while its Cigar Lake East and Roughrider South

projects span 3,442 hectares, and the south-east region with the Spur Project (23,680 hectares). Mustang

has also established a footprint in the Cluff Lake region of the Athabasca Basin with the Yellowstone

Project (21,820 hectares) and further expanded its presence in the south-central region of the Athabasca

Basin with the Dutton Project (7,633 hectares). For further information, please contact:

Mustang Energy Corp.

Attention: Nicholas Luksha, CEO and Director

Phone: (604) 838-0184

Forward-Looking Information

Neither the CSE nor the Market Regulator (as that term is defined in the policies of the CSE) accepts

responsibility for the adequacy or accuracy of this release.

This news release includes certain statements and information that may constitute forward -looking

information within the meaning of applicable Canadian securities laws. Forward-looking statements relate

to future events or future performance and reflect the expectations or beliefs of management of the

Company regarding future events. Generally, forward -looking statements and information can be

identified by the use of forward -looking terminology such as “intends”, “believes” or “anticipates”, or

variations of such words and phrases or statements that certain actions, events or results “may”, “could”,

“should”, “would” or “occur”. This information and these statements, refe rred to herein as “forward-

looking statements”, are not historical facts, are made as of the date of this news release and include

without limitation, statements regarding discussions of future plans, estimates and forecasts and

statements as to management 's expectations and intentions with respect to, among other things, the

future potential of the mineral claims held by the Company, including the Project; the timing for the

commencement of the Xcite™ TDEM survey; and the potential capabilities of the Xcite™ TDEM survey. In

making the forward -looking statements in this news release, the Company has applied several material

assumptions, including without limitation the assumption that the Company will be able to continue

exploring its properties given various environmental and economic factors outside of its control and that

the results of the Xcite™ TDEM survey will provide the anticipated insights. Although management of the

Company has attempted to identify important factors that could cause actual results to differ materially

from those contained in forward-looking statements or forward-looking information, there may be other

factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that

such statements will prove to be accurate, as actual results and future events could differ materially from

those anticipated in such statements. Accordingly, readers should not place undue reliance on forward -

looking statements and forward -looking information. Readers are caution ed that reliance on such

information may not be appropriate for other purposes. The Company does not undertake to update any

forward-looking statement, forward -looking information or financial out -look that are incorporated by

reference herein, except in accordance with applicable securities laws.