MAX Reports Positive Gold and Platinum Assay Results from its Choco Project in Colombia
MAX Reports Positive Gold and Platinum Assay Results from its Choco Project in Colombia
Vancouver, BC, April 16, 2019, MAX RESOURCE CORP. (TSXV: MXR) (OTC: MXROF) (FSE:M1D1) (“MAX” or the
“Company”) is pleased to report surface assay results from its ongoing exploration on the Company’s 1,757 sq. km
“Choco Gold and Platinum Project”, located 100km SW of Medellin, Colombia.
The concentrates of sample 001 graded 340.84 g/t gold and 111.03 g/t platinum and sample 002 graded 222.06 g/t gold
and 113.83 g/t platinum, both samples were located within the 1,000 sq. km exploration zone (refer to location map).
Sampling detail can be found in the accompanying table. Further analytical results will be reported as received.
Production figures the 8 districts: Upper San Juan, Condoto Flats, Condoto Big Flat, Bebedo, Liorento, Cajon, El Tamana & Bajo Tamana a resourced from R.J.Fletcher &
Associates (2011) Review of Gold and Platinum Exploration & production in Choco Province, Colombia. Part 3. Private Report for Condoto Platinum Ltd.
“The assay results from Samples 001 and 002 are impressive and confirm the presence of noteworthy amounts of gold
and platinum on our Choco project,” said Brett Matich, President and Chief Executive Officer, MAX. “We continue to
enhance our analytical procedures to ensure optimal recovery of fine gold samples, and we look forward to continuing
our exploration program within the 1,000 sq. km exploration zone and will now expand to the north.”
Sample 001 and 002 were taken from surface within the same area as the hard rock conglomerate. The gold and
platinum are of a coarser nature than the finer gold in the conglomerate. Test work is on-going on the conglomerate
samples, with analytical procedure focused on optimal recovery of the fine gold.
MAX’s on-going exploration will continue to target enrichment zones within and outside the current 1,000 sq. km
exploration area. Sampling of conglomerates and overlying surface deposits will continue to locate zones of gold
enrichment within the conglomerates. The Company also continues to review and explore additional areas with the
1,757 sq. km Choco Gold and Platinum Project.
Sample Concentrate Tailings Partial Grade *
Number Weight (g) Weight (g) Au (gpt) Pt (gpt) Weight (g) Au (gpt) Pt (gpt) Au (gpt) Pt (gpt)
001 26,800 57.99 340.84 111.03 26,742 No assay No assay 0.74 0.24
002 22,800 39.39 222.06 113.83 22,760.61 No assay No assay 0.38 0.20
* Sample grade is partial as the gold and platinum content of the tailings has not been determined.
Assay Methodology
MAX continues to work with the CIMEX Mineral Institute at the Medellin Mines Faculty of the National University of
Colombia (CIMEX) in Medellin. CIMEX is independent of MAX and carries out all of the processing and testing of the
samples. The surface samples are delivered to the CIMEX. Each sample is panned to concentrate by MAX’s Colombian
specialist panner under the direct supervision of CIMEX personnel. The entire sample is first weighed, then panned. The
resulting concentrate is photographed, dried, weighed and then analyzed at CIMEX.
The entire concentrate is leached in aqua regia for 48 hours to dissolve the gold and platinum. The leachate is then
analyzed on an atomic absorption mass spectrometer for gold and platinum. The tailings of the concentrate from the
leaching process are fire assayed in their entirety with the resulting button dissolved by aqua regia and analyzed on the
atomic absorption mass spectrometer for gold and platinum. The final gold and platinum values for the concentrates are
calculated utilizing the leachate and fire assay values. CIMEX is currently in the audit process to receive its ISO
certification.
About Max Resource Corp.
MAX is a mineral exploration company focused on the development and acquisition of prospective projects in the rich
mineral belts of Colombia. The Company has established significant exploration infrastructure and local community
support for the Choco Gold and Platinum Project, located 100 km south of Medellin, which covers or is adjacent to
historic production of 1.5Mozs gold and 1.0Mozs platinum. The Company’s Gachala Copper Project, is located 60 km
east of Bogota. The Company is led by a seasoned management team with a track record of significant discovery and
exploration success.
Source: R.J. Fletcher and Associates (2011) Review of Gold and Platinum Exploration and Production in Choco Province Colombia Part 3. Private Report for Condoto
Platinum Ltd.)
MAX cautions investors it has yet to verify the historic information.
For more information visit: https://www.maxresource.com/
For additional information contact:
Max Resource Corp.
Tim McNulty
T: (604) 290-8100
For Max Resource’s French inquiries:
Remy Scalabrini, Maricom Inc.
T: (888) 585-MARI
Tim Henneberry, PGeo (British Columbia), a member of the Max Resource advisory board, is the qualified person who has reviewed and approved the technical content
of this news release on behalf of the company.
No stock exchange or securities regulatory authority has reviewed or accepted responsibility for the adequacy or accuracy of this release. Except for statements of
historic fact, this news release contains certain "forward-looking information" within the meaning of applicable securities law. Forward-looking information is frequently
characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or
conditions "may" or "will" occur. Forward-looking statements are based on the opinions and estimates at the date the statements are made and are subject to a variety
of risks and uncertainties and other factors that could cause actual events or results to differ materially from those antici pated in the forward- looking statements
including, but not limited to delays or uncertainties with regulatory approvals, including that of the CSE. There are uncertainties inherent in forward-looking information,
including factors beyond the Company’s control. There are no assurances that the commercialization plans for UXD described in this news release will come into effect
on the terms or time frame described herein. The Company undertakes no obligation to update forward- looking information if circumstances or management's
estimates or opinions should change except as required by law. The reader is cautioned not to place undue reliance on forward- looking statements. Additional
information identifying risks and uncertainties that could affect financial results is contained in the Company’s filings with Canadian securities regulators, which filings
are available at www.sedar.com