Montage Gold Corp. Reports Infill Drill Results and Feasibility Study Update

Drill Results

/g21/g4

/g4

/g4

Montage Gold Corp. Reports Infill Drill Results and Feasibility Study Update 

Vancouver, British Columbia — June 22, 2021 — Montage Gold Corp . (“Montage” or the “Company”) 

( T S X V :  M A U )  ( O T C P K :  M A U T F )  i s  p l e a s e d  t o  r e p o r t  a d d i t i o n a l  r e s ults  from  the  Company’s  infill  drill 

program and an update on the ongoing Feasibility Study at the Koné Gold Project (“KGP”) in Côte d’Ivoire. 

Hugh Stuart, Montage CEO commented, “Infill drilling at the KGP is nearing completion and Management 

continues to be highly encouraged by the results, which are consistently demonstrating wide homogenous 

mineralization throughout the deposit. The key question at this  stage of any project is how much of the 

Inferred  Mineral  Resource  will  convert  to  the  Indicated  Mineral   Resource  category  to  support  the 

calculation of a Mineral Reserve estimate. Given the nature of the mineralization and the conservatism of 

our modelling approach we are expecting a conversion rate of ov er 90%, and results to date support this 

view. The Company is on track for the calculation of the maiden  Indicated Mineral Resource estimate in 

early Q3 of this year. 

“Significant progress is also being made in respect of the Feas ibility Study. Geotechnical drilling has been 

completed, hydrological drilling is in progress and 2,200kg of metallurgical samples have been sent to SGS 

Lakefield in Canada for Feasibility level leach and comminution  variability testing. Lycopodium Minerals 

Pty Ltd. (“Lycopodium”) and Knight Piesold have also commenced feasibility level design and engineering. 

“With  the  completion  and  filing  of  the  Preliminary  Economic  Assessment  (the  “PEA”),  the  Company  is 

pressing hard on the work to advance and de‐risk the KGP. Manag ement expects the Feasibility Study to 

be completed by year‐end 2021 and to have a fully‐permitted project in early 2022.”  

HIGHLIGHTS 

 Latest  results  from  infill  program  continue  to  confirm,  or  improve  upon,  existing  mineralization 

within the core of the Koné deposit, including: 

o MDD066:  105.00m grading 1.10g/t w ithin 230.05m grading 0.93g/t 

o MDD068:  111.00m grading 1.04g/t w ithin 241.05m grading 0.77g/t 

o MDD069:  77.15m grading 0.80g/t w ithin 301.80m grading 0.60g/t 

 Feasibility Study test work progressing. 

o 135 metallurgical samples (2,200kg)  sent to SGS Lakefield for l each and comminution variability 

program; 

o Geotechnical drilling completed; 

o Hydrological drilling in progress; and 

o Feasibility level design and engineering work commenced by Lyco podium and Knight Piesold. 

 ESIA and permitting efforts continue to advance. 

o Community consultations have commenced; 

o ESIA related field work is complete; and 

o Permitting advisor has been engaged. 

/g22/g4

/g4

/g4

DETAILS 

Infill Drill Results 

Montage has been continuously drilling since January 2021 with  as many as seven drill rigs in operation. 

The expanded infill drill program is now 95% complete with a to tal of 49,694m drilling now completed 

(30,267m core, 19,427m RC). All assays are expected to be received by late July. 

The primary aim of this infill program is to upgrade the existing Inferred Mineral Resource to the Indicated 

Mineral  Resource  category  in  support  of  the  ongoing  Feasibility  S t u d y .  D u e  t o  t h e  c o n s i s t e n c y  o f  

mineralization at Koné and our conservative resource modelling  approach we expect a high  degree of 

conversion,  and  this  has  been  reinforced  by  the  assay  results  we  have  been  receiving  throughout  the 

program.  

The infill section shown below shows the January 2021 Inferred  Mineral Resource model overlain with 

results from drilling completed since that time and coloured in  the same way. The grade profile in both 

the resource model and infill drill assays are very similar and  support our expectation that +90% of the 

Inferred Mineral Resource estimate will be converted to the Indicated Mineral Resource category. 

Figure 1: Koné deposit cross‐section 4850 with infill drill results highlighted. 

In addition, drill holes have been targeted to test the depth extension of mineralization below the current 

PEA Pit design. As the section above also shows the current PEA  pit design lies very close to the base of 

t h e  r e s o u r c e  m o d e l  a n d  h a s  t h e  p o t e n t i a l  t o  g o  d e e p e r  p r o v i d i n g f u r t h e r  u p s i d e  t o  t h e  p r o j e c t .  T h e  

complete table of drill results reported in this release is included as Appendix 1. 

/g23/g4

/g4

/g4

Feasibility Study Update 

Several work programs are underway in support of the ongoing Fe asibility Study for the KGP, including 

design and engineering currently underway by Lycopodium and Kni ght Piesold. The Feasibility Study is 

targeted for completion by the end of 2021. 

The company has shipped 135 samples totalling 2,200kg of materi al to SGS Lakefield in Ontario, Canada 

for leaching and comminution variability testing. These samples were selected to be representative of the 

grade profile and rock types of the Koné deposit to better support the estimates that will be incorporated 

into the Feasibility Study. Montage has already conducted a significant amount of variability testing, based 

on 43 comminution samples and 39 leach samples. Prior testing h as demonstrated that the Koné deposit 

mineralization  can  deliver  high  gold  recoveries  with  low  reagen t  consumptions  and  medium‐low 

resistance to grinding provide favourable processing economics  and a simple flowsheet. 

A  further  two  holes  (650m)  have  been  drilled  to  complete  the  Feasibility  Study  geotechnical  drilling 

program. Prior testwork has determined that the host rock is extremely competent with minimal faulting 

supportive of pit wall angles of 55° for the hanging wall and f ootwall, a key driver of the projected low 

strip ratio of 0.93:1. 

Additional hydrology drilling and test work is being conducted  and prior hydrology testing completed by 

GCS (Pty) Ltd. determined that in‐pit water inflows were manageable.  

Permitting Efforts 

The ESIA is advancing, and all field related work is  now comple te. The public consultation process has 

commenced, and the company recent ly presented to 11 government  institutions that will be involved in 

the environmental and mining permitting process. Support for th e project thus far has been very strong 

from all stakeholder groups and Montage will continue to engage with local communities and government 

bodies as the permitting process advances.  

The Company anticipates the submission of the ESIA in Q4 2021 along with the mining permit application. 

Based on precedent,  the  Company believes it will be possible  to  have both environmental and mining 

permits in hand in early 2022. To support these efforts, Montag e has engaged a local permitting advisor 

who has experience working with several mid‐tier and larger mining companies in Côte d’Ivoire. 

ABOUT MONTAGE GOLD CORP. 

Montage  is  a  Canadian‐based  precious  metals  exploration  and  dev elopment  company  focused  on 

opportunities  in  Côte  d’Ivoire.  The  Company’s  flagship  property i s  t h e  K o n é  G o l d  P r o j e c t ,  l o c a t e d  i n  

northwest Côte d’Ivoire, which currently hosts an Inferred Mineral Resource of 211Mt grading 0.59g/t for 

4.00Moz  of  gold,  based  on  a  0.20g/t  cutoff  grade  (please  see  the  NI  43‐101  Technical  Report  titled 

“Preliminary  Economic  Assessment  for  the  Koné  Gold  Project”  available  on  the  Company’s  website  at 

www.montagegoldcorp.com  and  unde r  the  Company’s  profile  at  www. sedar.com).  Montage  has  a 

management team and board with s ignificant experience in discov ering and developing gold deposits in 

Africa. The Company is rapidly progressing work programs at the  Koné Gold Project towards completion 

of a Feasibility Study by the end of 2021.  

/g24/g4

/g4

/g4

QUALIFIED PERSONS STATEMENT 

The technical contents of this release have been approved by Hu gh Stuart, BSc, MSc, a Qualified Person 

pursuant  to  National  Instrument  43‐101.  Mr.  Stuart  is  the  Chief E x e c u t i v e  O f f i c e r  o f  t h e  C o m p a n y ,  a  

Chartered  Geologist  and  a  Fellow  of  the  Geological  Society  of  London.  Samples  used  for  the  results 

described herein have been prepared and analyzed by fire assay  using a 50‐gram charge at the Bureau 

Veritas facility in Abidjan, Côte d’Ivoire and at Intertek in Tarkwa Ghana. Field duplicate samples are taken 

and blanks and standards are added to every batch submitted. 

CONTACT INFORMATION 

Hugh Stuart 

Chief Executive Officer 

[email protected]  

Adam Spencer 

Executive Vice President, Corporate Development 

[email protected] 

mobile: +1 (416) 804‐9032  

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the 

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

FORWARD LOOKING STATEMENTS 

This press release contains certain forward‐looking information  and forward‐looking statements within 

the  meaning  of  Canadian  securities  legislation  (collectively,  “ Forward‐looking  Statements”).  All 

statements, other than statements of historical fact, constitute Forward‐looking Statements. Words such 

as “will”, “intends”, “proposed” and “expects” or similar expre ssions are intended to identify Forward‐

looking Statements. Forward looking Statements in this press re lease include statements related to the 

Company’s  resource  properties,  and  the  Company’s  plans,  focus  a nd  objectives.  Forward‐looking 

Statements  involve  various  risks  and  uncertainties  and  are  based  o n  c e r t a i n  f a c t o r s  a n d  a s s u m p t i o n s .  

There can be no assurance that such statements will prove to be  accurate, and actual results and future 

events  could  differ  materially  from  those  anticipated  in  such  statements.  Important  factors  that  could 

cause actual results to differ materially from the Company's expectations include uncertainties related to 

f l u c t u a t i o n s  i n  g o l d  a n d  o t h e r  c o m m o d i t y  p r i c e s ,  u n c e r t a i n t i e s  inherent  in  the  exploration  of  mineral 

properties, the impact and progression of the COVID‐19 pandemic  and other risk factors set forth in the 

Company’s final prospectus under the heading “Risk Factors”. Th e Company undertakes no obligation to 

update or revise any Forward‐looking Statements, whether as a r esult of new information, future events 

or  otherwise,  except  as  may  be  required  by  law.  New  factors  emerge  from  time  to  time,  and  it  is  not 

possible for Montage to predict all of them, or assess the impact of each such factor or the extent to which 

any factor, or combination of factors, may cause results to dif fer materially from those contained in any 

Forward‐looking Statement. Any Forward‐looking Statements contained in this press release are expressly 

qualified in their entirety by this cautionary statement. 

/g25/g4

/g4

/g4

APPENDIX 1: Core Drilling Results for Assays Received after the May 11, 2021 Press Release 

Note:  Bolded intervals represent the full mineralized width of  the Koné deposit 

  Intercepts are +90% of true width 

Grid: WGS84 UTM Zone 29N 

Hole  Collar Location  Depth  Orient  Down‐hole Intercept (m)  Au g/t 

   mE  mN  mRl  (m)  Az/Dip  From  To  Length  Uncut 

MRGT006  756,661  964,406  374  251.8  121/‐61  0.00  174.00  174.00  0.34 

                6.00  38.85  32.85  1.03 

MDD063  756,437  964,743  386  503.8  127/‐58  283.30  471.00  187.70  0.80 

       283.30  300.00  16.70  1.30 

       316.80  337.65  20.85  0.49 

       366.55  400.10  33.55  1.58 

       406.00  447.00  41.00  1.15 

       456.45  471.00  14.55  0.70 

MDD065  756,415  964,390  376  341.7  126/‐56  150.00  318.00  168.00  0.24 

MDD066  756,480  964,592  380  440.7  125/‐57  206.95  437.00  230.05  0.93 

              219.00   324.00  105.00  1.10 

              342.00  362.00  20.00  0.81 

                400.75  437.00  36.25  1.74 

MDD067  756,512  964,203  369  260.8  125/‐55  86.00  260.80  174.80  0.39 

                182.00  260.80  78.80  0.51 

MDD068  756,585  964,640 380 426.1  127/‐57  130.20  371.25  241.05  0.77 

          142.00  253.00  111.00  1.04 

          298.00  330.00  32.00  0.86 

                349.00  371.25  22.25  0.65 

MDD069  756,430  964,628  382  530.8  128/‐58  229.00  530.80  301.80  0.60 

           229.00  306.15  77.15  0.80 

           325.00  402.00  77.00  0.80 

               442.00  494.00  52.00  0.52 

MDD070  756,558  964,352  374  317.7  126/‐56  53.00  297.00  244.00  0.23 

              53.00   72.75  19.75  0.64 

          90.00  110.95  20.95  0.43 

          275.00  301.00  26.00  0.40 

MDD071  756,360  964,431 375 410.7  127/‐58  254.00  360.25  106.25  0.29 

MDD072  756,380  964,661  383  542.8  127/‐58  304.00  516.00  212.00  0.65 

             333.00  353.00  20.00  0.82 

             392.00  433.00  41.00  0.62 

             445.00  458.00  13.00  0.71 

             466.00  516.00  50.00  1.23 

/g26/g4

/g4

/g4

MDD073  756,309  964,588  380  519.0  128/‐59  318.90  519.00  200.10  0.64 

             358.00  401.00  43.00  1.12 

             405.25  421.00  15.75  1.15 

             431.00  461.00  30.00  1.04 

                  472.00  491.00  19.00  0.72 

MDD074  756,373  964,545  379  489.1  127/‐58  254.00  447.00  193.00  0.66 

              276.00  361.00  85.00  0.68 

                  370.00  424.00  54.00  0.95 

MDD077  756,712  964,977  394  329.6  126/‐56  59.00  275.00  216.00  0.44 

              110.00  129.55  19.55  0.66 

              139.20  146.00  6.80  1.49 

              155.00  164.30  9.30  0.83 

              210.00  219.30  9.30  1.07 

              225.25  233.00  7.75  0.74 

MDD078  756,818  964,967  394  230.7  126/‐57  59.20  183.85  124.65  0.91 

              59.20  100.00  40.80  1.06 

                  108.65  142.00  33.35  1.01 

MDD080  757,275  965,921  379  95.7  123/‐54  41.00  82.00  41.00  0.40 

MDD081  757,223  965,835  375  119.7  127/‐56  6.00  27.00  21.00  0.44 

MDD082  757,279  965,794  372  45.8  126/‐56  No Significant Intercep t 

MDD083  757,236  965,710  368  45.8  125/‐55  No Significant Intercep t 

MDD084  757,121  965,557  374  75.8  126/‐56  33.50  59.00  25.50  1.15 

MDD085  757,030  965,364  378  60.9  125/‐56  3.00  34.00  31.00  0.61 

MDD086  756,992  965,392  377  101.8  124/‐57  74.00  98.00  24.00  0.78 

MDD087  756,870  964,991  392  182.6  127/‐56  16.00  32.00  16.00  0.65 

              57.25  68.00  10.75  0.74 

                  89.90  120.85  30.95  1.28 

MDD088  756,423  964,511  378  429.4  127/‐58  206.00  402.00  196.00  0.64 

               206.00  214.00  8.00  0.66 

                  348.80  402.00  53.20  1.01 

MDD089  756,247  964,632  383  600.0  129/‐58  382.00  576.00  194.00  0.52 

               382.00  426.00  44.00  1.23 

               430.00  469.00  39.00  0.49 

                  485.00  507.00  22.00  0.57 

MDD090  756,323  964,701  390  569.8  127/‐58  368.40  567.00  198.60  0.57 

               368.40  404.00  35.60  0.75 

               448.00  519.00  71.00  0.78 

                  539.00  567.00  28.00  0.55 

MDD092  756,389  964,837  393  551.8  129/‐59  321.00  525.00  204.00  0.72 

               431.00  473.00  42.00  1.69 

               485.00  495.00  10.00  1.16 

                  515.35  524.00  8.65  3.17 

/g27/g4

/g4

/g4

MDD093  756,861  964,700  380  302.6  129/‐57  0.00  181.10  181.10  0.78 

               0.00  22.00  22.00  0.85 

               39.00  78.00  39.00  0.59 

                  105.00  124.75  19.75  3.24 

MDD094  756,471  964,476  379  441.2  129/‐58  170.00  314.35  144.35  0.44 

               170.00  190.00  20.00  0.47 

                  209.00  245.35  36.35  0.73