Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MARI.TO ·

Marimaca Makes New Shallow Oxide Copper Discovery at Mercedes

Drill Results

News Release 

Marimaca Makes New Shallow Oxide Copper Discovery at Mercedes 

V a n c o u v e r ,  B r i t i s h  C o l u m b i a ,  S e p t e m b e r  8 ,  2 0 2 1  –  M a r i m a c a  C o p p er  Corp.  (“Marimaca  Copper”  or  the  “Company”)  

(TSX:  MARI)   is  pleased  to  announce  that  rev erse  circulation  (“RC”)  drillin g  completed  at  the  Mercedes  Target 

(“Mercedes”),  has  intersected  si gnificant  oxide  copper  minerali zation  from  surface,  with  an  initial  area  of  interest 

measuring 400m along strike and 300m width. A total of 17 holes were completed of which 12 intersected mineralization. 

Mercedes is located less than 1km to the north of the northern  edge of the Marimaca Oxide Deposit (“MOD”) and offers 

clear potential to add to the Company’s leachable resource base.  

Highlights 

 Broad zones of near surface oxide copper mineralization intersected in eight holes: 

o MER‐12 intersected 86m with an average grade of 0.44% CuT from 6m including 42m @ 0.64% CuT  

o MER‐16 intersected 48m with an average grade of 0.42% CuT from 20m including 20m @ 0.57% CuT 

o MER‐06 intersected:  

 74m with an average grade of 0.30% CuT from 18m including 46m @ 0.38% CuT; and 

 18m with an average grade of 0.52% CuT from 132m. 

o MER‐14 intersected 26m with an average grade of 0.42% CuT from 80m including 12m @ 0.69% CuT 

o MER‐03 intersected 58m with an average grade of 0.34% CuT as part of a broader 98m @ 0.30% CuT from 4m 

o MER‐04 intersected 36m with an averaged grade of 0.34% CuT as part of a broader 86m @ 0.26% CuT from 6m 

o MER‐17 intersected 50m with an average grade of 0.25% CuT from 2m 

o MER‐01 intersected 28m with an average grade of 0.21% CuT from 4m 

 Underground mapping of historical workings indicates continuous zones of higher‐grade mineralization than 

encountered in the first phase of drilling  

 The current drilled area of interest extends 400m along strike and 300m east‐west and remains open to south and 

east 

 Weak or thinner mineralization was intersected in MER‐02, 05, 09, 13, 15 and no significant mineralization 

intersected in holes MER‐07, 08, 10 and 11 

Sergio Rivera, VP Exploration of Marimaca Copper, commented: 

“We are very pleased with the results from the discovery drilli ng campaign at Mercedes, which has identified significant 

shallow  oxide  copper  mineralization  less  than  one  kilometre  awa y  from  the  flagship  Marimaca  oxide  deposit.  The 

mineralization consists of broad zones of predominantly green oxides, commencing at surface, with some mixed, enriched 

and copper wad sections. 

“The structural controls observed at Mercedes are very similar  to the MOD and we note that the higher‐grade materials 

appear to be spatially related to the presence of dacitic dykes , which become more prevalent to the east of the currently 

drilled area.  

“Mercedes remains open to the east and to the south, where it i s within 1km of the northern extent of the MOD. We are 

examining  whether  Mercedes  and  the  MOD  may  be  part  of  a  larger mineralizing  system  and  plan  further  exploration 

accordingly.” 

Hayden Locke, President and CEO, of Marimaca Copper, commented: 

“We have now drilled two conceptual exploration targets and ide ntified significant shallow, oxide, copper mineralization 

in both. We have several other targets close to the MOD that ha ve yet to be drilled, and we take great encouragement 

from  the  success  at  both  Cindy  and  Mercedes.  We  own  the  entire land  position,  which  we  believe  is  prospective  for 

Marimaca style mineralization, and this will allow any shallow  oxide discoveries to form part of our future development 

plans and add value to what is already a project with compelling economics.” 

Overview of Drilling Campaign Objectives and Results 

The initial drilling campaign at Mercedes (located less than 1km to the north of the northern edge of the MOD) consisted 

of nine shallow, RC drill holes  targeting the anomalies identif ied in both the magnetic sur vey and surface geochemical 

sampling  previously  completed (refer to announcements on 23 Sep tember 2020 and 17 February 202 1 respectively ). 

Based on the results of the first nine holes, the program was e xtended to seventeen holes across approximately 700m of 

north‐south strike. The objective was to identify new, broad zones of shallow oxide mineralization that could complement 

the existing resources at the MOD. 

Figure 1: Plan view of Selected Drill Holes at Mercedes 

The  seventeen  holes  were  drilled  at  various  orientations  over  an  area  of  approximately  700m  by  300m,  and  eight 

encountered notable oxide copper mineralization. Drill holes MER‐03, MER‐04, MER‐06, MER‐12, MER‐16 and MER‐17 in 

particular, intersected broad zones (approximately 50m downhole  or more) of oxide copper mineralization commencing 

near surface. These drill holes define an approximate area of i nterest for follow up drilling  extending 400m north‐south 

and 300m east‐west.  

MER‐12, located on the northern  limb of the area of interest, w as an especially positive drill hole, intersecting 86m with 

a n  a v e r a g e  g r a d e  o f  0 . 4 4 %  C u T  f r o m  6 m ,  i n c l u d i n g  a  h i g h e r ‐ g r a d e z o n e  o f  4 2 m  a t  0 . 6 4 %  C u T .  A s  a t  t h e  M O D ,  t h i s  

mineralization  is  structurally  controlled  by  pervasive  east  dipping  fractures  in  the  host  monzodiorite  and  consists  of 

dominant atacamite‐brochantite and chrysocolla with increasing copper wad material in the deeper intersections. 

I n  a d d i t i o n  t o  d r i l l i n g ,  t h e  C o m p a n y  h a s  c o m p l e t e d  e x t e n s i v e  m apping  and  sampling  of  th e  small  scale  historical 

underground  workings  at  Mercedes.  The  results  from  this  work  high li g hts  th e  e x te ns iv e  and  c o nt inu ou s  n atu re  of  th e  

mineralization with broad zones of copper oxide. The underground workings were sampled continuously over 434m with 

an average grade of 0.49% CuT over this length and encompassing  several higher‐grade zones, including 66m at 0.80% 

C u T ,  6 0 m  a t  0 . 7 0 %  C u T ,  a n d  2 0 m  at  1 . 5 5 %  C u T .  T h e  c o p p e r  m i n e r a ls  we r e  the  s ame  as  t hos e  ob s e r ve d i n  the  dr il lin g  

program. 

Figure 2: Plan view of Mercedes and Selected Results of Underground Mapping and Channel Sampling 

Mercedes  is  structurally  controlled  by  a  pervasive  sheeted  fracturing  of  the  intrusive  host,  which  dips  to  the  east  at 

between 45 and 60 degrees. Similar to the MOD, there is zonation of mineralization trending from more dominant green 

oxides at the top of the intersections to more mixed and copper wad types at the peripheries and towards the bottom of 

the intersections. 

Figure 3: Cross Section EW 7,437,725 (Drill holes MER‐12 and MER‐14) 

Figure 4: Cross Section EW 7,437,600 (Drill holes MER‐12 and MER‐14) 

Overview of Mercedes 

Mercedes is located less than 1km from the northern edge of the MOD. It was identified initially through the results of the 

high‐resolution  drone‐mounted  magnetic  survey  (refer  to  release  on  23  September  2020) ,  w h i c h  w a s  f o l l o w e d  u p  b y  

reconnaissance mapping and geochemical sampling (refer to release on 9 December 2020). 

Mercedes is hosted in the same intrusive units as the MOD, which shows pervasive fracturing striking north to south with 

an easterly dip of between 45 and 60 degrees. The unit is cross‐cut by various dykes and faults, all of which are important 

for the development of copper mineralization. 

Mercedes is the second of three new exploration targets drilled by the Company within a radius of 5km around the MOD, 

each of which presents a compelling opportunity to add shallow, oxide resources to the MOD project. 

Figure 5: Map of MOD Resource and Near MOD Exploration Targets  

Summary of Mercedes Drilling Results 

HOLE  EAST  NORTH  AZIMUTH  DIP  DEPTH 

(m)  Intersections 

MER‐

01 

7,437,463  

374,798   270  ‐60  300 

28m @ 0.21% CuT from 4m; and 

10m @ 0.23% CuT from 92m; and 

6m @ 1.18% CuT from 130m 

MER‐

02 

7,437,458  

374,800   220  ‐60  300 

16m @ 0.15% CuT from 6m; and 

12m @ 0.43% CuT from 30m; and 

10m @ 0.28% CuT from 150m 

MER‐

03 

7,437,603  

374,657   270  ‐60  300 

94m @ 0.30% CuT from 4m including 58m @ 0.34% CuT; and 

10m @ 0.37% CuT from 118m; and 

20m @ 0.33% CuT from 140m; and 

20m @ 0.31% CuT from 270m 

MER‐

04 

7,437,601  

374,661   220  ‐60  300  86m @ 0.26% CuT from 6m including 36m @ 0.34% CuT 

MER‐

05 

7,437,609  

374,595   270  ‐60  250 

6m @ 0.81% CuT from 40m; and 

16m @ 0.27% CuT from 98m; and 

12m @ 0.44% CuT from 140m; and 

12m @ 0.31% CuT from 224m 

MER‐

06 

7,437,606  

374,737   270  ‐60  300 

74m @ 0.30% CuT from 18m including 46m @ 0.38% CuT; and 

10m @ 0.26% CuT from 100m; and 

48m @ 0.26% CuT from 132m including 18m @ 0.52% CuT; and 

24m @ 0.13% CuT from 202m 

MER‐

07 

7,437,802  

374,493   270  ‐60  200  NSI 

MER‐

08 

7,437,914  

374,558   270  ‐60  250  NSI 

MER‐

09 

7,438,050  

374,659   270  ‐60  200 

6m @ 0.31% CuT from 92m; and 

24m @ 0.17% CuT from 126m 

MER‐

10  7,438,052  374,799  270  ‐60  250  NSI 

MER‐

11  7,437,877  374,618  270  ‐60  250  NSI 

MER‐

12  7,437,738  374,648  270  ‐60  270 

86m @ 0.44% CuT from 6m including 42m @ 0.64% CuT; and 

16m @ 0.27% CuT from 122m; and 

20m @ 0.22% CuT from 238m 

MER‐

13  7,437,857  374,719  270  ‐60  200  6m @ 0.33% CuT from 70m 

MER‐

14  7,437,724  374,724  270  ‐60  250  26m @ 0.42% CuT from 80m including 12m @ 0.69% CuT; and 

8m @ 0.36% CuT from 212m 

MER‐

15  7,437,717  374,720  220  ‐60  250 

12m @ 0.19% CuT from 2m; and 

18m @ 0.31% CuT from 46m; and 

6m @ 0.45% CuT from 74m; and 

12m @ 0.24% CuT from 118m 

MER‐

16  7,437,540  374,643  270  ‐60  250 

48m @ 0.42% CuT from 20m including 20m @ 0.57% CuT; and 

12m @ 0.30% CuT from 76m; and 

20m @ 0.14% CuT from 90m; and 

12m @ 0.15% CuT from 158m; and 

8m @ 0.15% CuT from 194m 

MER‐

17  7,437,422  374,816  220  ‐60  250 

50m @ 0.25% CuT from 2m; and 

6m @ 0.44% CuT from 144m; and 

8m @ 0.19% CuT from 176m 

Sampling and Assay Protocol 

True widths cannot be determined with the information available at this time. RC holes were sampled on a 2m continuous 

basis, with dry samples riffle sp lit on site and one quarter se nt to the Andes Analytical Assa y preparation laboratory in 

Calama and the pulps then sent to the same company laboratory in Santiago for assaying. A second quarter was stored on 

site  for  reference.  Samples  were  prepared  using  the  following  standard  protocol:  drying;  crushing  to  better  than  85% 

passing ‐10#; homogenizing; splitting; pulverizing a 500‐700g subsample to 95% passing ‐150#; and a 125g split of this sent 

for  assaying.  All  samples  were  assayed  for  %CuT  (total  copper) and  %CuS  (acid  soluble  copper)  by  AAS.  A  full  QA/QC 

program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results. Pulps 

and sample rejects are stored by Marimaca Copper for future reference. 

Qualified Person 

The technical information in this news release, including the information that relates to geology, drilling and mineralization  

was prepared under the supervision of, or has been reviewed by  Sergio Rivera, Vice Presiden t of Exploration, Marimaca 

Copper Corp, a geologist with more than 36 years of experience and a member of the Colegio de Geólogos de Chile and of 

the Institute of Mining Engineers of Chile, and who is the Qual ified Person for the purposes of NI 43‐101 responsible for 

the design and execution of the drilling program.  

T h e  Q P  c o n f i r m s  h e  h a s  v i s i t e d  t h e  p r o j e c t  a r e a ,  h a s  r e v i e w e d  relevant  project  information,  is  responsible  for  the 

information contained in this news release, and consents to its publication. 

Contact Information 

For further information please visit www.marimaca.com or contact: 

Tavistock  

+44 (0) 207 920 3150 

Jos Simson/Oliver Lamb / Nick Elwes 

[email protected] 

Forward Looking Statements 

This news release includes certa in “forward‐looking statements”  under applicable Canadian se curities legislation. There 

can  be  no  assurance  that  such  statements  will  prove  to  be  accurate,  and  actual  results  and future  events  could  differ 

materially  from  those  anticipated  in  such  statements.  Forward‐looking  statements  reflect  the  beliefs,  opinions  and 

projections on the date the statements are made and are based upon a number of assumptions and estimates that, while 

considered reasonable by Marimaca Copper, are inherently subject to significant business, economic, competitive, political 

and  social  uncertainties  and  conti ngencies.  Many  factors,  both  known  and  unknown,  could   cause  actual  results, 

performance or achievements to be materially different from the  results, performance or achievements that are or may 

be expressed or implied by such forward‐looking statements and the parties have made assumptions and estimates based 

on or related to many of these factors. Such factors include, w ithout limitation: risks related to share price and market 

conditions, the inherent risks involved in the mining, exploration and development of mineral properties, the uncertainties 

involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project delays 

o r  c o s t  o v e r r u n s  o r  u n a n t i c i p a t e d  e x c e s s i v e  o p e r a t i n g  c o s t s  a n d  expenses,  uncertainties  related  to  the  necessity  of 

financing, the availability of and costs of financing needed in  the future as well as those factors disclosed in the annual 

information form of the Company dated March 29, 2021, the final  short form base prospectus and other filings made by 

the Company with the Canadian securities regulatory authorities (which may be viewed at www.sedar.com). Accordingly, 

readers should not place undue reliance on forward‐looking stat ements. Marimaca Copper undertakes no obligation to 

update  publicly  or  otherwise  revise  any  forward‐looking  stateme nts  contained  herein  whether  as  a  result  of  new 

information or future events or otherwise, except as may be required by law. 

Neither  the  Toronto  Stock  Exchange  nor  the  Investment  Industry  Regulatory  Organization  of  Canada  accepts 

responsibility for the adequacy or accuracy of this release.