Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MARI.TO ·

Marimaca Extends Strike Potential at Cindy

Drill Results

News Release

Marimaca Extends Strike Potential at Cindy

Vancouver, British Columbia, July 14, 202 1 – Marimaca Copper Corp. (“Marimaca Copper” or the “Company”)

(TSX: MARI) is pleased to announce that drilling results from the remaining reverse circulation (“RC”) drill holes, completed

at the Cindy Target (“Cindy”), have intersected significant copper mineralization, extending the strike length to over 800m.

Cindy is located less than 5km to the north of the Marimaca Oxide Deposit (“MOD”) and offers potential to add to the

Company’s leachable resource base and extend mine life or increase the scale of future operations.

Highlights

• Mineralized structures now identified over 800 meters of strike

• Broad zones of enriched and primary copper mineralization intersected in two new holes:

o CIR-08 intersected 42m with an average grade of 0.46% CuT as part of a broader 100m @ 0.3% CuT from 128m

o CIR-09 intersected 46m with an average grade of 0.29% CuT as part of a broader 122m @ 0.23% CuT from 218m

• These results extend the strike of the mineralization identified in previously reported holes:

o CIR-03 intersected 42m with an average grade of 0.51% CuT as part of a broader 70m @ 0.39% CuT from 24m

o CIR-02 intersected 20m with an average grade of 0.33% CuT as part of a broader 124m @ 0.22% CuT from 8m

• Intersections in CIR-08 and CIR-09 are deeper and show the consistent, quite broad, easterly dipping structural

controls to mineralization observed in holes CIR-02 and CIR-03

o Indicates potential for up dip oxide mineralization further to the west from CIR-08 and CIR-09

• Updated regional magnetics indicates potential for extensions of oxide structures to the north of Cindy, at Mititus

• No significant mineralization intersected in holes CIR-04, -05, -06 and -07

Sergio Rivera, VP Exploration of Marimaca Copper, commented:

“We have now identified over 800m of strike of a relatively continuous, broad zone of copper mineralization, which extends

from surface, in the northern oxide holes (CIR-02 and CIR-03), down to a depth of 330m downhole in hole CIR-09, which is

located towards the southern end of the area of interest and predominantly intersected chalcopyrite.

“The intersections in CIR -08 and 09 are deeper and accordingly have increased amounts of primary mineralization , but

when considered in context of the east dipping structures, would indicate potential for oxide mineralization closer to

surface, up dip on the structures to the west.

“We have also extended our magnetic survey, which has indicated a large anomaly directly to t he north of Cindy and we

are investigating the potential for extensions of the mineralized zone and structures into this area. If successful, this could

meaningfully increase the strike length of Cindy.

“We are currently awaiting assay results from Mercede s and are preparing infrastructure and drill pads for the Roble

Target, where we will commence drilling imminently.”

Hayden Locke, President and CEO, of Marimaca Copper, commented:

“These results should be considered in context of the broader MOD development. The intersections are above the economic

cut-off grade established in our 4th August 2020 Preliminary Economic Assessment (“PEA”), using a $3/lb copper price, and

are within 5km of the MOD project. As a result, we continue to see strong potential for mine life extension or scale increase

for the MOD with ongoing work at the Cindy Target.”

Overview of Drilling Campaign Objectives and Results

The initial drilling campaign at Cindy (located less than 5km to the north of the MOD) consisted of nine, shallow, RC drill

holes targeting the anomalies identified in both the magnetic survey and surface geochemical sampling previously

completed (refer to announcements on 23 September 2020 an d 17 February 2021 respectively ). The objective was to

identify new, broad zones, of shallow oxide mineralization that could complement the existing resources at the MOD, and

potential deeper sulphide bearing structures which could indicate a more extensive copper system. Results from holes

CIR-01, CIR-02 and CIR-03 were released on June 15th, 2021.

The nine holes were drilled on approximately 250m section lines to the north and south of the historical underground

workings at Cindy, extending over roughly 1.2km of strike. Two sections, located in the northern part of Cindy, each

consisted of two drill holes, and tested the interpreted broadening of the various structures, which are believed to be key

controls of mineralization at Cindy.

The first three drill holes intersected broad zones of copper mineralization over a step-out strike of roughly 800 meters.

Drill holes CIR -03 and CIR-02 intersected broad zones of mixed copper oxide material from near surface including 40m

with an average grade of 0.51% CuT from 48m downhole and 20m with an average grade of 0.33% CuT from 8m downhole,

respectively.

Figure 1: Plan view of Selected Drill Holes at Cindy

Drill holes CIR -08 and CIR -09 both also intersected broad zones of copper mineralization, interpreted to be the same

easterly dipping geological structures observed in CIR-01, CIR-02 and CIR-03, giving a total strike of 800m.

CIR-08 was a step out approximately 200 meters to the north of CIR -01 and 400m to the south of CIR -02. It intersected

100m of copper mineralization with an average grade of 0.3% CuT from 128m downhole. This included a higher -grade

zone of 42m with an average grade of 0.46% CuT. The mineralization was dominantly enriched in the top part of the

intersection transitioning to dominantly chalcopyrite at the bottom.

Figure 2: Cross Section - CIR-08

CIR-09 stepped out approximately 200m to the north of CIR-08. Again, it intersected broad zones of copper mineralization

including 122m with an average grade of 0.23% CuT from 218m downhole. Mineralization was dominantly chalcopyrite

with some minor mixed and green oxides.

Figure 3: Cross Section - CIR-09

The depth of the intersection, and the nature of the mineralization observed in the drill holes, indicates it corresponds

with a lower section of the easterly dipping structures which are the controls of mineralization at C indy. Based on this

interpretation, the Company believes that there remains strong potential for up dip extensions with a higher proportion

of leachable oxide mineralization.

The Cindy drilling has identified an easterly dipping structure with a continuous strike of around 800m with broad and

consistent zones of mineralization. Drill holes located further to the west (e.g. CIR -02 and CIR-03) have intersected near

surface zones of oxide mineralization. Those holes located further to the east (e.g. CIR -01, CIR-08 and CIR -09) have hit

mixed, enriched and primary mineralization at greater depth, indicating good continuity of mineralizing structures across

the target area.

Figure 4: Long Section of Cindy Including Mineral Domains

Potential Extensions to the North

The Company has extended the drone mounted, high resolution, magnetics survey to the areas directly to the north of

Cindy, which has identified several interesting magnetic anomalies which appear to be closely related with the regio nal

Naguayán Fault System.

The Mititus Target is coincident with one of the anomalies identified and is located less than 500m to the north of Cindy

and may represent its northern continuation. Marimaca Copper will continue to assess the Mititus Target and its potential

to add additional strike to Cindy with ongoing work.

Figure 5: Extended High Resolution Magnetic Surveys and Mititus Target

Summary of Cindy Drilling Results

HOLE EAST NORTH AZIMUTH DIP DEPTH

(m) Intersections

CIR-

01

7,439,204

374,939 270 -60 350 76m @ 0.15% CuT from 100m

CIR-

02

7,439,749

374,854 270 -60 300 124m @ 0.22% CuT from 8m including 20m @ 0.33% CuT from 8m; and

36m @ 0.22% from 182m

CIR-

03

7,439,957

374,890 270 -60 270 70m @ 0.39% CuT from 24m including 42m @ 0.51% CuT from 48m; and

36m @ 0.43% CuT from 154m including 18m @ 0.73% CuT from 158m

CIR-

04

7,439,949

375,146 270 -60 250 18m @ 0.15% CuT from 78m

CIR-

05

7,439,762

375,066 270 -60 300 NSI

CIR-

06

7,439,006

374,946 270 -60 250 NSI

CIR-

07

7,438,805

374,862 270 -60 250 10m @ 0.29% CuT from 74m

16m @ 0.45% CuT from 210m

CIR-

08

7,439,399

374,965 270 -60 370

100m @ 0.3% CuT from 128m including 42m @ 0.46% CuT from 128m; and

64m @ 0.39% CuT from 292m including 38m @ 0.55% CuT from 318m, including

16m @ 1.08% CuT from 334m

CIR-

09

7,439,558

374,975 270 -60 350 122m @ 0.23% CuT from 218m including 46m @ 0.29% CuT from 218m;

Sampling and Assay Protocol

True widths cannot be determined with the information available at this time. RC holes were sampled on a 2m continuous

basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assay preparation laboratory in

Calama and the pulps then sent to the same company laboratory in Santiago for assaying. A second quarter was stored on

site for reference. Samples were prepared using the following standard protocol: drying; crushing to better than 85%

passing -10#; homogenizing; splitting; pulverizing a 500-700g subsample to 95% passing -150#; and a 125g split of this sent

for assaying. All samples were assayed for %CuT (total copper) and %CuS (acid soluble copper) by AAS. A full QA/QC

program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results. Pulps

and sample rejects are stored by Marimaca Copper for future reference.

Qualified Person

The technical information in this news release, including the information that relates to geology, drilling and mineralization

was prepared under the supervision of, or has been reviewed by Sergio Rivera, Vice President of Exploration, Marimaca

Copper Corp, a geologist with more than 36 years of experience and a member of the Colegio de Geólogos de Chile and of

the Institute of Mining Engineers of Chile, and who is the Qualified Person for the purposes of NI 43 -101 responsible for

the design and execution of the drilling program.

The QP confirm s he has visited the project area, has reviewed relevant project information, is responsible for the

information contained in this news release, and consents to its publication.

Contact Information

For further information please visit www.marimaca.com or contact:

Tavistock

+44 (0) 207 920 3150

Jos Simson/Oliver Lamb / Nick Elwes

[email protected]

Forward Looking Statements

This news release includes certain “forward -looking statements” under applicable Canadian securities legislation. There

can be no assurance that such statements will prove to be accurate, and actual results and future events could differ

materially from th ose anticipated in such statements. Forward -looking statements reflect the beliefs, opinions and

projections on the date the statements are made and are based upon a number of assumptions and estimates that, while

considered reasonable by Marimaca Copper, are inherently subject to significant business, economic, competitive, political

and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results,

performance or achievements to be materially different from the r esults, performance or achievements that are or may

be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based

on or related to many of these factors. Such factors include, without limitation: risks related to share price and market

conditions, the inherent risks involved in the mining, exploration and development of mineral properties, the uncertainties

involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project delays

or cost overruns or unanticipated excessive operating costs and expenses, uncertainties related to the necessity of

financing, the availability of and costs of financing needed in the future as well as those factors disclose d in the annual

information form of the Company dated March 29, 2021, the final short form base prospectus and other filings made by

the Company with the Canadian securities regulatory authorities (which may be viewed at www.sedar.com). Accordingly,

readers should not place undue reliance on forward -looking statements. Marimaca Copper undertakes no obligation to

update publicly or otherwise revise any forward -looking statements contained herein whether as a result of new

information or future events or otherwise, except as may be required by law.

Neither the Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts

responsibility for the adequacy or accuracy of this release.