Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MARI.TO ·

Marimaca Exploration Update: La Atómica Drill Results Confirm Copper Oxide Mineralisation Beyond Marimaca 1-23

Drill Results Exploration Programs

Marimaca Exploration Update: La Atómica Drill Results Confirm Copper Oxide

Mineralisation Beyond Marimaca 1-23

VANCOUVER, British Columbia, Nov. 13, 2018 -- Coro Mining Corp. (“Coro” or the “Company”) (TSX: COP) is pleased

to provide an update for Company’s Marimaca project in the Antofagasta region of Chile.  The first 28 of a planned 52 drill holes

at La Atómica, the ground adjacent to the Marimaca 1-23 claim where a resource has already been established, have

confirmed the presence of copper oxide mineralization, in addition to the presence of secondary enriched copper sulphide

mineralization at depth.

Highlights

• Completed 28 of planned 52 holes, for 6,540 metres covering a 100 x 100 metre spaced grid. across the property.

• Results include:

• LAR 24

From surface, 202 metres continuous oxide mineralization averaging 0.74% CuT,

including 16 metres, from 98 to 114 metres, averaging 2.72% CuT,

and 12 metres, from 138 to 150 metres, at 2.24% CuT

• LAR-33

From 32 to 260 metres, 228 metres of continuous oxide mineralization averaging 0.47%CuT,

including 26 metres, from 60 to 86 metres, averaging 0.99% CuT.

and 20 metres, from 270 to 290 metres, high-grade secondary copper sulphide mineralization averaging 2.10%

CuT

• Oxide copper mineralization at La Atómica proven to exist 300 metres beyond limits of the previous drill grid completed

at Marimaca 1-23.

• Current knowledge is that the total horizontal extension of the outcropping copper oxide mineralization from Marimaca

to La Atómica now reaches 800 metres in the north-west direction, with the opportunity for further extension.

Commenting on the news, Luis Tondo, CEO of Coro said: “ Chile is the world’s primary source of mineable copper, however,

new near surface discoveries are becoming harder to find and new projects harder to bring on stream.  Since we discovered

Marimaca in 2016, the project continues to prove itself, and I believe has the potential to be one of the best new open-pittable

copper oxide deposits discovered in Chile in recent times. Our Phase I program already established a resource at Marimaca

and I am delighted to see that the current Phase II program confirms the potential of mineralization extension on the adjacent

La Atómica ground.”

Further Information

Copper oxide mineralization at La Atómica is hosted by the same intrusive rocks as identified at the Marimaca 1-23 claims. 

Parallel fracturing is minor as compared with Marimaca, and mineralization is controlled by a north-west system of faults and

by a north to north-east oriented dike-swarm of dioritic composition.

Part of the mineralization appears to be the result of copper laterally transported from sources located close to Marimaca

towards the west, along north-west fractures, and trapped by north to north-east fractures and dikes.  As a result, the

outcropping copper oxide blanket at La Atómica extends for widths of up to 300 metres reaching depths of up to 200 metres,

showing less mineralization intensity towards the north-west, yet remains open to the south-west portion of the property.

Figure 1 below illustrates the location of the completed drill holes at Atahualpa and La Atómica and the Phase I drilling which

established the resource and the new Phase II drilling extending to the north-west where copper oxide mineralization has been

established.

Figure 1: http://www.globenewswire.com/NewsRoom/AttachmentNg/0082865d-ec55-4bca-80fd-0c3c60a5d863

The photographs in figures 2 and 3 below show the southern outlook and RC drilling at La Atómica from which can be seen

access roads and some drilling, and importantly, parallel and north west fracturing which is believed to control the copper

oxide mineralization.

Figure 2: http://www.globenewswire.com/NewsRoom/AttachmentNg/673395ca-2705-4eaa-98bb-0d58830d35a9

Figure 3: http://www.globenewswire.com/NewsRoom/AttachmentNg/062cfd7d-eefc-41b8-b7b1-814585d94c12

Also commenting on the news, Sergio Rivera, VP Exploration said: “The drill results at La Atómica are the first from the new

program and already demonstrate the presence from surface of oxide mineralization and indeed the presence at depth of

some secondary sulphide mineralization.  We will now continue with the remaining drill holes at La Atómica before moving all

drill rigs to Atahualpa where I am hopeful that we will see similar or even potentially better positive results.”

Phase II Program Upcoming Milestones

It is planned that the remaining holes to be drilled at La Atómica will be completed with results announced by the end of the

fourth quarter 2018.

Sampling and Assay Protocol

True widths cannot be determined with the information available at this time. Coro RC holes were sampled on a 2 metre

continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assay preparation

laboratory in Calama and the pulps then sent to the same company’s laboratory in Santiago for assaying. A second quarter

was stored on site for reference. Samples were prepared using the following standard protocol: drying; crushing to better than

85% passing -10#; homogenizing; splitting; pulverizing a 500-700g subsample to 95% passing -150#; and a 125g split of this

sent for assaying. All samples were assayed for CuT (total copper), CuS (acid soluble copper), CuCN (cyanide soluble copper)

by AAS and for acid consumption. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates

was employed with acceptable results. Pulps and sample rejects are stored by Coro for future reference.

La Atómica Intersections

Hole Total Depth (m)   From (m) To (m) Interval (m) %CuT Type

LAR-15 250

  48 104 56 0.45 Oxide

including

48 70 22 0.46 Oxide

82 104 22 0.61 Oxide

and 120 152 32 0.35 Oxide

LAR-16 250

  50 150 100 0.27 Oxide

including 112 150 38 0.35 Oxide

note 126 134 8   Underground working

LAR-17 180

  0 92 92 0.39 Oxide

including

42 58 16 0.75 Oxide

72 92 20 0.75 Oxide

LAR-18 230

  0 86 86 0.46 Oxide

including 40 86 46 0.59 Oxide

note

36 40 4   Underground working

48 52 4   Underground working

LAR-19 180

  0 74 74 0.33 Oxide

including

12 44 32 0.50 Oxide

50 74 24 0.26 Oxide

LAR-20 200

  6 80 74 0.31 Oxide

including

12 38 26 0.52 Oxide

46 62 16 0.24 Oxide

note 38 46 8   Underground working

LAR-21 150 No significant results

LAR-22 150 No significant results

LAR-23 400

  62 124 62 0.37 Oxide

including

0 14 14 0.40 Oxide

70 106 36 0.45 Oxide

and

146 174 28 0.21 Oxide

218 308 90 0.48 Enriched-primary

including

252 258 6 1.65 Enriched

256 272 16 0.40 Primary

272 280 8 1.10 Enriched

288 298 10 0.52 Enriched

304 308 4 1.30 Enriched

and

308 330 22 0.52 Oxide

332 356 24 0.35 Enriched

364 398 34 0.51 Enriched

including

364 372 8 0.51 Enriched

378 398 20 0.65 Enriched

LAR-24 250

  0 202 202 0.74 Oxide

including

88 94 6 1.21 Oxide

98 114 16 2.72 Oxide

118 134 16 1.00 Oxide

138 150 12 2.24 Oxide

162 174 12 1.52 Oxide

and 238 248 10 0.61 Enriched

LAR-25 250

  12 158 146 0.33 Oxide

including 114 122 8 1.96 Oxide

and 220 242 22 1.43 Oxide

LAR-26 250

  72 88 16 0.34 Oxide

and

100 146 46 0.31 Oxide

182 188 6 0.55 Oxide

LAR-27 180

  84 90 6 0.30 Oxide

and 116 134 18 0.30 Oxide

LAR-28 200 No significant results

LAR-29 200

  74 86 12 0.57 Oxide

and

102 118 16 0.23 Oxide

118 132 14 0.68 Enriched

168 176 8 0.30 Oxide

LAR-30 150   56 62 6 0.56 Oxide

LAR-31 150

  66 78 12 0.31 Oxide

and 122 138 16 0.27 Oxide

LAR-32 350

  96 122 26 0.45 Oxide

including

26 36 10 0.75 Oxide

60 86 26 0.99 Oxide

104 118 14 0.70 Oxide

  132 168 36 0.21 Oxide

including 152 160 8 `0.39 Oxide

  190 238 48 0.20 Oxide

including

200 208 8 0.41 Oxide

218 224 6 0.57 Oxide

and

262 294 32 0.36 Oxide

300 308 8 0.91 Oxide

308 314 6 0.46 Mixed

LAR-33 350

  32 260 228 0.47 Oxide

including

132 144 12 0.49 Oxide

172 182 10 0.91 Oxide

190 210 20 1.83 Oxide

134 150 16 1.20 Oxide

and

260 270 10 1.40 Mixed

270 290 20 2.10 Enriched

322 328 6 0.40 Enriched

336 348 12 0.26 Primary

LAR-34 350

  26 182 156 0.21 Oxide

including

50 84 34 0.28 Oxide

92 182 90 0.22 Oxide

and

200 226 26 0.32 Oxide

230 240 10 0.58 Oxide

LAR-35 210

  2 44 42 0.26 Oxide

and 56 86 30 0.42 Oxide

LAR-36 200

  12 182 170 0.34 Oxide

including

12 44 32 0.26 Oxide

56 96 40 0.45 Oxide

96 108 12 0.81 Oxide

108 122 14 0.25 Oxide

132 182 50 0.26 Oxide

LAR-37 150 No significant results

LAR-38 150

  20 32 12 0.26 Oxide

and 62 82 20 0.25 Oxide

  2 16 14 0.27 Oxide

and

40 50 10 0.45 Oxide

56 64 8 0.47 Oxide

  82 126 44 0.35 Oxide

82 96 14 0.62 Oxide

LAR-39 150 including 100 126 26 0.24 Oxide

LAR-40 300

  0 16 16 0.29 Oxide

and

134 142 8 0.44 Oxide

180 192 12 0.21 Oxide

226 252 26 0.25 Oxide

272 276 4 0.38 Mixed

LAR-41 350

  2 14 12 0.31 Oxide

and 80 186 106 0.23 Oxide

including 116 132 16 0.58 Oxide

LAR-42 270

  28 42 14 0.26 Oxide

and

154 166 12 0.25 Oxide

222 228 6 0.53 Mixed

La Atómica Drill Collars

Hole Easting Northing Elevation Azimuth Inclination Depth

LAR-15 374839.0 7435824.7 1068.0 220 -60 250

LAR-16 374834.5 7435830.8 1067.4 310 -60 250

LAR-17 374771.5 7435958.5 999.5 220 -60 180

LAR-18 374762.1 7435962.1 998.9 310 -60 230

LAR-19 374715.2 7435959.6 996.8 220 -60 180

LAR-20 374712.4 7435965.7 996.3 310 -60 200

LAR-21 374651.9 7436032.9 962.3 220 -60 150

LAR-22 374648.9 7436032.3 962.2 310 -60 150

LAR-23 374864.6 7435723.9 1104.1 220 -60 400

LAR-24 374861.7 7435731.4 1103.8 310 -60 250

LAR-25 374765.2 7435781.1 1076.2 220 -60 250

LAR-26 374764.0 7435786.9 1076.2 310 -60 250

LAR-27 374633.0 7435872.6 1011.0 220 -60 180

LAR-28 374626.4 7435879.2 1010.7 310 -60 200

LAR-29 374580.7 7435928.6 976.8 220 -60 200

LAR-30 374580.9 7435933.8 976.7 310 -60 150

LAR-31 374577.6 7435929.9 976.9 265 -60 150

LAR-32 374782.6 7435647.0 1118.9 220 -60 350

LAR-33 374778.9 7435650.8 1118.8 310 -60 350

LAR-34 374781.0 7435650.1 1119.0 265 -60 350

LAR-35 374583.3 7435799.1 1019.2 220 -60 210

LAR-36 374581.7 7435804.1 1019.0 310 -60 200

LAR-37 374498.8 7435864.1 974.6 220 -60 150

LAR-38 374496.3 7435867.7 974.4 310 -60 150

LAR-39 374577.9 7435877.9 1010.1 265 -60 150

LAR-40 374759.7 7435535.1 1100.3 265 -60 300

LAR-41 374755.7 7435539.9 1099.9 310 -60 350

LAR-42 374702.0 7435589.7 1090.0 220 -60 270

Qualified Persons

The technical information in this news release, including the information that relates to geology, drilling and mineralization of

the Marimaca Phase I and II exploration program was prepared under the supervision of, or has been reviewed by Sergio

Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 36 years of experience and a member of

the Colegio de Geologos de Chile and of the Institute of Mining Engineers of Chile, and who is the Qualified Person for the

purposes of NI 43-101 responsible for the design and execution of the drilling program.

Contact Information

For further information please visit www.coromining.com or contact:

Nicholas Bias, VP Corporate Development & Investor Relations

Office:   +56 2 2431 7601

Cell:       +44 (0)7771 450 679

Email:   [email protected]

Forward Looking Statements

This news release includes certain “forward-looking statements” under applicable Canadian securities legislation.  These

statements relate to future events or the Company’s future performance, business prospects or opportunities. Forward-looking

statements include, but are not limited to, statements regarding the future development and exploration potential of the

Marimaca Project. Actual future results may differ materially. There can be no assurance that such statements will prove to be

accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-

looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a

number of assumptions and estimates that, while considered reasonable by Coro, are inherently subject to significant

business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and

unknown, could cause actual results, performance or achievements to be materially different from the results, performance or

achievements that are or may be expressed or implied by such forward-looking statements and the parties have made

assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the inherent

risks involved in the mining, exploration and development of mineral properties, the uncertainties involved in interpreting drilling

results and other geological data, fluctuating metal prices, the possibility of project delays or cost overruns or unanticipated

excessive operating costs and expenses, uncertainties related to the necessity of financing, the availability of and costs of

financing needed in the future as well as those factors disclosed in the Company’s documents filed from time to time with the

securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova

Scotia, Prince Edward Island and Newfoundland and Labrador. Accordingly, readers should not place undue reliance on

forward-looking statements. Coro undertakes no obligation to update publicly or otherwise revise any forward-looking

statements contained herein whether as a result of new information or future events or otherwise, except as may be required

by law.