Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MARI.TO ·

Marimaca Announces Significant Increase in Mineral Resources at the Marimaca Copper Project 98% increase in M&I Resource tonnes to 140Mt at 0.48% CuT for 665.5kt of Contained Copper 92% growth in Inferred Resource tonnes to 83Mt at 0.39% CuT for 322.9kt of Contained Copper

Resource Estimates

News Release 

Marimaca Announces Significant Increase in Mineral Resources at the Marimaca Copper 

Project 

98% increase in M&I Resource tonnes to 140Mt at 0.48% CuT for 665.5kt of Contained Copper  

92% growth in Inferred Resource tonnes to 83Mt at 0.39% CuT for 322.9kt of Contained Copper 

Marimaca Confirmed as One of the Largest Copper Discoveries in the Last Decade(2) 

Vancouver,  British  Columbia,  October  13,  2022  –  Marimaca  Copper  Corp.  (“Marimaca  Copper”  or  the  “Company”)  

(TSX:  MARI)  is  pleased  to  announce  an  updated  Mineral  Resource  Estimate  (“MRE”)  for  the  Marimaca  Oxide  Deposit  (the 

“MOD” or the “Project”) located in the Antofagasta region of northern Chile. The 2022 MRE demonstrates significant resource 

growth over the 2019 MRE and marks an important step‐change in the scale of the Project, supporting a potential production 

rate higher than proposed in the Preliminary Economic Assessment (“PEA”).  

The 2022 MRE incorporates 19,580m of ~41,500m of drilling (reverse circulation (“RC”) + diamond) completed in 2022 for a 

total of over 110,000m of drilling completed since 2016. The balance of the 2022 infill drilling program, totalling approximately 

28,000m, will be included in a subsequent MRE planned for early 2023 with the objective of converting the remaining Inferred 

Resources to the Measured and Indicated Categories to underpin the Definitive Feasibility Study (“DFS”) planned for 2023. 

The 2022 MRE was prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition 

Standards and National Instrument 43‐101 ‐ Standards of Disclosure for Mineral Projects ("NI 43‐101"). 

Highlights 

 Significant increase in M&I and Inferred tonnage and contained metal over the 2019 MRE1  

o 98% growth in Measured and Indicated Resource tonnage to 139.6Mt at 0.48% CuT (0.30% CuS) for ~665,000 tonnes of 

contained Cu metal 

o 92% growth in Inferred Resource tonnage to 82.7Mt at 0.39% CuT (0.16% CuS) for ~323,000 tonnes of contained Cu 

 Establishes Marimaca as one of the largest copper discoveries globally in the last decade2 and has positive implications 

for production scale increases in future development studies 

o 50kt and 60kt per annum copper cathode production cases (vs. 36ktpa LOM average in PEA) will be assessed for DFS 

 High grade core which comprises the first six years of the 2019 PEA mine life is expected to remain intact and accessible 

in a scaled‐up development scenario 

o Approximately 50Mt at 0.7% CuT commencing from surface in green oxide3 for ~350,000 tonnes of contained metal 

 Very low strip ratio of 1:1 maintained in constraining pit shell, with all resources captured in a single continuous pit 

o Low pre‐strip and LOM strip ratio drive significant cost advantages 

 Clear opportunities remain for additional resource expansion with further exploration: 

o Mineralization at the MOD remains open to the east, south‐east, and down‐plunge  

o Near mine (<5km) satellite targets discovered in 2021 – Mercedes, Cindy, and Robles (see announcement dated 

January 20, 2022) – provide high probability targets for further mine life extension 

 2019 MRE showed relatively low sensitivity to changes in underlying copper price assumption indicating high return on 

investment of 2021 and 2022 drilling campaigns as they pertained to resource growth for the MOD (see Figure 1) 

1 2019 MRE at a 0.22% cut‐off grade, 2022 MRE at a 0.15% cut‐off grade 

2 Source: S&P Global Market Intelligence 

3 Per the June 2020 PEA mine plan 

 Significant amount of remaining 2022 drilling to be captured in planned early 2023 MRE 

o Targeting majority of tonnes to be captured in M&I categories to support eventual reserves 

o Potential for new higher‐grade green oxide zone identified in the shallow north and north‐ eastern areas of MOD to 

have positive grade implications for final MRE in early 2023 

Hayden Locke, President & CEO of Marimaca Copper, commented: 

“Sergio Rivera and his team delivered two very successful drilling programs in 2021 and 2022 through challenging operating 

conditions discovering new additional mineralisation adjacent and below the current Marimaca pit model. The 2022 MRE is a 

fantastic achievement and reflects the exceptional exploration and geological work completed by our extremely dedicated team. 

“With the discovery of the MOD depth extensions in 2021, we believed there was the potential to make a step change in the 

scale of the resource. This MRE has clearly achieved that. It establishes the MOD as one of the most significant greenfield copper 

oxide discoveries in the last 20 years and confirms its potential to host over one million tonnes of contained copper in a single 

pit. 

“Given the M&I resource estimate already points to more than 600,000 tonnes of contained metal, the Project will now clearly 

support a larger operation in terms of copper cathode production, but also a meaningful mine life extension. We will assess 

production scenarios between 50,000 and 60,000 tonnes per annum prior to commencing our Definitive Feasibility Study in 2023.  

“Importantly, the positive attributes which were key to the MOD’s industry leading return on invested capital (ROIC) metrics – 

low life of mine strip ratio, shallow high‐grade core in the first five years of the mine life, minimal pre‐strip and low expected 

start up capital cost – remain firmly intact, meaning this resource upgrade will be reflected as a material improvement in project 

value. 

“We have completed another 28,000m of drilling for which we are waiting on results. These will be released over the coming 

months and incorporated into a final MRE in early 2023, which will form the basis of our development plans for the Project.” 

Summary of 2022 Mineral Resource Estimate 

The  2022  MRE  was  completed  by  independent  consultants  NCL  Ingeniería  y  Construcción  SpA  (“NCL”)  and  verified  by  Luis 

Oviedo of NCL, a qualified person under NI 43‐101 and independent of Marimaca. The 2022 MRE incorporates 110,790m of 

drilling across 424 drill holes completed between 2016 and 2022 and is reported with an effective date of October 13, 2022. 

The Whittle Optimisations were run using the operating cost parameters from the Preliminary Economic Assessment for the 

Project and US$4/lb copper price assumption. 

Mineral Resource Category and 

Type 

Quantity        CuT  CuS  CuT   CuS 

(kt)  (%)  (%)  (t)  (t) 

Total Measured  47,051  0.54  0.36  253,157  167,614 

Total Indicated  92,516  0.45  0.26  412,375  244,200 

Total Measured and Indicated  139,567  0.48  0.30  665,531  411,814 

Total Inferred  82,678  0.39  0.16  322,910  128,416 

Table 1. 2022 Mineral Resource Estimate 

. 

* Pit shell constrained resources with demonstrated reasonable prospects for eventual economic extraction (RPEEE) are generated using series of Lerchs‐Grossmann 

pit shell optimizations completed by NCL 

* CuT means total copper and CuS means acid soluble copper. Technical and economic parameters include: copper price US$4.00/lb; mining cost US$1.51/t; HL 

processing cost US$5.94/t (incl. G&A); ROM processing cost US$1.65/t (incl. G&A); selling cost US$0.16/lb Cu; heap leach recovery 76% of CuT; ROM recovery 40% of 

CuT; and 45°‐52° pit slope angle 

* With the economic parameters stated above, the Cut‐Off grade of the Mineral Resource Estimate is approximately 0.15% CuT and a strip ratio of 1:1 has been 

estimated by NCL. 

* Mineral resources which are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty which may attach to inferred mineral 

resources, it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of 

continued exploration 

Cut‐off 

grade 

 (% CuT) 

Measured  Indicated  Measured + Indicated  Inferred 

Quantity  

kt  CuT [%]  CuS [%]  Quantity  

kt  CuT [%]  CuS [%]  Quantity  

kt  CuT [%]  CuS [%]  Quantity   

kt  CuT [%]  CuS [%] 

0.40  24,607  0.79  0.53  37,550  0.72  0.44  62,158  0.74  0.48  27,222  0.68  0.25 

0.30  32,157  0.68  0.46  54,563  0.60  0.37  86,720  0.63  0.40  41,422  0.56  0.22 

0.25  36,837  0.63  0.42  65,910  0.55  0.33  102,746  0.58  0.36  52,332  0.50  0.20 

0.22  40,000  0.60  0.40  73,517  0.51  0.31  113,517  0.54  0.34  60,431  0.47  0.19 

0.20  42,206  0.58  0.39  78,880  0.49  0.30  121,086  0.52  0.33  66,256  0.44  0.18 

0.18  44,291  0.56  0.37  84,610  0.47  0.28  128,900  0.50  0.31  72,670  0.42  0.17 

0.15  47,051  0.54  0.36  92,516  0.45  0.26  139,567  0.48  0.30  82,678  0.39  0.16 

0.10  50,536  0.51  0.34  100,946  0.42  0.25  151,482  0.45  0.28  96,064  0.35  0.14 

0.05  57,125  0.46  0.30  119,653  0.36  0.21  176,777  0.39  0.24  123,552  0.29  0.11 

0.00  61,333  0.43  0.28  129,985  0.34  0.20  191,318  0.37  0.22  134,056  0.27  0.11 

Table 2. Mineral Resource Sensitivity 

* Pit shell constrained resources with demonstrated reasonable prospects for eventual economic extraction (RPEEE) are generated using series of Lerchs‐Grossmann 

pit shell optimizations completed by NCL 

* CuT means total copper and CuS means acid soluble copper. Technical and economic parameters include: copper price US$4.00/lb; mining cost US$1.51/t; HL 

processing cost US$5.94/t (incl. G&A); ROM processing cost US$1.65/t (incl. G&A); selling cost US$0.16/lb Cu; heap leach recovery 76% of CuT; ROM recovery 40% of 

CuT; and 45°‐52° pit slope angle 

* With the economic parameters stated above, the Cut‐Off grade of the Mineral Resource Estimate is approximately 0.15% CuT and a strip ratio of 1:1 has been 

estimated by NCL. 

* Mineral resources which are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty which may attach to inferred mineral 

resources, it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of 

continued exploration 

Outcome of 2021 and 2022 Expansion & Infill Drill Programs 

Figure 1  demonstrates  Resource growth  in the 2022 MRE  attributable to  both the increased copper price  assumption,  and 

growth  driven  by  the  results  of  the  2021  and  2022  drilling  campaigns.  Drilling  delivered  strong  extensions  both  below  the 

previously  interpreted  limits  of  the  Marimaca  oxide  mineralization  into  the  newly‐discovered  zone  of  mixed  mineralization 

(“MAMIX”), as well as on the east and south‐east periphery of the MOD where mineralization was previously interpreted to be 

thinning. Both areas delivered extensions to higher‐grade zones and had a positive influence on the contained metal increases 

in the 2022 MRE relative to the 2019 MRE.  

Figure 1. Resource Growth – Tonnage 

Metallurgy Commentary  

Marimaca has completed 5 phases of extensive metallurgical test work at Marimaca. Results from Phase 5 were announced on 

June 15, 2022 following a rigorous program including full‐scale column testing, mini‐column testing, container‐leach testing, 

sulfation tests, acid sensitivity testing, Iso‐pH testing, and head characterization for heap leach (“HL”) and run‐of‐mine (“ROM”) 

samples. In‐line with results from Phases 1‐4, Phase 5 recoveries in the column and bottle roll tests generally exceeded the 

solubility ratio (CuS/CuT) and leaching potential of the samples, indicating a potentially larger proportion of total copper will 

be recovered in industrial‐scale operations. The leaching potential of copper ores is defined as acid soluble copper (CuS) plus 

cyanide  soluble  copper  (CuCN)  divided  by  total  copper  (CuT).  The  acid  solubility  ratio  (CuS/CuT)  for  copper  oxides  such  as 

atacamite,  brochantite  and  chrysocolla,  which  dissolve  quickly  when  exposed  to  acid,  is  a  good  predictor  of  leachability. 

However, where the mineralization has several copper bearing minerals with different dissolution characteristics under these 

leaching  conditions  (such  as  Marimaca’s  black  oxide  (wad)  component),  the  copper  acid  solubility  ratio  may  materially 

underestimate  the  acid  leaching  potential  for  heap  leach  operations,  especially  where  soluble  copper  sulphides  such  as 

chalcocite, covellite and bornite are present. 

The Marimaca Deposit Commentary 

The  2021/22  drilling  programs  and  subsequent  2022  MRE  provide  further  validation  of  the  Marimaca  geological  model 

developed by the Company’s exploration team. Figure 2 (long section) demonstrates the continuity of the oxide mineralization 

across  the  N‐S  extent  of  the  deposit.  Mineralization  is  hosted  consistently  by  east‐dipping  fracture  sets  with  higher  grades 

concentrated along controlling NW‐SE structures and splays. Higher grade green oxide mineralization (brochantite, atacamite, 

chrysocolla) dominates the core of the deposit and is located near‐surface. High grade zones of oxides, mixed and enriched 

mineralization extend at depth into the underlying MAMIX zone which was an important driver of growth in the 2022 MRE. 

Due to the continuous nature of mineralization, the increased copper price assumption does not materially impact the Project’s 

strip ratio due to the extensive green and black oxide (wad) mineralized halo which gets captured by the larger resource pit. 

The Company believes that significant oxide resource upside remains at the MOD and in nearby satellite targets. At the MOD, 

mineralized intercepts located to the east and southeast of the deposit have not been captured in the 2022 MRE due to lack of 

sufficient drill density. The MOD remains open to the east and southeast and further exploration may be planned in due course. 

In addition, the satellite oxide discoveries made in 2021 (Mercedes, Cindy, Roble) have not received sufficient drilling to be 

included in the 2022 MRE. The plan map seen in Figure 4 demonstrates the proximity of the satellite targets to the 2022 MRE 

resource pit.  

Figure 2. Long Section, Looking North‐East, 2022 MRE Pit Shell 

Figure 3. Block Model Plan View – 2022 MRE 

Figure 4. Plan View of Marimaca Satellite Exploration Targets 

The potential quantity and grade presented in the exploration target ranges are conceptual and have insufficient exploration and 

drill  density  to  define  a  Mineral  Resource.  At  this  stage,  it  is  uncertain  if  further  exploration  will  result  in  the  targets  being 

delineated as a Mineral Resource. Estimates of exploration targets are not Mineral Resources and are too speculative to meet the 

NI  43‐101  reporting  standards.  The  detailed  methodology  for  preparing  the  Exploration  Targets  and  a  summary  of  supporting 

technical data can be found in the announcement dated January 20, 2022 “Marimaca Announces Exploration Targets for Near‐Pit 

Oxide Satellites and MAMIX Depth Extension”. 

2022 MRE Estimation Parameters 

Grade estimates were completed using ordinary kriging with nominal block size measuring 5m by 5m by 5m. Resources have 

been classified by their proximity to sample locations and number of drill holes and samples within different search ellipsoids, 

and are reported according to Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral 

Resources and Mineral Reserves and National Instrument 43‐101 ‐ Standards of Disclosure for Mineral Projects. 

Operating  costs  and  certain  operating  parameters,  such  as  metallurgical  recoveries,  were  taken  from  the  2020  Preliminary 

Economic Assessment, which was completed by Ausenco according to Canadian Institute of Mining, Metallurgy and Petroleum 

(CIM)  Definition  Standards  for  Mineral  Resources  and  Mineral  Reserves  and  National  Instrument  43‐101 ‐   Standards  of 

Disclosure for Mineral Projects. 

Mineral Resource Category and Type  Quantity          CuT  CuS  CuT   CuS 

(kt)  (%)  (%)  (t)  (t) 

Measured                

Brochantite  22,371  0.65  0.47  144,870  104,957 

Chrysocolla  12,252  0.46  0.36  56,558  44,057 

Wad/Black oxides  6,578  0.31  0.17  20,366  11,445 

Mixed  5,106  0.55  0.13  28,176  6,693 

Enriched  743  0.43  0.06  3,186  462 

Total Measured  47,051  0.54  0.36  253,157  167,614 

Indicated                

Brochantite  27,865  0.60  0.44  166,469  122,706 

Chrysocolla  18,239  0.41  0.30  74,012  55,497 

Wad/Black oxides  28,036  0.29  0.16  82,607  45,340 

Mixed  14,557  0.51  0.13  73,595  18,413 

Enriched  3,819  0.41  0.06  15,692  2,244 

Total Indicated  92,516  0.45  0.26  412,375  244,200 

Measured and Indicated                

Brochantite  50,235  0.62  0.45  311,340  227,663 

Chrysocolla  30,492  0.43  0.33  130,571  99,554 

Wad/Black oxides  34,614  0.30  0.16  102,973  56,785 

Mixed  19,664  0.52  0.13  101,771  25,106 

Enriched  4,562  0.41  0.06  18,877  2,706 

Total Measured and Indicated  139,567  0.48  0.30  665,531  411,814 

Inferred                

Brochantite  10,364  0.52  0.37  54,026  38,124 

Chrysocolla  9,028  0.35  0.25  31,400  22,496 

Wad/Black oxides  24,907  0.28  0.14  70,325  35,229 

Mixed  17,129  0.47  0.12  80,152  19,809 

Enriched  21,249  0.41  0.06  87,008  12,758 

Total Inferred  82,678  0.39  0.16  322,910  128,416 

Table 3. 2022 MRE by Mineralization Type