Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MARI.TO ·

Coro Reports Positive Results from Step Out Drilling at Marimaca Copper Project, Chile

Exploration Programs

Suite 1280 – 625 Howe St

Vancouver, B.C. V6C 2T6

News Release

TSX: COP

www.coromining.com

Page | 1

Coro Reports Positive Results from Step Out Drilling at Marimaca Copper Project,

Chile

- Drilling highlights include 180m @ 0.58%CuT and 72m @ 1.34%CuT

January 22, 2018 - Coro Mining Corp. (“Coro” or the “Company”) (TSX Symbol: COP) is pleased to announce

the results of reverse circulation (RC) step out drilling completed at its Marimaca copper project, located 22km

E of the port of Mejillones in the II Region of Chile, (Figs. 1 & 2). Results have been received for all 12 RC holes

drilled on the La Atomica claim, which adjoins Marimaca to the NW, and for 7 RC scout holes drilled to the NE

of the existing resource on the Marimaca claim. Results have also been received for 5 out of 6 geotechnical

diamond (DD) holes drilled on the margins of the initial resource. Since discovery in 2016, Coro has drilled a

total of 133 RC and 16 DD holes on property for 32,289m.

The drilling at La Atomica intersected leachable copper mineralization in ten out of twelve holes, with the

remaining two holes confirming the location of the SW faulted boundary of the deposit. The mineralized holes

contained multiple intersections of oxides similar in grade and thickness to Marimaca, highlighted by 140m @

0.46%CuT from surface, with some mixed and remnant enriched mineralization at depth, highlighted by 72m

@ 1.34%CuT. Topographic constraints resulted in two of the holes being drilled in a sub-optimal orientation

with respect to the known structure. This step out drilling has confirmed the potential for additional resources

in an area of approximately 300 x 300m at La Atomica and it remains open over a further similar area to the

NW, where inspection of underground workings has confirmed the presence of mineralization.

Thick mineralization averaging 180m @ 0.58%CuT was intersected from surface in one of the scout holes

drilled some 300m NE of the Marimaca resource, indicating that the deposit continues in this direction. A

second hole intersected 42m @ 1.82%CuT at depth as mixed and primary mineralization in the area

immediately NE of the resource. Of the remaining five holes, three hit partially leached mineralization, possibly

associated with faulting, while the other two appear to have defined the southern boundary of the leachable

deposit in this part of the claim.

All of the reported geotechnical holes intersected leachable mineralization, highlighted by 84m @ 1.16%CuT

and 96m @ 0.61%CuT, with 12m @ 3.05% in primary mineralization intercepted at depth on the NE side of the

deposit.

“We are very encouraged by these results and those from the recently completed infill drill program. The

Marimaca deposit continues to grow significantly and still remains completely open to the north and south,”

commented Coro President and CEO, Luis Tondo.

Page | 2

Marimaca Drilling Results

Results are shown on Table 1a, 1b and 1c, where %CuT means total copper. Drill hole locations are shown on

Fig 3. Drill collar coordinates are shown on Table 2.

Table 1a: La Atomica Intersections

Hole TD From To m %CuT Type

LAR-01 260m

4 44 40 0.45 Oxide

and

60 84 24 0.36 Oxide

102 224 122 0.44 Oxide

256 260 4 1.89 Mixed

LAR-02 250m

22 44 22 0.43 Oxide

and 80 116 36 0.30 Oxide

210 224 14 0.56 Oxide

LAR-03 250m

2 34 32 0.27 Oxide

and

52 68 16 0.57 Oxide

78 148 70 0.33 Oxide

168 214 46 0.81 Oxide

LAR-04 250m 0 146 146 0.46 Oxide

LAR-05 250m

8 20 12 0.26 Oxide

and 54 82 28 0.49 Oxide

112 184 92 0.49 Oxide

Page | 3

Hole TD From To m %CuT Type

LAR-06 300m

48 80 32 0.40 Oxide

and

112 150 38 0.48 Oxide

150 176 26 0.76 Mixed

206 216 10 0.31 Oxide

228 300 72 1.34 All

including

228 246 18 0.63 Oxide

246 252 6 5.79 Enriched

252 258 6 0.83 Oxide

258 270 12 1.82 Enriched

270 300 30 0.78 Mixed

LAR-07 250m 110 140 30 0.53 Oxide

LAR-08 160m No Significant Results

LAR-09 150m No Significant Results

LAR-10 150m 30 62 32 0.42 Oxide

LAR-11 250m

0 54 54 0.32 Oxide

and

72 126 54 0.37 Oxide

148 172 24 0.26 Oxide

172 186 14 1.18 Mixed

LAR-12 250m 88 122 34 0.23 Oxide

Page | 4

Table 1b: Marimaca NE Intersections

Hole TD From To m %CuT Type

MAR-112 250m No Significant Results

MAR-113 250m

166 208 42 1.82 All

and 166 194 28 1.58 Mixed

194 208 14 2.29 Primary

MAR-114 300m

0 180 180 0.58 All

including

0 90 90 0.34 Oxide

90 132 42 1.04 Mixed

138 152 14 0.80 Primary

152 166 14 0.45 Mixed

166 180 14 0.81 Primary

MAR-115 300m 102 124 22 0.49 Primary

MAR-116 300m

54 70 16 0.62 Oxide

and 136 148 12 0.27 Mixed

168 178 10 1.15 Primary

MAR-117 250m No Significant Results

MAR-120 250m 112 130 18 0.57 Oxide

Page | 5

Table 1c: Marimaca Geotechnical DDH Intersections

Hole TD From To m %CuT Type

MAD-11 200m

28 42 14 0.68 Oxide

and

68 98 30 0.34 Oxide

110 124 14 0.86 Oxide

136 150 14 1.05 Oxide

170 184 14 0.35 Mixed

MAD-12 200m

90 174 84 1.16 All

90 116 26 1.87 Oxide

116 132 16 1.17 Mixed

132 164 32 0.61 Oxide

164 174 10 1.01 Mixed

MAD-13 180m 32 46 14 0.37 Oxide

MAD-14 200m Results Awaited

MAD-15 200m 50 146 96 0.61 Oxide

MAD-16 250m

182 194 12 3.05 Primary

and 194 206 12 0.32 Mixed

220 232 12 2.72 Mixed

Sampling and Assay Protocol

True widths cannot be determined with the information available at this time. Coro RC holes were sampled on

a 2 metre continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical

Assay preparation laboratory in Calama and the pulps then sent to the same company’s laboratory in Santiago

for assaying. A second quarter was stored on site for reference. Samples were prepared using the following

standard protocol: drying; crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-

700g subsample to 95% passing -150#; and a 125g split of this sent for assaying. All samples were assayed for

CuT (total copper), CuS (acid soluble copper), CuCN (cyanide soluble copper) by AAS and for acid consumption.

A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with

acceptable results. Pulps and sample rejects are stored by Coro for future reference.

Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 33 years of

experience and a member of the Colegio de Geologos de Chile and of the Instituto de Ingenieros de Minas de

Page | 6

Chile, was responsible for the design and execution of the exploration program and is the Qualified Person for

the purposes of NI 43-101. Alan Stephens, FIMMM, Executive Director of Coro Mining Corp, a geologist with

more than 42 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the

contents of this news release.

Fig 1: Location of Marimaca

Page | 7

Fig 2: Marimaca Claim Map

Page | 8

Fig 2: Marimaca Drill Plan