Coro Mining Marimaca Exploration Update: Northeastwards Continuation of Mineralization at Tarso Highlighted by 82 metres at 0.72% CuT
TSX:COP www.coromining.com
www.coromining.com
News Release
Coro Mining Marimaca Exploration Update:
Northeastwards Continuation of Mineralization at Tarso
Highlighted by 82 metres at 0.72% CuT
Vancouver, British Columbia, July 30, 2019 – Coro Mining Corp. (“Coro” or the “Company”) (TSX: COP) is
pleased to provide an update for the Marimaca Project in the Antofagasta Region of Chile .
Results have now been received from 40 RC holes for a total 9,950 metres in and around the Tarso area. The
drill results confirm the extension of mineralization from Atahualpa towards the north-east with the Tarso holes
also delineating the edge of mineralization. These results mark the completion of the Phase II RC drilling program
and will be incorporated in the expanded resource calculation which remains on track for publication by the end
of September 2019.
Highlights
Results from the drilling confirmed oxide mineralization, including:
• Hole ATR-99, from 56 to 138 metres, 82 metres averaging 0.72% CuT
• Hole ATR-101, from 68 to 126 metres, 58 metres averaging 0.60% CuT,
including from 78 to 116 metres 38 metres averaging 0.96% CuT
• Hole ATR-102, from 68 to 84 metres, 16 metres averaging 1.12% CuT
• Hole ATR-104, from 60 to 86 metres, 26 metres averaging 0.87% CuT,
and from 108 to 122 metres, 14 metres averaging 0.87% CuT
Results from the drilling confirmed mixed oxide-enriched sulphide mineralization, including:
• Hole ATR-98, from 134 to 144 metres, 10 metres averaging 0.68% CuT,
including from 118 to 138 metres, 20 metres averaging 1.45% CuT
• Hole TAR-13, from 66 to 786 metres, 10 metres averaging 1.65% CuT
Results from the drilling confirmed primary sulphide mineralization, including:
• Hole ATR-62, from 236 to 246 metres, 10 metres averaging 1.30% CuT
• Hole ATR-63, from 240 to 258 metres, 18 metres averaging 1.13% CuT
• Hole TAR-04, from 204 to 226 metres, 22 metres averaging 0.72% CuT
Commenting on the results, Sergio Rivera, Vice President of Exploration said: “The Tarso sector is the final area
to be explored in the expanded Marimaca Phase II exploration program. The results are positive as they confirm
further extension of the mineralised zone at Marimaca into the Tarso area and the mineralized body at Marimaca
now measures approximately 1,400 metres in length , by 700 metres wide and is 100 to 300 metres thick,
averaging approximately 120 metres.
Furthermore, as results reported from Atahualpa last month, where some drill hole returned primary sulphide
intercepts, it is interesting to see more drilling intercepts with some high grade copper sulphide mineralization
at Tarso that may warrant additional exploration.”
2
Further Information
The final 40 RC holes for 9,950 metres in the Tarso and Atahualpa areas concludes the RC drilling for the
Marimaca Phase II program.
These drill results confirm the extension of the Marimaca deposit in a north-easterly direction over a 400-metre-
long by 300-metre-wide area. The green line in Figure 1 shows the interpreted limits of the Marimaca copper
oxide mineralization in the central area targeted by the Phase II exploration program.
Figure 1: Tarso and area RC holed locations
3
Marimaca Phase II Program
These results comprise the final RC drill holes for the Phase II program. A smaller diamond drill hole program
oriented to check structural controls, provide additional information about the nature of the mineralization and
for obtaining geotechnical data and samples for metallurgical test work is nearing completion , with results
anticipated in the coming months.
All drill holes will be incorporated with the already published Phase I resource into a single enlarged Phase II
resource by the end of September 2019. With the field work largely complete, the Company will now assemble
the lithology-structure and mineralization zones model, the 3D geologic model, data base review, QaQc
reporting, density measurements and bore hole measurements of structural data interpretation, plus th e
integration of all sampling and geologic data obtained along the underground workings. It is intended to publish
progress updates and share findings between now and the publication of the resource.
Sampling and Assay Protocol
True widths cannot be determined with the information available `at this time. Coro RC holes were sampled on
a 2-metre continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical
Assay preparation laboratory in Calama and the pulps then sent to the same company’s laboratory in Santiago
for assaying. A second quarter was stored on site for reference. Samples were prepared using the following
standard protocol: drying; crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-
700g subsample to 95% passing -150#; and a 125g split of this sent for assaying. All samples were assayed for
CuT (total copper), CuS (acid soluble copper), CuCN (cyanide soluble copper) by AAS and for acid consumption.
A full QA/QC program, involving insertion of appr opriate blanks, standards and duplicates was employed with
acceptable results. Pulps and sample rejects are stored by Coro for future reference.
Figure 2: Tarso and area intersections
Hole TD (m) From To m %CuT Type
ATR-62 300
126 142 16 0.47 Enriched - Primary
including 126 134 8 0.75 Enriched
and 236 246 10 1.30 Primary
and 264 290 26 0.37 Enriched - Primary
including 264 280 16 0.43 Enriched - Primary
ATR-63 300
50 60 10 0.85 Oxide
and 146 168 22 0.40 Oxide - Mixed - Enriched
and 240 280 40 0.68 Primary - Enriched - Mixed
including 240 258 18 1.13 Primary - Enriched
ATR-64 300
0 28 28 0.38 Oxide
including 6 22 16 0.56 Oxide
4
Tarso and area intersections continued,
ATR-65 300
106 136 30 0.42 Enriched - Mixed
including 106 128 22 0.50 Enriched - Mixed
and 238 286 48 0.23 Oxide - Mixed
ATR-90 200 No significant results
ATR-98 200
134 182 48 0.42 Mixed - Enriched - Primary
including 134 144 10 0.68 Mixed - Enriched
158 182 24 0.50 Mixed - Enriched - Primary
ATR-991 300
10 24 14 0.31 Oxide
56 138 82 0.72 Oxide
including 56 72 16 0.58 Oxide
and
76 112 36 0.49 Oxide
118 138 20 1.45 Oxide
158 176 18 0.45 Oxide
222 234 12 0.31 Primary
ATR-100 200
146 194 48 0.32 Oxide - Mixed
including 148 170 22 0.37 Oxide - Mixed
ATR-101 200
68 126 58 0.76 Oxide - Mixed
including 78 116 38 0.96 Mixed - Oxide
ATR-102 200
48 86 38 0.59 Oxide - Mixed
including 68 84 16 1.12 Oxide - Mixed
118 134 16 0.30 Primary
ATR-103 150
148 234 86 0.53 Oxide - Enriched - Primary
including 62 88 26 0.42 Oxide
and 116 132 16 0.46 Enriched - Primary
5
Tarso and area intersections continued,
ATR-104 300
48 86 38 0.64 Oxide – Mixed
including 60 86 26 0.87 Oxide - Mixed
108 122 14 0.87 Oxide
206 224 18 0.39 Primary
AER-01 250
176 192 16 0.31 Primary
including
AER-02 350 No Significant Results
AER-03 300
2 38 36 0.34 Oxide
including 16 38 22 0.42 Oxide
TAR-01 300 No Significant Results
TAR-02 300 104 126 22 0.32 Oxide
TAR-03 300
26 62 36 0.31 Oxide
including 32 62 30 0.33 Oxide
TAR-04 250
136 142 6 0.55 Enriched - Mixed
and 204 226 22 0.72 Primary - Oxide
TAR-05 300 No Significant Results
TAR-06 200 No Significant Results
TAR-07 200 No Significant Results
TAR-08 300
16 40 24 0.38 Oxide
including 16 28 12 0.60 Oxide
TAR-09 200
34 74 40 0.34 Oxide - Mixed
including 34 60 26 0.43 Oxide - Mixed
TAR-10 200
34 58 24 0.43 Oxide
including 34 50 16 0.58 Oxide
TAR-11 200 28 60 32 0.35 Oxide
6
Tarso and area intersections continued,
TAR-12 300 No Significant Results
TAR-13 200 66 76 10 1.65 Enriched - Oxide
TAR-14 300 No Significant Results
TAR-15 200 No Significant Results
TAR-16 300 No Significant Results
TAR-17 300 No Significant Results
TAR-18 200 No Significant Results
TAR-19 300 No Significant Results
TAR-20 200 No Significant Results
TAR-21 250 No Significant Results
TAR-22 200 No Significant Results
TAR-23 200 No Significant Results
TAR-24 200 No Significant Results
TAR-25 200 No Significant Results
1 ATR-99, from 72 to 76 metres includes 6 metres not recovered due to passing through an historic underground working
Figure 3: Tarso and area drill collars
Hole Easting Northing Elevation Azimuth Inclination Depth
ATR-62 375397.1 7435918.6 1123.1 310 -60 300
ATR-63 375319.8 7435963.8 1128.5 310 -60 300
ATR-64 375321.7 7435960.9 1128.4 220 -60 300
ATR-65 375239.6 7436043.7 1137.0 310 -60 300
ATR-90 375170.5 7435968.3 1139.6 310 -60 200
ATR-98 375172.7 7435962.9 1139.6 220 -60 200
ATR-99 374856.7 7436358.8 1086.3 220 -60 300
ATR-100 375099.4 7436034.0 1144.1 220 -60 200
ATR-101 375162.1 7436125.5 1116.2 220 -60 200
ATR-102 375239.8 7436038.6 1137.1 220 -60 200
ATR-103 375158.0 7436129.0 1116.1 270 -60 150
ATR-104 375082.4 7436209.7 1093.4 220 -60 300
AER-01 374993.4 7436511.2 1064.8 310 -60 250
AER-02 374998.7 7436512.4 1064.4 220 -60 350
AER-03 375155.7 7436244.5 1098.2 310 -60 300
TAR-01 375385.5 7436052.7 1144.4 310 -60 300
7
Tarso and area drill collars continued,
TAR-02 375439.9 7436138.7 1137.1 310 -60 300
TAR-03 375219.7 7436173.6 1109.9 310 -60 300
TAR-04 375006.9 7436377.8 1065.6 270 -60 250
TAR-05 375297.5 7436131.2 1110.8 310 -60 300
TAR-06 375377.2 7436201.4 1106.7 310 -60 200
TAR-07 375296.1 7436261.8 1085.1 310 -60 200
TAR-08 375221.5 7436326.5 1081.9 310 -60 300
TAR-09 375221.4 7436170.7 1109.9 220 -60 200
TAR-10 375138.9 7436390.5 1067.2 310 -60 200
TAR-11 375158.8 7436237.7 1098.4 220 -60 200
TAR-12 375085.2 7436312.6 1074.0 310 -60 300
TAR-13 375299.8 7436125.6 1111.1 220 -60 200
TAR-14 375527.4 7436345.5 1107.4 310 -60 300
TAR-15 375203.2 7436462.1 1064.2 310 -60 200
TAR-16 375570.5 7436408.2 1128.4 310 -60 300
TAR-17 375643.5 7436480.0 1097.2 310 -60 300
TAR-18 375429.9 7436578.7 1056.9 310 -60 200
TAR-19 375468.9 7436699.1 1048.2 310 -60 300
TAR-20 375676.3 7436723.0 1052.6 310 -60 200
TAR-21 375233.9 7436893.0 1063.7 310 -60 250
TAR-22 375661.1 7437002.8 1028.2 310 -60 200
TAR-23 375692.8 7436827.7 1033.9 310 -60 200
TAR-24 375734.9 7436934.6 1025.0 310 -60 200
TAR-25 375808.5 7436873.0 1033.2 310 -60 200
Qualified Persons
The technical information in this news release, including the information that relates to geology, drilling and
mineralization of the Marimaca Phase I and II exploration program was prepared under the supervision of, or
has been reviewed by Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than
36 years of experience and a member of the Colegio de Geologos de Chile and of the Institute of Mining
Engineers of Chile, and who is the Qualified Person for the purposes of NI 43-101 responsible for the design and
execution of the drilling program.
Coro Mining and the Marimaca Project
Marimaca is fast becoming recognised as one of the most significant copper discoveries in Chile in recent years
as it represents a new style of mineralization which challenges accepted exploration wisdom and promises to
open up new frontiers for discoveries elsewhere in the cou ntry. Unusually, Marimaca is a fracture controlled
and intrusive hosted deposit while the numerous and well known manto deposits in the same Coastal Copper
Belt are hosted by favourable volcanic rocks.
With a lack of new copper exploration discoveries in Chile the growing Marimaca resource is likely to make it a
sought-after development project as it is located near the coast at low elevation close to the city of Antofagasta
and the port of Mejillones. This prime location should enable its future developmen t at a relatively modest
8
capital investment. Marimaca would benefit from nearby existing infrastructure including roads, powerlines,
ports, a sulphuric acid plant, a skilled workforce and seawater.
Contact Information
For further information please visit www.coromining.com or contact:
Nicholas Bias, VP Corporate Development & Investor Relations
Cell: +44 (0)7771 450 679
Office: +56 2 2431 7601
Email: [email protected]
Forward Looking Statements
This news release includes certain “forward -looking statements” under applicable Canadian securities
legislation. These statements relate to future events or the Company’s future performance, business
prospects or opportunities. Forward -looking statements include, but are not limited to, statements
regarding the future development and exploration potential of the Marimaca Project. Actual future results
may differ materially. There can be no assurance that such statements will prove to be accurate, and actual
results and future events could differ materially from those anticipated in such statements. Forward -
looking statements reflect the beliefs, opinions and projections on the date the statements are made and
are based upon a number of assumptions and estimates that , while considered reasonable by Coro, are
inherently subject to significant business, economic, competitive, political and social uncertainties and
contingencies. Many factors, both known and unknown, could cause actual results, performance or
achievements to be materially different from the results, performance or achievements that are or may be
expressed or implied by such forward -looking statements and the parties have made assumptions and
estimates based on or related to many of these factors. Such fac tors include, without limitation: the
inherent risks involved in the mining, exploration and development of mineral properties, the uncertainties
involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of
project delays or cost overruns or unanticipated excessive operating costs and expenses, uncertainties
related to the necessity of financing, the availability of and costs of financing needed in the future as well
as those factors disclosed in the Comp any’s documents filed from time to time with the securities
regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick,
Nova Scotia, Prince Edward Island and Newfoundland and Labrador. Accordingly, readers should not place
undue reliance on forward -looking statements. Coro undertakes no obligation to update publicly or
otherwise revise any forward-looking statements contained herein whether as a result of new information
or future events or otherwise, except as may be required by law.