Coro Mining Marimaca Exploration Update:

New Multiple High Grade Zones and Primary Mineralization Identified at Atahualpa

Highlighted by 126 metres at 1.54% CuT and 118 metres at 0.93% CuT

Vancouver, British Columbia, June 19, 2019 – Coro Mining Corp. (“Coro” or the “Company”) (TSX: COP) is

pleased to provide an update for the Marimaca Project in the Antofagasta Region of Chile .

Results have now been received from the final fifth batch of 17 RC holes for 4,300 metres at Atahualpa ,

identifying new multiple high grade zones as well as primary sulphide mineralisation at depth.

Highlights

Results from the drilling confirmed oxide mineralization, including:

• Hole ATR-66, from 24 to 70 metres, 46metres averaging 1.25% CuT

• Hole ATR-78, from 54 to 86 metres, 32 metres averaging 0.68% CuT

• Hole ATR-80, from 54 to 104 metres, 50 metres averaging 0.57% CuT

• Hole ATR-85, from 26 to 84 metres, 58 metres averaging 0.77% CuT

• Hole ATR-87, from 140 to 166 metres, 26 metres averaging 1.10% CuT

• Hole ATR-94, from 18 to 38 metres, 20 metres averaging 0.74% CuT

Results from the drilling confirmed mixed oxide-enriched sulphide mineralization, including:

• Hole ATR-66, from 76 to 110 metres, 34 metres averaging 3.14% CuT

• Hole ATR-75, from 76 to 118 metres, 42 metres averaging 1.73% CuT

• Hole ATR-77, from 44 to 104 metres, 60 metres averaging 0.81% CuT

• Hole ATR-81, from 48 to 74 metres, 26 metres averaging 0.94% CuT

• Hole ATR-87, from 188 to 206 metres, 18 metres averaging 1.68% CuT

• Hole ATR-93, from 144 to 166 metres, 22 metres averaging 1.41% CuT

Results from the drilling confirmed primary sulphide mineralization, including:

• Hole ATR-78, from 178 to 204 metres, 26 metres averaging 0.97% CuT

• Hole ATR-79, from 122 to 138 metres, 16 metres averaging 1.4% CuT

• Hole ATR-82, from 206 to 250 metres, 44 metres averaging 1.05% CuT

• Hole ATR-84, from 148 to 174 metres, 26 metres averaging 0.84% CuT

• Hole ATR-85, from 84 to 120 metres, 36 metres averaging 1.68% CuT

• Hole ATR-93, from 180 to 218 metres, 38 metres averaging 1.04% CuT

• Hole ATR-94, from 78 to 126 metres, 78 metres averaging 1.30% CuT

Commenting on the results, Luis Tondo , President and CEO said: “We are very excited by these results at

Atahualpa. We have discovered new multiple high grade zones within the oxide zone at surface, and for the first

time, we are also starting to see fairly continuous higher grade primary sulphide and secondary mineralization

open at depth.

These results continue to confirm our thesis that Marimaca has the potential to be a large -scale open pittable

copper deposit and will now be incorporated in the enlarged project resource estimate, which remains on track

for completion during the third quarter 2019.”

2

Further Information

The final 17 RC holes for 4,300 metres brings the total number of reported RC holes at Atahualpa

to 92 for a total 24,816 metres. The original drill program envisaged 51 holes for 12,310 metres being completed

by the end of the first quarter 2019 ; the additional 41 holes and 12,506 have taken extra time and therefore

completed during the second quarter. The fifth batch drill holes are illustrated in Figure 1 below.

Figure 1: Atahualpa 5th-batch RC holed locations

Phase II Drilling

The Marimaca Phase II program commenced in Q4 2018 and has been designed to determine the extension of

the orebody across the Atómica, Atahualpa and Tarso areas, with a view to publishing an enlarged and combined

mineral resource estimate for the whole Marimaca project in Q3 2019.

The Atahualpa RC drilling is now complete, and the drilling for the Marimaca Phase II will be completed shortly.

A diamond drill program of 15 holes totalling 4,500 metres at La Atómica and Atahualpa is ongoing and will

assist with metallurgical testing for a Preliminary Economic Assessment (PEA). In addition, the Company is also

undertaking a smaller RC drilling campaign at Tarso, targeting 19 holes for 5,300 metres. The results from both

are anticipated in Q3 2019. The remaining drill holes will complement the 100 X 100 metre exploration of the

oxide mineral zone across the Phase II area, the more detailed drilling of the La Atómica southwest limit along

the Manolo zone, the east-west program which will allow a better understanding of higher copper grade feeders

controlling mineralization along Atahualpa and La Atómica areas , and the recent extra drill metres devoted to

define the high grade zones.

3

Deposit Size and High-Grade Zones

It is now known that the oxide deposit extends 1.4 kilometre along a north-northwest strike direction and attains

a maximum width of approximately 800 metres along an east -west direction and a thickness of 100 to 150

metres, containing at least four well defined higher grade zones, three of which are exposed from surface. The

principal higher grade zone presently identified is estimated to measur e approximately 250 x 250 m etres and

located in the central part of a 90 metre thick oxide blanket.

The latest drill results permit the interpretation of the existence of other high er-grade zones located at

Atahualpa and La Atómica as they correspond to either feeders or parallel fracture controlled mantos, mostly

at the intersection of both.

Newly Identified Primary Mineralisation at Atahualpa

The results show that the higher grade mineral zones result from the process of supergene alteration of a high

grade primary preserved at depth and converted in turn to enriched sulphides and then oxide mineralization

during supergene alteration. For the first time, drilling has intercepted more continuous primary mineralization

which reveals a potential that was not previously considered. An interpretation of the several high-grade zones

is illustrated in plan view in Figure 2, as a cross section in Figure 3, and a long section in Figure 4 below.

Figure 2: Phase II Map showing interpreted higher-grade zones with reference to Marimaca 1-23 block model location

4

Figure 3: Cross section

Figure 4: Long section

Sampling and Assay Protocol

True widths cannot be determined with the information available at this time. Coro RC holes were sampled on

a 2-metre continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical

Assay preparation laboratory in Calama and the pulps then sent to the same company laboratory in Santiago for

assaying. A second quarter was stored on site for reference. Samples were prepared using the following

standard protocol: drying; crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-

700g subsample to 95% passing - 150#; and a 125g split of this sent for assaying. All samples were assayed for

CuT (total copper), CuS (acid soluble copper), CuCN (cyanide soluble copper) by AAS and for acid consumption.

A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with

acceptable results. Pulps and sample rejects are stored by Coro for future reference.

5

Figure 5: Atahualpa Intersections

Hole TD (m) From To m %CuT Type

ATR-66 350

0 126 126 1.54 Oxide - Mixed - Enriched

including

24 70 46 1.25 Oxide

76 110 34 3.14 Mixed - Oxide - Enriched

and 236 262 26 0.42 Enriched - Oxide

and 326 344 18 0.31 Enriched - Primary

ATR-70 350

8 86 78 0.51 Oxide1

including

12 38 26 0.49 Oxide

46 64 18 1.07 Oxide

and 150 176 26 0.60 Primary

and 278 340 62 0.43 Primary

including 280 312 32 0.68 Primary

ATR-75 200

4 38 34 0.26 Oxide

And 76 118 42 1.73 Primary - Mixed - Oxide

including

76 92 16 3.46 Primary - Mixed - Oxide

104 118 14 1.20 Oxide - Mixed

ATR-77 200

44 122 78 0.68 Enriched - Primary

including

44 104 60 0.81 Enriched - Primary

108 122 14 0.31 Primary

ATR-78 300

50 108 58 0.67 Oxide – Enriched2

including

54 86 32 0.68 Oxide

90 108 18 0.76 Oxide - Enriched

and 136 166 30 0.58 Oxide - Enriched - Primary

including 138 160 22 0.72 Oxide - Enriched - Primary

and 178 204 26 0.97 Primary

including 178 194 16 1.36 Primary

ATR-79 200

6 46 40 0.46 Oxide

and 50 60 10 0.33 Oxide - Mixed

and 76 82 6 0.87 Mixed

and 122 138 16 1.40 Primary

6

Atahualpa intersections continued,

Hole TD (m) From To m %CuT Type

ATR-80 300

54 124 70 0.45 Oxide3

including 54 104 50 0.57 Oxide

and 184 208 24 0.52 Primary

including 184 196 12 0.85 Primary

and 224 234 10 0.31 Primary - Enriched

and 246 254 8 0.39 Primary

ATR-81 200

2 32 30 0.52 Oxide

including 2 22 20 0.65 Oxide

and 44 112 68 0.60 Oxide - Mixed - Enriched

including

48 74 26 0.94 Oxide - Mixed - Enriched

88 112 24 0.59 Oxide - Mixed - Enriched

and 124 184 60 0.44 Primary - Enriched

including 152 170 18 0.73 Primary - Mixed

182 194 12 0.82 Primary - Mixed - Enriched

ATR-82 250

58 100 42 0.31 Oxide - Enriched - Primary

including 84 98 14 0.53 Mixed

and 206 250 44 1.05 Enriched - Primary

including

206 218 12 0.78 Enriched

222 232 10 3.22 Enriched - Primary

ATR-83 200

2 102 100 0.43 Oxide - Mixed - Primary

including 44 72 28 0.84 Oxide - Mixed

and 178 194 16 0.32 Oxide

ATR-84 300

68 114 46 0.31 Oxide

including 90 108 18 0.52 Oxide

and 126 174 48 0.57 Oxide - Mixed - Primary

including

126 144 18 0.27 Oxide - Mixed

148 174 26 0.84 Mixed - Primary

and 194 206 12 1.36 Enriched - Primary

7

Atahualpa intersections continued,

Hole TD (m) From To m %CuT Type

ATR-85 200

2 120 118 0.93 Oxide - Enriched - Primary

including

26 84 58 0.77 Oxide

84 120 36 1.68 Enriched - Primary

ATR-87 300

88 120 32 0.32 Oxide - Mixed

including 88 96 8 0.65 Oxide

and 138 214 76 0.80 Oxide - Enriched - Primary

including

140 166 26 1.10 Oxide

188 206 18 1.68 Enriched - Primary

250 288 38 0.48 Oxide

ATR-92 200

6 102 96 0.49 Oxide - Mixed

including

6 32 26 0.40 Oxide

40 48 8 1.98 Oxide

64 102 38 0.50 Oxide - Mixed

and 114 120 6 0.46 Oxide

ATR-93 300

144 166 22 1.41 Oxide - Mixed - Enriched

and 180 242 62 0.79 Primary - Enriched

including

180 218 38 1.04 Primary - Enriched

222 236 14 0.57 Primary

ATR-94 200

12 52 40 0.55 Oxide

including 18 38 20 0.74 Oxide

and 64 136 72 0.98 Oxide - Primary

including 78 126 48 1.30 Primary - Oxide

150 160 10 0.60 Oxide - Mixed

166 172 6 0.30 Oxide

ATR-97 250

102 114 12 0.30 Oxide

and 146 168 22 0.33 Mixed - Primary

including 154 164 10 0.53 Primary

1 ATR-70, from 40 to 42 metres includes 2 metres not recovered due to passing through an historic underground working

2 ART-78, from 86 to 90 metres includes 4 metres not recovered due to passing through an historic underground working

3 ATR-80, from 72 to 76 metres includes 4 metres not recovered due to passing through an historic underground working

8

Figure 6: Fifth Batch Atahualpa Drill Collars

Hole Easting Northing Elevation Azimuth Inclination Depth

ATR-66 375015.0 7435797.5 1048.2 270 -60 350

ATR-70 375107.9 7435753.0 1068.1 270 -60 350

ATR-75 375041.0 7435742.3 1046.1 220 -60 200

ATR-77 375037.9 7435746.6 1045.8 270 -60 200

ATR-78 375089.5 7435792.9 1086.7 270 -60 300

ATR-79 375045.3 7435738.0 1046.6 310 -60 200

ATR-80 375089.6 7435789.3 1086.6 220 -60 300

ATR-81 374993.1 7435750.8 1040.1 220 -60 200

ATR-82 375088.7 7435793.9 1086.7 310 -60 250

ATR-83 374991.5 7435754.3 1040.1 270 -60 200

ATR-84 375064.9 7435861.1 1093.1 220 -60 300

ATR-85 374987.6 7435760.3 1039.8 310 -60 200

ATR-87 375063.0 7435863.5 1093.2 270 -60 300

ATR-92 374958.4 7435795.6 1037.4 270 -60 200

ATR-93 375053.8 7435897.1 1094.4 220 -60 300

ATR-94 374959.1 7435799.3 1037.5 310 -60 200

ATR-97 375144.1 7435803.9 1084.6 270 -60 250

Qualified Persons

The technical information in this news release, including the information that relates to geology, drilling and

mineralization of the Marimaca Phase I and II exploration program was prepared under the supervision of, or

has been reviewed by Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than

36 years of experience and a member of the Colegio de Geologos de Chile and of the Institute of Mining

Engineers of Chile, and who is the Qualified Person for the purposes of NI 43-101 responsible for the design and

execution of the drilling program.

Coro Mining and the Marimaca Project

Marimaca is fast becoming recognised as one of the most significant copper discoveries in Chile in recent years

as it represents a new type of discovery which challenges accepted exploration wisdom and promises to open

up new frontiers for discoveries elsewhere in the country. Marimaca is an intrusive orebody while the mantos

deposits in the region are volcanic, which saw it overlooked by the major copper producers in the past, although

it behaves like a volcanic setting as the extensive fracturing provides space for mineralisation to enter.

With a lack of new copper exploration discoveries in Chile the growing Marimaca resource is likely to make it a

sought-after development project as it is situated in the coastal belt at low elevation close to Antofagasta and

Mejillones. This prime location could enable its future development at a relatively modest capital investment.

Marimaca would benefit from nearby existing infrastructure including roads, powerlines, ports, a sulphuric acid

plant, a skilled workforce and seawater.