Coro Mining Marimaca District Exploration Update: La Atómica Drilling and Underground Sampling Results Highlighted by 98 metres at 0.63%CuT

Drill Results Exploration Programs

Coro Mining Marimaca District Exploration Update: La Atómica Drilling and Underground Sampling

Results Highlighted by 98 metres at 0.63%CuT

VANCOUVER, British Columbia, Jan. 16, 2019 -- Coro Mining Corp. (“Coro” or the “Company”) (TSX: COP) is pleased to announce an update at the

Company’s Marimaca project in the Antofagasta region of Chile.  

At La Atómica, the area that was acquired after Marimaca 1-23, drilling has been completed and confirms the continuation of copper oxide mineralization to

the northwest.

Highlights

• Results from 27 of the 64 RC drill holes completed, including 9 more holes than originally planned, for 6,530 metres of a total 15,100 metres, drilled on

a 100 x100 metre grid. Highlights include:

Hole LAR 44

°  From 132 to 176 metres, 44 metres of copper oxide mineralization averaging 0.79% CuT, including 26 metres, from 150 to 176 metres, averaging

1.49% CuT.

°  From 182 to 228 metres, 46 metres of copper oxide mineralization averaging 1.49% CuT, including 30 metres, from 198 to 228 metres, averaging

2.16% CuT.

°  From 232 to 258 metres, 26 metres of mixed copper oxide chalcocite mineralization averaging 2.05% CuT.

Hole LAR 63

°  From 42 to 140 metres, 98 metres of copper oxide mineralization averaging 0.63% CuT.

°  From 104 to 130 metres, 26 metres of copper oxide mineralization averaging 1.34% CuT.

Hole LAR 66

°  From 52 to 84 metres s, 32 metres of copper oxide mineralization averaging 0.56 %CuT, including 10 metres, from 62 to 72 metres, averaging 1.28

%CuT.

• A total of 2,648 metres of chip channel samples has been collected from underground workings, averaging 0.66% CuT, with highlights including:

°  96 metres at 0.49% CuT

°  46 metres at 0.53% CuT

°  52 metres at 0.61% CuT

°  48 metres at 0.92% CuT

°  26 metres at 1.32% CuT

• Current work suggests total horizontal extension of the outcropping copper oxide mineralization from Marimaca to La Atómica now reaches 800 metres

in a north-west direction, however, this could extend further.

• Drilling program was expanded to confirm copper oxide mineralization towards the southwestern part of the La Atómica property, with an additional 9

holes for 2,120 metres have been drilled with assay results pending.

Further Information

Figure 1 below illustrates the location of the completed Phase I drilling which established the resource at Marimaca 1-23 and the Phase II drill holes at La

Atómica. The location of the underground workings at La Atómica is also shown. It is worth noting that due to the designed 100 x 100 metre grid spacing, just

a few holes intercepted the underground working area. Included below are tables showing the drill intercepts and a drill hole collar location data (UTM PSAD

56 coordinate system).  

Figure 1: La Atómica updated drill hole locations

Underground workings at La Atómica extend 370 metres from the Marimaca 1-23 resource drill grid and are located 50 to 100 metres from the previously

released Atahualpa underground working results. These historic and easily accessible sub-horizontal workings extend over a 200 x 150 metre area in a north-

south direction to a depth of 70 to 100 metres below surface.

Figure 2 shows the distribution of copper in the underground workings and the location of selected intervals. This demonstrates consistent grades of 0.6-0.8%

CuT and above. It also indicates the continuation of the mineralization to the north west from the Marimaca 1-23 resource.

Figure 2: La Atómica underground workings location and sampling results

Underground workings are easily accessible and display good rock quality conditions.  Although no reports from earlier mining activities exist, it is believed

from sampling and the continuous copper oxide mineralization exposed in the declines and adits, that the workings were developed to mine material

estimated to contain above 2% copper. Copper mineralization is chiefly brochantite and its occurrence is controlled by low to moderately parallel fracturing of

the intrusive host rock.

Figure 3: La Atómica underground workings; selected intersections

Working From (m) To (m) Length (m) % CuT % CuS

LAS-03 104 192 88 0.30 0.16

LAS-N 1062 1160 88 0.45 0.28

including 1062 1092 30 0.63 0.40

LAS-N

including

1156 1252 96 0.49 0.33

1176 1206 30 0.64 0.41

LAS-N 1292 1340 48 0.74 0.39

LAS-B 244 290 46 0.53 0.41

LAS-F 444 470 26 0.60 0.50

LAS-L 838 890 52 0.61 0.48

including 838 872 34 0.83 0.67

LAS-02 0 48 48 0.92 0.55

including 22 48 26 1.30 1.09

LAS-A2 70 96 26 1.32 1.12

LAS-05 68 92 24 0.44 0.14

Figures 4a and 4b below show a long NNW – SSW section at different scales, containing the resource block model generated with the original drilling at

Marimaca on the right, and the recent drilling conducted in La Atómica and the sampled underground workings on the left; these in general present higher

copper grades than the drilling itself.

Figure 4a: La Atómica underground workings and drilling

Figure 4b: La Atómica underground workings and drilling (zoomed)

Phase II Program Upcoming Milestones

At La Atómica, due to the addition of 9 holes to test for the southwestern extension of mineralization, a potentially larger resource will take additional weeks

to estimate, however, this is still anticipated to be available in the first quarter of 2019.  Two RC drill rigs have moved to Atahualpa and first drill results are

anticipated in the coming weeks.  A third RC drill and the first diamond drill will arrive on site soon, ensuring that the Phase II program remains on track.

Sampling and Assay Protocol

True widths cannot be determined with the information available at this time. Coro RC holes were sampled on a 2 metre continuous basis, with dry samples

riffle split on site and one quarter sent to the Andes Analytical Assay preparation laboratory in Calama and the pulps then sent to the same company

laboratory in Santiago for assaying. A second quarter was stored on site for reference. Samples were prepared using the following standard protocol: drying;

crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-700g subsample to 95% passing -150#; and a 125g split of this sent for

assaying. All samples were assayed for CuT (total copper), CuS (acid soluble copper), CuCN (cyanide soluble copper) by AAS and for acid consumption. A

full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results. Pulps and sample rejects are

stored by Coro for future reference.

Underground samples were taken as 2 metres continuous chip channel samples in previously carefully cleaned surface walls. Both adit walls were sampled

by Coro personnel. The samples were transported to the Andes Analytical Assays (“AAA”) preparation laboratory in Calama. Samples were prepared and

assayed as for the drill samples. No standards, blanks or duplicates were employed. After sampling, underground workings were geologically mapped in

detail following a protocol adapted from that used for drill hole logging, with emphasis on mineralization and its structural and litohologic controls.

Figure 5: La Atómica intersections

Hole TD (m)   From To m %CuT Type

LAR-43 250  

72 90 18 0.37 Oxide

136 190 54 0.38 Oxide

LAR-44 300

  30 40 10 0.40 Oxide

  62 116 54 0.43 Oxide

including 64 72 8 0.72 Oxide

and 108 114 6 0.75 Oxide

  132 176 44 0.79 Oxide

including 150 176 26 1.24 Oxide

  182 228 46 1.49 Oxide

including 198 228 30 2.16 Oxide

232 258 26 2.05 Enriched-Mixed

258 294 36 0.41 Primary

LAR-45 350

  50 130 80 0.40 Oxide

including 52 70 18 0.64 Oxide

and 86 110 24 0.52 Oxide

148 158 10 0.34 Enriched

166 180 14 0.67 Enriched

LAR-46 190 No Significant Results

LAR-47 150   34 68 34 0.22 Oxide

LAR-48 150 No Significant Results

LAR-49 220

  18 78 60 0.47 Oxide

including 24 44 20 0.80 Oxide

  70 82 12 0.57 Oxide

  92 118 26 0.86 Mixed

including 92 108 16 1.23 Mixed

LAR-50 250  

54 68 14 0.71 Oxide

178 184 6 0.28 Oxide

LAR-51 210

  20 132 112 0.29 Oxide

including 104 126 22 0.46 Oxide

  178 196 18 0.35 Oxide

LAR-52 300

  224 238 14 0.31 Oxide

  254 296 42 0.41 Oxide

including 254 262 8 0.60 Oxide

and

266 272 6 0.73 Oxide

276 296 20 0.37 Oxide

LAR-53 160   84 110 26 0.67 Oxide

LAR-54 200 No Significant Results

LAR-55 200   70 78 8 0.67 Oxide

La Atómica intersections continued,

LAR-56 150 No Significant Results

LAR-57 200 No Significant Results

LAR-58 250   116 120 4 0.42 Oxide

  184 192 8 0.63 Enriched

LAR-59 250 No Significant Results

  10 26 16 0.51 Oxide

LAR-60 250 and 132 222 90 0.42 Oxide

including 138 186 48 0.55 Oxide

and 200 210 10 0.51 Mixed

LAR-61 300

  12 36 24 0.32 Oxide

including 118 124 6 0.52 Oxide

  146 156 10 0.42 Oxide

  240 248 8 0.51 Mixed

LAR-62 250  

76 96 20 0.36 Oxide

184 200 16 0.60 Mixed

LAR-63 250

  42 140 98 0.63 Oxide

including 50 66 16 0.77 Oxide

and 104 130 26 1.34 Oxide

  160 194 34 0.46 Mixed - Enriched

including 162 174 12 0.80 Mixed - Enriched

LAR-64 250

  2 18 16 0.34 Oxide

and

68 80 12 0.31 Oxide

224 230 6 0.40 Primary

LAR-65 250   4 30 26 0.57 Oxide

including 8 16 8 1.18 Oxide

LAR-66 300

  52 84 32 0.56 Oxide

including 62 72 10 1.28 Oxide

and 164 172 8 0.48 Primary

LAR-67 250 and 82 96 14 0.32 Oxide

LAR-68 350

  2 70 68 0.24 Oxide

including 2 24 22 0.28 Oxide

and

38 56 18 0.33 Oxide

62 70 8 0.31 Oxide

92 110 18 0.22 Oxide

LAR-69 300

  20 40 20 0.71 Oxide

and

48 70 22 0.50 Oxide

106 144 38 0.27 Oxide

166 192 26 0.36 Oxide

248 260 12 0.39 Enriched

Figure 6: La Atómica Drill Collars

Hole Easting Northing Elevation Azimuth Inclination Depth

LAR-43 374708.5 7435612.7 1090.8 310 -60 250

LAR-44 374704.7 7435599.5 1090.1 355 -60 300

LAR-45 374862.7 7435726.4 1103.8 265 -60 350

LAR-46 374593.4 7435657.6 1018.0 220 -60 190

LAR-47 374590.0 7435669.4 1017.6 310 -60 150

LAR-48 374455.0 7435795.8 993.3 310 -60 150

LAR-49 374709.7 7435464.3 1052.1 220 -60 220

LAR-50 374713.2 7435469.3 1052.3 310 -60 250

LAR-51 374619.6 7435517.9 1057.5 220 -60 210

LAR-52 374616.2 7435522.4 1057.2 310 -60 300

LAR-53 374538.1 7435587.8 1026.0 220 -60 160

LAR-54 374536.2 7435591.5 1026.0 310 -60 200

LAR-55 374473.5 7435628.7 1004.6 220 -60 200

LAR-57 374388.9 7435713.8 953.5 220 -60 200

LAR-56 374355.9 7435866.4 956.2 310 -60 150

LAR-58 374709.3 7435857.4 1022.0 220 -60 250

LAR-59 374700.6 7435861.0 1021.7 310 -60 250

LAR-60 374724.9 7435739.7 1092.7 220 -60 250

LAR-61 374722.7 7435745.8 1092.5 310 -60 300

LAR-62 374661.5 7435806.7 1059.5 310 -60 250

LAR-63 374666.6 7435801.0 1059.8 220 -60 250

LAR-64 374663.3 7435670.3 1055.0 310 -60 250

LAR-65 374663.0 7435664.8 1055.0 220 -60 250

LAR-66 374596.0 7435731.2 1041.4 310 -60 300

LAR-67 374598.3 7435729.4 1041.3 220 -60 250

LAR-68 374614.4 7435517.8 1057.0 265 -60 350

LAR-69 374713.2 7435464.8 1052.1 265 -60 300

Qualified Persons

The technical information in this news release, including the information that relates to geology, drilling and mineralization of the Marimaca Phase I and II

exploration program was prepared under the supervision of, or has been reviewed by Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a

geologist with more than 36 years of experience and a member of the Colegio de Geologos de Chile and of the Institute of Mining Engineers of Chile, and who

is the Qualified Person for the purposes of NI 43-101 responsible for the design and execution of the drilling program.

Contact Information

For further information please visit www.coromining.com or contact:

Nicholas Bias, VP Corporate Development & Investor Relations

Office: +56 2 2431 7601

Cell: +44 (0)7771 450 679

Email: [email protected]

Forward Looking Statements

This news release includes certain “forward-looking statements” under applicable Canadian securities legislation.  These statements relate to future events or

the Company’s future performance, business prospects or opportunities. Forward-looking statements include, but are not limited to, statements regarding the

future development and exploration potential of the Marimaca Project. Actual future results may differ materially. There can be no assurance that such

statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking

statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates

that, while considered reasonable by Coro, are inherently subject to significant business, economic, competitive, political and social uncertainties and

contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and

estimates based on or related to many of these factors. Such factors include, without limitation: the inherent risks involved in the mining, exploration and

development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of

project delays or cost overruns or unanticipated excessive operating costs and expenses, uncertainties related to the necessity of financing, the availability of

and costs of financing needed in the future as well as those factors disclosed in the Company’s documents filed from time to time with the securities

regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and

Newfoundland and Labrador. Accordingly, readers should not place undue reliance on forward-looking statements. Coro undertakes no obligation to update

publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as

may be required by law.

Photos accompanying this announcement are available at: 

http://www.globenewswire.com/NewsRoom/AttachmentNg/099957bf-cbe8-4039-9630-627855a762f0

http://www.globenewswire.com/NewsRoom/AttachmentNg/99e734a9-1d57-4441-acdf-0cb9828fd309

http://www.globenewswire.com/NewsRoom/AttachmentNg/4301b446-e487-43b7-ab63-d3e410afb849

http://www.globenewswire.com/NewsRoom/AttachmentNg/05274275-11f1-405f-a55d-bed4a848e01e