Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MAI.V ·

Minera Alamos Intersects 127m of 0.81 g/t Gold Ending in Mineralization from Phase 1 Drilling at Santana Project, Sonora, Mexico

Drill Results

Minera Alamos Intersects 127m of 0.81 g/t Gold Ending in

Mineralization from Phase 1 Drilling at Santana Project,

Sonora, Mexico

Toronto, Ontario and Vancouver, British Columbia--(Newsfile Corp. - November 1, 2018) -

Minera Alamos Inc.

(TSX

V: MAI

)

(

the "Company" or

"Minera Alamos")

is pleased to report additional results from its Phase 1 drill program at the Santana

gold project, Sonora, Mexico.

Phase 1

Exploration

Highlights:

Latest

Hole S18-1

2

3 - 127 m of 0.81 g/t Au

- Along with S18-123/124, holes S18-116/117/118/119 (previously reported)

delineated broad zones of near surface mineralized extensions of the Nicho Main deposit trending southwest of previous

historical drilling.

Other highlights included 93.5 m of 0.63 g/t Au (S18-116) and 80.4 m of 1.05 g/t Au (S18-117).

Holes S18-123/124 which tested the SW limits of the Nicho Main zone both ended within the mineralized

horizo

n

(approximately 150m down hole at 45-degree dip) and indicate potential for deep mineralization extensions that

were not considered in previous exploration programs.

New Discovery Hole S18-12

1

- 96 m of 1.47 g/t

AuEq

- First hole drilled into a new zone of gold/silver/copper

mineralization (Divisadero Zone) located approximately 200m north of the previously known limits at the Nicho Main/Norte

Zones.

Subsequent surface mapping has confirmed that the new area appears to be open for expansion in all directions.

Discovery of New Nicho-Style Gold Structure (

Zata

Zone)

- Over a surface area of approximately 400m x 400m, sixty-

six (66) rock samples were assayed with 50% exhibiting grades suitable for heap leaching (>0.10 g/t Au).

"The Phase 1 program at the Santana gold project has been an overwhelming success," states Darren Koningen, CEO of

Minera Alamos.

"With the first significant exploration activity on the project since 2011 we have been able to demonstrate that

the Nicho Main zone remains open for further expansion.

In addition, our ongoing efforts to better understand the geological

controls on gold mineralization that occur throughout the property have already been validated by the discovery of the new

Divisadero and Zata zones.

It is becoming increasingly evident that the mineralizing events that occurred in the Nicho area are

present at shallow depths elsewhere on our extensive property holdings.

Once we complete the final compilation of the current

data we look forward to the initiation of a Phase 2 drilling program."

Table 1 -

Nicho Zone

Drilling Results Summary Table

Mineralized Interval

1,2

Composite Interval

3

Drill Hole

From (m)

To

(m)

Width

(m)

Gold (g/t)

Width

(m)

Gold

(g/t)

Area

S18-114

14.0

29.5

15.5

0.27

Nicho Satellite

And

66.2

81.1

14.9

1.40

And

107.2

117.0

9.8

0.65

And

145.5

172.0

26.5

0.21

S18-115

8.2

26.0

17.8

0.73

Nicho Satellite

And

61.0

73.8

12.8

0.17

And

123.9

129.5

5.6

0.24

S18-116

2.0

95.5

93.5

0.65

60.0

0.97

Nicho

S18-117

19.3

99.7

80.4

1.05

42.0

1.96

Nicho

S18-118

2.5

10.5

8.0

1.0

Nicho

And

48.5

73.0

24.5

0.81

And

90.0

103.6

13.6

0.29

S18-119

1.3

10.7

9.4

0.14

Nicho

And

20.5

34.9

14.4

0.33

And

77.9

82.5

4.6

0.25

S18-120

Hole abandoned due to faulting

Nicho Norte

S18-122

5

No significant mineralization

Nicho Norte

S18-123

4

23.2

150.5

127.3

0.81

63.7

1.55

Nicho

S18-124

4

8.5

38.5

30.0

0.23

Nicho

And

85.5

160.0

74.5

0.32

Notes:

1

.

Grades/widths of mineralized intervals represent complete "from" "to" drill depths as shown.

2

.

All holes (with the exception of S18-122 which was drilled vertically) were drilled at 45-70 degree inclinations designed to

be roughly perpendicular to the understood dip of mineralized structures based on the current understanding of the

geological structures.

The true widths of the mineralized zones in these areas are currently unknown.

3

.

Grade/width of composite intervals is a total of all mineralized intervals that have gold grades equal to or in excess of

"typical" open-pit mining heap leach cut-off grades of 0.15 g/t gold.

4

.

Hole ended in mineralization

5

.

Hole S18-122 was redrilled vertically in the same location as S18-120 which was abandoned.

Table

2

-

Divisadero Porphyry Discovery Hole

Mineralized Interval

1,2

Drill Hole

From

(m)

To

(m)

Width

(m)

Gold

(g/t)

Silver

(g/t)

Copper

(%)

Gold Eq

3

(g/t)

Area

S18-

121

32.0

127.7

95.7

0.85

9.8

0.33

1.47

Divisadero

incl

55.0

125.0

70.0

1.10

11.8

0.56

1.88

Notes:

1

.

Grades/widths of mineralized intervals represent complete "from" "to" drill depths as shown.

2

.

The hole was drilled at a 70-degree inclination.

The true width of the mineralized zone in this new area is currently

unknown.

3

.

Gold Equivalent calculated using the following metal prices - $1250/oz gold, $16/oz silver and $2.85/lb copper.

Figure 1 - Drill Hole Location Map

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/4183/40786_b409c011d46eaa84_002full.jpg

All diamond drill samples were collected by Minera Alamos personnel including the Company's exploration geologists.

Drill core

samples were cut in half and divided into 1-2 m intervals.

One half of the sample was bagged for analysis and the remaining half

was logged by Minera Alamos personnel and stored for future reference.

Blanks, duplicates, and standards were randomly

inserted with the samples sent for analysis as part of the normal QA/QC procedures.

All samples were prepared and analyzed for gold using fire assaying with AA/gravimetric finish.

All samples were sent for

sample preparation at the ALS-Chemex facility in Hermosillo, Mexico.

Figure

2

-

Santana Overview Map

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/4183/40786_b409c011d46eaa84_003full.jpg

Mr. Darren Koningen, P. Eng., Minera Alamos' CEO, is the Qualified Person responsible for the technical content of this press

release under National Instrument 43-101. Mr. Koningen has supervised the preparation of, and has approved the scientific and

technical disclosures in this news release.

For

f

urther

i

nformation

p

lease

c

ontact:

Minera Alamos Inc.

Doug Ramshaw, President

Tel: 604-600-4423

Email:

[email protected]

Website:

www.mineraalamos.com

About Minera Alamos

Minera Alamos is an advanced-stage exploration and development company with a growing portfolio of high-quality Mexican

assets, including the La Fortuna open-pit gold project in Durango with positive PEA completed, the Santana open-pit heap-

leach development project in Sonora with test mining and processing completed and the Guadalupe de Los Reyes open-pit

gold-silver project in Sinaloa with mine planning in progress.

The Company is awaiting the pending approval of permit

applications related to the commercial production of gold at both the Santana and Fortuna projects.

The Company's strategy is to develop low capex assets while expanding the project resources and pursue complementary

strategic acquisitions.

Caution Regarding Forward-Looking Statements

This news release may contain forward-looking information and Minera Alamos cautions readers that forward-looking

information is based on certain assumptions and risk factors that could cause actual results to differ materially from the

expectations of Minera Alamos included in this news release. This news release includes certain "forward-looking statements",

which often, but not always, can be identified by the use of words such as "believes", "anticipates", "expects", "estimates",

"may", "could", "would", "will", or "plan". These statements are based on information currently available to Minera Alamos and

Minera Alamos provides no assurance that actual results will meet management's expectations. Forward-looking statements

include estimates and statements with respect to Minera Alamos' future plans with respect to the Projects, objectives or goals, to

the effect that Minera Alamos or management expects a stated condition or result to occur and the expected timing for release

of a resource and reserve estimate on the Projects. Since forward-looking statements are based on assumptions and address

future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results relating to, among

other things, results of exploration, the economics of processing methods, project development, reclamation and capital costs of

Minera Alamos' mineral properties, the ability to complete a preliminary economic assessment which supports the technical and

economic viability of mineral production could differ materially from those currently anticipated in such statements for many

reasons. Minera Alamos' financial condition and prospects could differ materially from those currently anticipated in such

statements for many reasons such as: an inability to finance and/or complete an updated resource and reserve estimate and a

preliminary economic assessment which supports the technical and economic viability of mineral production; changes in general

economic conditions and conditions in the financial markets; changes in demand and prices for minerals; litigation, legislative,

environmental and other judicial, regulatory, political and competitive developments; technological and operational difficulties

encountered in connection with Minera Alamos' activities; and other matters discussed in this news release and in filings made

with securities regulators. This list is not exhaustive of the factors that may affect any of Minera Alamos' forward-looking

statements. These and other factors should be considered carefully and readers should not place undue reliance on Minera

Alamos' forward-looking statements. Minera Alamos does not undertake to update any forward-looking statement that may be

made from time to time by Minera Alamos or on its behalf, except in accordance with applicable securities laws.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN

THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY

OF THIS RELEASE.