Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LXM.V ·

Vancouver, British Columbia, V6C 3L6

Mergers & Acquisitions

200 Burrard Street, Suite 1680

Vancouver, British Columbia, V6C 3L6

Tel: (604) 678-5308

www.BlueBirdbatterymetals.com

BlueBird Battery Metals to Acquire Ashburton Cobalt Project in Prospective

Talga Fault Zone and Increases Australian Cobalt Portfolio to 518 km2

Vancouver, British Columbia, June 12, 2018 – BlueBird Battery Metals Inc. (TSXV: BATT;

US:BBBMF) (the “Company” or “BlueBird”) is pleased to announce that it has entered into a

binding letter of intent ( “LOI”) to acquire 100% of the rights, title and interest in the granted

exploration licences of the Ashburton Cobalt Project (“Ashburton”), located 100 km southwest

of Paraburdoo, Western Australia (Refer to Figure 1), from Peter Romeo Gianni (the “Vendor”).

“We are excited to add another Co-Mn project to our portfolio in Western Australia that not only

delivers well above industry standard Co grades, but has the potential to yield simpler metallurgy,

noting the cobalt is hosted by manganese. Another key reason we selected th e Ashburton, other

than the style and grade of deposit, is the Western Australia location, which is known globally as

where mining projects can be fast tracked to production, and dramatically quicker than North

America. Mineral projects are significantly more valuable the sooner the product reaches the end

user or market,” commented Alf Stewart, President of BlueBird.

Highlights of Ashburton Cobalt Project:

• The 189 km2 tenement package increases BlueBird’s portfolio of cobalt focused projects

in Western Australia to 231 km2, and its total portfolio in Australia to 518 km2.

• Tenement controls more than 30 km of the Talga Fault Zone (“TFZ”), a major, northwest

trending litho-structural contact zone..

• Historical r econnaissance exploration results (surface rock chip samples) indicate

anomalous cobalt grades ranging from trace to 0.311%.

• References above and in Figure 2/3 below and to other companies ’ results, is for

information purposes only. The selected samples are not necessar ily representative of

mineralization at Ashburton and there are no assurances the Company will receive similar

results.

“Historical exploration at the Ashburton Cobalt Project indicates an opportunity for the discovery

of a near surface cobalt deposit , will play a key part in establishing BlueBird as a leader in the

exploration and advancement of cobalt project,” commented Peter A. Ball., Chairman and CEO

of BlueBird. “With four acquisitions in three months focused on building a portfolio of quality

cobalt projects, we are clearly providing a platform to build shareholder value for our

shareholders. We continue to review other battery metal projects to add to our portfolio and look

forward to delivering value through focused aggressive exploration programs.”

Ashburton Tenement Overview

The Ashburton Cobalt Project is comprised of three tenements, Capricorn, Jessice Bore and

Edmund, all located along the surface trace of the TFZ (Refer to Figure 2). The most advanced of

the three tenements, Jessica Bore, highlights multiple surface rock chip samples returning cobalt

2

grades greater than 0.1% Co (Refer to Figure 3). There are no assurances the Company will receive

similar results to the adjacent property

Fig 1: Ashburton Project Location Map

Project Geology

The Ashburton Cobalt Project covers the north-western extent of the Edmund Basin, a 4 km thick

suequence of siliciclastic and carbonate sedimentary rocks lying unconformably on rocks of the

Ashburton Basin, represented by the Wyloo Group, a 12 km thick SE trending sequence of

low-grade meta -sediments and meta -volcanic rocks. The Project is underlain by rocks of the

Capricorn Orogen, a major tectonic zone between the Archaen Yilgarn and Pilbara Cratons. The

Capricorn Orogeny deformed and metamorphosed the Ashburton Basin producing the dominant

NW-SE fold axis, shear and foliation trends and low grade metamorphism.

The dominant structural feature is the Talga Fault Zone ( “TFZ”) a major NW -SE trending fault

zone interpreted to represent a suture zone between the Ashburton and Gascoyne Complex, a

sequence of metasedimentary and meta-igneous rocks extensively intruded by large volumes

of granite, forming the basement for the Edmund Basin sedimentation.

Previous exploration of the tenements focused on extensive manganese mineralization, been traced

for over 60 km along the TFZ. Cobalt and Manganese mineralization is associated with a dolomitic

unit parallel to the TFZ. Surface rock chip samples have returned anomalous cobalt results, ranging

from trace to 0.31% (Refer to Table 1). There are no assurances the Company will receive similar

results.

3

Fig 2: Rock Chip Sample Results

Fig 3: Jessica Bore Prospect Cobalt Rock Chip Results

4

Table 1 – Selected Surface Rock Chip Results – Ashburton Project

Sample Easting Northing Ba ppm Co ppm Co % Cu ppm Mn % Mo ppm Ni ppm Zn ppm

109682 480684 7386325 3000 3110 0.31 1570 37.6 3.5 1480 1270

CAPR0461 513000 7365230 793 3060 0.31 210 16.7 0.5 986 1180

109691 479125 7387008 1090 2500 0.25 666 17.2 3.0 394 452

108542 477898 7389615 782 2300 0.23 1440 6.5 88.0 1660 331

CAPR0024 430184 7414361 65400 2150 0.22 712 25.6 0.0 0 696

109681 480702 7386075 853 2130 0.21 332 17.5 12.0 392 630

CAPR0042 434478 7412365 12600 1760 0.18 706 13.1 18.0 540 594

CAPR0068 446709 7413236 99 1670 0.17 998 11.8 4.0 3560 4840

109812 480680 7386330 983 1430 0.14 496 8.6 3.0 656 370

101504 477474 7389296 9400 1400 0.14 372 8.3 0.5 456 322

109687 479239 7386866 1920 1130 0.11 470 11.0 4.5 410 286

CAPR0437 480925 7385865 387 1090 0.11 196 0.9 3.0 528 634

CAPR0442 488470 7380690 47100 1050 0.11 8 21.2 1.0 22 82

Table 1 includes selected results from historical surface rock chip sampling of the Ashburton

Project. There are no assurances that the Company will be able to duplicate these results.

Please visit the website www.bluebirdbatterymetals.com for additional information, maps ,

sections, and assay tables related to the Ashburton Cobalt Project.

The technical content of this news release has been reviewed and approved Wes Hanson, P.Geo.,

a director of the Company a nd a Qualified Person pursuant to National Instrument 43 -101. The

qualified person has not yet visited the Ashburton Project, and therefore has not yet verified the

data disclosed, including sampling, analytical, and test data underlying the information or

opinions contained in the written disclosure.

LOI Terms

Under the terms of the LOI, which will be formalized by a definitive agreement among the parties,

the Company will purchase 100% of Ashburton by paying the Vendor CAD$25,000 and issuing

to the Vendor, over a two year period, common shares valued at CAD$1,500,000..

This transaction is subject to the acceptance of the TSX Venture Exchange.

The Company also announces that its press release dated June 7, 2018 incorrectly stated that

COMVERJ Pty Ltd was a finder. The correct finder is Lexcon Pty Ltd. No finder’s feeis payable

in respect of the Ashburton transaction.

About BlueBird Battery Metals

BlueBird Battery Metals (TSXV: BATT; US: BBBMF) is a Canadian publicly listed company

focused on the global exploration and development of strategic battery metals projects, primarily

cobalt and nickel. BlueBird’s goal is to pursue a business model that offers direct and long -term

leverage to the price appreciation in nickel and cobalt, two principal materials in EV batteries. The

Company plans to become a leader in the battery metals sector, as cobalt is currently in a global

supply deficit, has a vulnerable supply chain, and is part of an emerging sector with extraordinary

potential. BlueBird is advancing its portfolio of battery metals focused assets in Western Australia

5

and New South Wales, Australia, and in the Yukon, Canada, and is currently reviewing new

acquisition opportunities to add to the Company’s project portfolio.

On Behalf of the Board of BlueBird Battery Metals Inc.

Peter A. Ball

Chairman and CEO

For more information, please contact 1-855-584-0160 or [email protected].

This news release may contain or refer to forward-looking information based on current expectations, including, but

not limited to the Company acquiring an interest in properties controlled by Mr. Gianni, exploring its properties in

Australia or the Yukon, and the impact on the Company of these events, including the effect on the share prices.

Forward-looking information is subject to significant risks and uncertainties, as actual results may differ materially

from forecasted results. Forward-looking information is provided as of the date hereof and we assume no

responsibility to update or revise such information to reflect new events or circumstances.

Neither TSX Venture Exchange, the Toronto Stock Exchange nor their Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.