Sampling Confirms High-Grade, Surface-Level Cobalt at Ashburton, Western Australia
200 Burrard Street, Suite 1680
Vancouver, British Columbia, V6C 3L6
Tel: (604) 678‐5308
www.bluebirdbatterymetals.com
Sampling Confirms High-Grade, Surface-Level Cobalt at Ashburton, Western
Australia
Vancouver, British Columbia, February 22, 2019 – BlueBird Batte ry Metals Inc. (TSXV:
BATT; US:BBBMF) (the “ Company” or “ BlueBird”) is pleased to announce that initial
sampling at its Ashburton Cobalt Project (“ Ashburton”) in Western Australia, has returned
significant cobalt grades of up to 0.42% at surface, confirming the presence of high-grade
mineralization in multiple locations.
Highlights of Two-Phase Exploration Program:
Cobalt Grades and Location : Phase one reconnaissance sampling program has
encountered significant grades of cobalt mineralization in multiple locations, including up
to 0.421% (4,214 ppm) Co from surface rock chip sampling. This confirms high-grade
cobalt is present at the Ashburton project and the results at C apricorn demonstrate Cobalt
mineralization continues over a strike length of 15 km.
Further results to Come: Phase two is now underway to evaluate additional regional
prospects.
30 km Strike Length: Both phases are focused on a 30 km strike length that has been
identified along the prospective Talga Fault Zone.
Cobalt Correlation with Manganese: Cobalt mineralization at Ashburton displays a
strong correlation with manganese enrichment, with grades of up to 27.8%. This is of note
because manganese uses are similar to those of cobalt in the battery sector.
Nav Dhaliwal, Chairman and CEO of BlueBird, commented, “We are delighted by the cobalt
grades we have encountered over a large area at Ashburton, in Western Australia. Further
sampling is already underway and will focus on a number of additional prospects during the
second phase of field work. The scale of the targets across our extensive land holdings is becoming
increasingly clear and is very encouraging. This is an under-explored region and we are looking
forward to advancing our exploration activity.”
200 Burrard Street, Suite 1680
Vancouver, British Columbia, V6C 3L6
Tel: (604) 678‐5308
www.bluebirdbatterymetals.com
2
Figure 1: Outcropping Cobalt-Manganese Mineralization
200 Burrard Street, Suite 1680
Vancouver, British Columbia, V6C 3L6
Tel: (604) 678‐5308
www.bluebirdbatterymetals.com
3
Figure 2: Location Plan of Project in Western Australia
200 Burrard Street, Suite 1680
Vancouver, British Columbia, V6C 3L6
Tel: (604) 678‐5308
www.bluebirdbatterymetals.com
4
Figure 3: Recent and Historical Rock Chip Samples
Please visit the website www.bluebirdbatterymetals.com for additional information, maps,
sections, and assay tables related to the Ashburton Cobalt Project.
Table 1: Recent Rock Chip Sampling Results and Location Information
Sample Easting North Co ppm Cu ppm Fe % Mn% Ni ppm Zn ppm
CAPR042 434,478 7,412,365 4214 935 15.28 11.978 546 569
CAPR024B 430,184 7,414,361 2095 735 1.02 27.815 92 841
CAPR024A 430,184 7,414,361 1333 452 2.42 20.72 61 516
CAPR0442 488,470 7,380,690 924 X 3.5 22.006 26 93
109682 480,684 7,386,325 646 385 38.6 5.5351 925 815
CAPR0437 480,925 7,385,865 467 139 5.37 4.1811 396 384
CAPR0461 513,000 7,365,230 247 35 43.2 0.4721 598 2428
109681 480,702 7,386,075 185 173 5.78 1.7243 47 57
109687 479,239 7,386,866 153 136 22.94 1.6214 256 304
109691 479,125 7,387,008 152 125 10.67 1.2949 135 158
200 Burrard Street, Suite 1680
Vancouver, British Columbia, V6C 3L6
Tel: (604) 678‐5308
www.bluebirdbatterymetals.com
5
About Ashburton Cobalt Project
Ashburton consists of four exploration licences located 450 km south of Karratha and 950
km north of Perth in the Pilbara region of Western Australia
Cobalt-Manganese mineralization at the Ashburton Cobalt Project is hosted within a
dolomitic unit, which extends along the Talga Fault Zone (“TFZ”).
Manganese mineralization has been identified over 60 km along the TFZ
The four Project area tenements in aggregate cover over 30 km of the TFZ.
Anomalous manganese-cobalt values have been returned at numerou s locations within
each of the four tenements comprising the Project.
The TFZ transects the Project and appears to have acted as a major basin-margin or growth
fault, controlling sedimentary deposition and basin development.
The technical content of this news release has been reviewed an d approved Wes Hanson, P.Geo.,
a director of the Company and a Qualified Person pursuant to Na tional Instrument 43-101. The
qualified person has not yet visited the Ashburton Project, and therefore has not yet verified the
data disclosed, including sampling, analytical, and test data underlying the information or opinions
contained in the written disclosure.
About BlueBird Battery Metals
BlueBird Battery Metals (TSXV: BATT; US: BBBMF) is a Canadian publicly listed company
focused on the global exploration and development of strategic battery metals projects, primarily
cobalt and nickel. BlueBird’s goal is to pursue a business mode l that offers direct and long-term
leverage to the price appreciation in nickel and cobalt, two principal materials in EV batteries. The
Company plans to become a leader in the battery metals sector, as cobalt is currently in a global
supply deficit, has a vulnerable supply chain, and is part of an emerging sector with extraordinary
potential. BlueBird is currently advancing a portfolio of battery metals focused assets in in Western
Australia and reviewing new acquisition opportunities to add to the Company’s project portfolio.
On Behalf of the Board of BlueBird Battery Metals Inc.
Nav Dhaliwal
Chairman and CEO
For more information, please contact 1-855-584-0160 or [email protected].
This news release may contain or refer to forward-looking information based on current expectations, including, but
not limited to the Company achieving success in exploring its properties and the impact on the Company of these
events, including the effect on its sh are price. Forward-lookin g information is subject to significant risks and
uncertainties, as actual results may differ materially from forecasted results. Forward-looking information is provided
as of the date hereof and we assume no responsibility to up date or revise such information to reflect new events or
circumstances. References to other issuers with nearby projects is for information purposes only and there are no
assurances the Company will achieve similar results.
200 Burrard Street, Suite 1680
Vancouver, British Columbia, V6C 3L6
Tel: (604) 678‐5308
www.bluebirdbatterymetals.com
6
Neither TSX Venture Exchange, the Toronto Stock Exchange nor their Regulation Services Provider (as that term is
defined in the policies of the TSX Ve nture Exchange) accepts responsibility for the adequacy or accuracy of this
release.