BlueBird Commences Exploration at the Ashburton Cobalt Project, Western Australia
200 Burrard Street, Suite 1680
Vancouver, British Columbia, V6C 3L6
Tel: (604) 678‐5308
www.BlueBirdbatterymetals.com
BlueBird Commences Exploration at the Ashburton Cobalt
Project, Western Australia
Vancouver, British Columbia, November 14, 2018 – BlueBird Batte ry Metals Inc. (TSXV: BATT;
US:BBBMF) (the “Company” or “ BlueBird”) is pleased to announce that the initial exploration of its
100%-owned Ashburton Project is commencing. The Ashburton Project, located 315 km south of Karratha
and 950 km north of Perth in Western Australia (Ref. Figure 1), is comprised of four tenements (189 km2),
located along the highly prospective Talga Fault Zone (“TFZ”). The tenements include over 30 km of strike
length along the TFZ where historical surface sampling returned anomalous cobalt values greater than
0.10% Co associated with extensive manganese mineralization tha t extends for over 60 km along the TFZ
(Ref. Table 1). The manganese mineralization was the focal poin t of historical sampling programs but the
presence of cobalt mineralization offers significant exploration upside.
The first phase of exploration will consist of ground reconnais sance mapping and sampling focused on
areas where historical surface sa mple results, collected by oth ers, yielded highly anomalous cobalt values
(Ref. Table 1 and Figure 2). Reconnaissance-scale mapping and s ampling will be undertaken to evaluate
selected target areas to verify the historical results. In addi tion, the Company plans to collect a number of
15-30 kg samples that will be analyzed using acid leach analyti cal methods to evaluate the recoverability
of the cobalt-manganese mineralization.
Table 1 - Selected Surface Rock Chip Results – Ashburton Project
Sample Easting Northing Ba ppm Co ppm Co % Cu ppm Mn % Mo ppm Ni ppm Zn ppm
109682 480684 7386325 3000 3110 0.31 1570 37.6 3.5 1480 1270
CAPR0461 513000 7365230 793 3060 0.31 210 16.7 0.5 986 1180
109691 479125 7387008 1090 2500 0.25 666 17.2 3.0 394 452
108542 477898 7389615 782 2300 0.23 1440 6.5 88.0 1660 331
CAPR0024 430184 7414361 65400 2150 0.22 712 25.6 0.0 0 696
109681 480702 7386075 853 2130 0.21 332 17.5 12.0 392 630
CAPR0042 434478 7412365 12600 1760 0.18 706 13.1 18.0 540 594
CAPR0068 446709 7413236 99 1670 0.17 998 11.8 4.0 3560 4840
109812 480680 7386330 983 1430 0.14 496 8.6 3.0 656 370
101504 477474 7389296 9400 1400 0.14 372 8.3 0.5 456 322
109687 479239 7386866 1920 1130 0.11 470 11.0 4.5 410 286
CAPR0437 480925 7385865 387 1090 0.11 196 0.9 3.0 528 634
CAPR0442 488470 7380690 47100 1050 0.11 8 21.2 1.0 22 82
Table 1 includes selected results from historical surface rock chip sampling of the Ashburton Project. There
are no assurances that the Company will be able to duplicate these results.
2
Figure 1 - Ashburton Project Location Map
Figure 2 - Historical Rock Chip Sample Results
3
“The Company is eager to begin this initial phase of exploration at Ashburton. Emerging technological
advancements in sulfuric acid leaching of mangan ese cobalt mineralization elsewhere in Australia is
demonstrating considerable potential for robust recoveries producing a low cost, manganese - cobalt
sulphate product. This initial exploration work, in addition to confirming and expanding the historical
anomalous cobalt grades, will provide sufficient sample material to perform bench-scale metallurgical
testing to confirm the viability of sulfuri c leaching of the Ashburton mineralization,” commented Gary
Nassif, President of BlueBird.
About the Ashburton Project
Cobalt and manganese mineralization occurs largely within a 4-k m thick sequence of sediments and
dolomites paralleling the NW trend of the TFZ. The TFZ is a regional-scale structural suture zone between
the meta-sedimentary and meta-volcanic rocks of the Ashburton Basin with the meta-sedimentary and meta-
igneous rocks of the Gascoyne Complex.
Historical surface rock geochemical sampling completed by others was focused on evaluating the extensive
manganese mineralization within the sediments and dolomites paralleling the TFZ. This sample population
was not extensively assayed for cobalt until late in the history of the Project. The limited amount of samples
assayed for cobalt returned values ranging from trace to 0.311% (Ref. Table 1). The initial exploration
program will focus largely on the Jessica Bore tenements (Ref. Figure 2), where historical sampling
returned the highest number of anomalous cobalt values. The Co mpany anticipates receiving results from
this initial phase of exploration by the end of 2018.
“The commencement of field-ba sed exploration across the Ashburton Cobalt-Manganese Project
represents the first campaign undertaken across the property that specifically targets the cobalt potential.
Cobalt results returned to date from the property are extremely encouraging and our goal with this initial
phase of exploration work is to delineate the scale-potential of these targets,” commented Nav Dhaliwal,
CEO of BlueBird.
The technical content of this news release has been reviewed an d approved Wesley Hanson, P.Geo., a
director of the Company and a Qualified Person pursuant to Nati onal Instrument 43-101. The qualified
person has not yet visited the Ashburton Project and therefore has not yet verified the data disclosed,
including sampling, analytical, and test data underlying the information or opinions contained in the written
disclosure.
About BlueBird Battery Metals
BlueBird Battery Metals (TSXV: BATT; US: BBBMF) is a Canadian publicly listed company focused
on the exploration and developmen t of strategic battery metals projects, primarily cobalt and nickel.
BlueBird’s goal is to pursue a business model that offers direc t and long-term leverage to the price
appreciation in nickel and cobalt, two principal materials in EV batteries. The Company plans to become a
leader in the battery metals sector as cobalt is currently in a global supply deficit, has a vulnerable supply
chain, and is part of an emerging sector with extraordinary potential. BlueBird is advancing its portfolio of
battery metals-focused assets in Western Australia and is currently reviewing new acquisition opportunities
to add to the Company’s project portfolio.
On Behalf of the Board of BlueBird Battery Metals Inc.
Nav Dhaliwal
Chief Exeuctive Officer
4
For more information, please contact 1-855-584-0160 or [email protected].
This news release may contain or refer to forward-looking information based on current expectations, including, but
not limited to the Company achieving success in exploring its properties and the impact on the Company of these
events, including the effect on its share price. Forward- looking information is subj ect to significant risks and
uncertainties, as actual results may differ materially from forecasted results. Forward-looking information is provided
as of the date hereof and we assume no responsibility to up date or revise such information to reflect new events or
circumstances. References to other issuers with nearby projects is for information purposes only and there are no
assurances the Company will achieve similar results.
Neither TSX Venture Exchange, the Toronto Stock Exchange nor their Regulation Services Provider (as that term is
defined in the policies of the TSX Ve nture Exchange) accepts responsibility for the adequacy or accuracy of this
release.