Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LWR.V ·

Equitorial’s Gravity Results Inspire Acquisition of Entire Tule Valley Lithium Basin

Exploration Programs Sampling & Geoscience Results

THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT FOR DISSEMINATION IN THE

UNITED STATES OR FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES

Equitorial’s Gravity Results Inspire Acquisition of Entire Tule Valley Lithium Basin

Vancouver, BC, Canada – May 23, 2017 – Equitorial Exploration Corp. (TSX -V: EXX, Frankfurt: EE1, OTCQB:

EQTXF) (“Equitorial” or “Company”) is pleased to report the completion of a ground geophysics survey on its

100% owned Tule Valley Lithium project in Utah.

Highlights

1. The gravity results demonstrate that the Tule Valley fill has a depth of over 500 meters in the western

portion of the property. To view the gravity results, please visit: http://equitorialexploration.com/gallery/

2. The valley fill deepens further than 500 meters heading east from the current claim blocks.

3. To maximize the potential for the Company, Equitorial has acquire d an additional 135 claims totaling

2,700 acres. The Company has now staked the entire Tule Valley Brine Property for a total holding of 6,900

acres. To view the claim extension, please visit: http://equitorialexploration.com/gallery/

4. This season Equitorial will conduct a drill program to test lithium concentrations in brine at different

depths and locations in the Tule Valley Basin.

Gravity Survey Methodology

The survey was completed by Zonge International Inc. during April 2017. A total of 511 unique grid stations were

acquired covering a grid area of approximately 20 km 2 with 200 meter station spacing. Field gravity data was

merged with 52 regional public domain gravity stations. Elevations were obtained from real -time kinematic and

post-processed GPS.

Tule Valley Lithium Brine Project

The property comprises 6,900 acres and is located approximately 190 km south west of Salt Lake City, Utah and is

road accessible.

Tule Valley is a closed basin. In a closed basin the surface water and groundwater flowing into the basin ha ve no

escape route, and evaporate at surface leaving behi nd minerals dissolved in the resulting brines and evaporation

pools. Tule Valley is mostly a dry lake bed (playa), but it hosts active evaporation pools along its western margin.

In August, 2016, 4 water samples and 13 soil samples were collected from the Tule property - most at claim post

sites located on exposed playa. The samples of actively evaporating briny surface muds are all anomalous in

Lithium (over 0.01% Li) with samples as high as 200 ppm Li. Each anomalous sample is very wet, saturated with

salty brine and contains salt and/or gypsum crystals.

Tule Valley is located within an area which hosts several lithium -bearing hard rock properties which may have

provided lithium to groundwaters.

• 20 km to the north is the Redhill Resources Corp.'s Honey Comb beryllium -rubidium-lithium-rare-earth

project. Redhill’s NI 43-101 (Sept. 30, 2011) reports that initial surface sampling provided assays of 1,500

to 1,700 parts per million lithium.

• 60 km to t he southeast is Crystal Peak Minerals Inc.'s potash -lithium-magnesium brine project. Crystal

Peak's NI 43 -101 (Nov. 18, 2013) reports lithium values in solution (brine) range from 50 to 200

milligrams/litre. Crystal Peak is an evaporite basin similar to Tule Valley.

• 30 km to the northeast is Materion Corp.'s Spor Mountain beryllium mine

The Tule Valley prospect may be similar to that of Clayton Valley, Nevada, as they are both closed basins with signs

of active and historic evaporation. The Tule Valley pro ject requires further exploration, including geophysics and

drilling, to evaluate potential for a mass lithium brine deposit.

Technology

The company has entered into a number of discussions with parties which have had extensive experience with, or

whose main operating business includes, the separation of metals and physical particulate from water, recycled

water, and oil and gas waste water. The company hopes to conclude an agreement to test these processes and

methods for commercial-scale application.

About Equitorial Exploration Corp

Equitorial is aggressively developing three significant, 100% -owned, high -potential, lithium projects in North

America.

The Little Nahanni Pegmatite Group (LNPG) is a 43 -101 compliant, hard rock, lithium property in the NWT. Both

the Tule and Gerlach Lithium Brine Projects are located in lithium -rich Utah and Nevada within easy reach of the

Tesla Gigafactory #1.

All three projects have demonstrated highly encouraging grades and Equitorial intends to actively explore these

Lithium opportunities.

Phil van Angeren, P. Geo., a Qualified Person as defined by National Instrument 43 -101, has reviewed and verified

the technical mining information provided in this release.

For more information please visit: http://equitorialexploration.com/

On behalf of the Board of Directors

EQUITORIAL EXPLORATION CORP.

Jack Bal, CEO and Director

For further information, please contact Jack Bal at 604-306-5285

FORWARD LOOKING STATEMENTS: This news release contains certain forward -looking statements within the meaning of Canadian securities laws,

including statements regarding the Tule, Gerlach and Little Nahanni Pegmatite Project : statements pertaining to the ability of Equitorial Exploration

Corp.(“EXX”); the potential to develop resources and then further develop reserves; the anticipated economic potential of the property; the

availability of capital and finance for EXX to execute its strategy going forward. Forward -looking statements are based on estimates and assumptions

made by EXX in light of its experience and perception of current and expected future developments, as well as other facto rs that EXX believes are

appropriate in the circumstances. Many factors could cause EXX ’s results, performance or achievements to differ materially from those expressed or

implied by the forward looking statements, including: discrepancies between actual a nd estimated results from exploration and development and

operating risks, dependence on early exploration stage concessions; uninsurable risks; competition; regulatory restrictions, including environmental

regulatory restrictions and liability; currency f luctuations; defective title to mineral claims or property and dependence on key employees. Forward -

looking statements are based on the expectations and opinions of the Company’s management on the date the statements are made . The

assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and,

as such, undue reliance should not be placed on forward -looking statements. The Company expressly disclaims any intention or obligation to update

or revise any forward-looking statements whether as a result of new information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Ven ture Exchange)

accepts responsibility for the adequacy or accuracy of this release.