Lake Winn Provides Update with Respect to Its Private Placement and a Corporate Update ON Its Cloud Project, Flin Flon GOLD Belt, Manitoba
LEGAL_44704683.2
THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES FOR DISSEMINATION IN THE
UNITED STATES
LAKE WINN PROVIDES UPDATE WITH RESPECT TO ITS PRIVATE PLACEMENT AND A
CORPORATE UPDATE ON ITS CLOUD PROJECT, FLIN FLON GOLD BELT, MANITOBA
Vancouver, British Columbia – August 23, 2024 – Lake Winn Resources Corp. (TSXV: LWR, FSE: EE1A) (the
“Company”) announces, further to its news release of July 30, 2024, that the Company has received an
extension from the TSX Venture Exchange (the “TSXV”) to close its non brokered private placement (the
“Offering”) on or before September 20, 2024.
The Offering has been reduced from 70,000,000 units of the Company (the “ Units”) to 40,000,000 Units
at a price of $0.05 per Unit for gross proceeds of up to $2,000,000. Each Unit will consist of one common
share in the capital of the Company (a “Share”) and one Share purchase warrant (a “ Warrant”). Each
Warrant will be exercisable to purchase an additional Share (a “ Warrant Share”) at an exercise price of
$0.08 per Warrant Share for a period of 24 months after the date of issuance.
The Company closed tranche one of the Offering on June 25, 2024 (3,680,000 Units for gross proceeds of
$184,000) and tranche two of the Offering closed on July 30, 2024 (1,200,000 Units for gross proceeds of
$60,000). The Company expects to close one or mo re tranches of the Offering on or before September
20, 2024.
Closing of the Offering is subject to a number of conditions, including receipt of all necessary corporate
and regulatory approvals. All securities issued in connection with the Offering will be subject to a statutory
hold period of four months plus a day from the date of issuance in accordance with appl icable securities
laws.
The Company may pay finder’s fees on the Offering within the amount permitted under the policies of
the TSXV.
Updated Use of Proceeds
Assuming completion of the Offering in full, the Company has updated its use of proceeds and intends to
use the net proceeds from Offering as follows: (i) up to $ 750,000 on exploration expenditures for the
Company’s Cloud Project1 and (ii) up to $1,250,000 for general working capital and administrative
expenses.
About the Cloud Project and Proposed Work
1 Originally, the Company had proposed to use a portion of the net proceeds for exploration of the Company’s Little
Nahanni Pegmatite Project.
LEGAL_44704683.2
The Company acquired the Cloud Project on September 16, 2020 from W.S. Ferreira Ltd. The Company’s
gold exploration Cloud Project is located in the province of Manitoba, in the Flin Flon Gold Belt
approximately 40 kilometers northeast of the town of Flin-Flon. Access to the property is via Highway 10
to the all-weather Kississing Lake Road. Manitoba is a mining friendly jurisdiction with a long track record
of gold production. The Cloud project is road accessible which greatly reduces the costs associated with
exploration and development. The Project can be worked all year round. A current work permit is in place
which includes mechanized disturbances (drilling and trenching).
The Cloud project is located within the Flin Flon Metallogenic gold belt. The gold belt contains orogenic
gold deposits with the largest being Hudson Bay’s Snow Lake Mine.
Historic grab rock samples have returned high gold grades of up to 122 g/t Au. Historic channel sampling
has returned grades of up to 88 g/t Au over 1.0 meters.
Highlights from the Company’s first drill program in 2020/21 are:
• Eight core drill holes for a total of 1,663 meters;
• Visible gold verified by assays;
• Best intercepts 1m @ 17.3g/t Au; 1m @ 10.2 g/t Au;2
• Au intercepts in drill holes spaced up to 175m apart;
• Drilling testing a 300m long prospect defined by surface pits containing gold;
• The gold package is hosted in a distinct mafic/magnetic unit with the gold hosted in structurally
controlled veins;
• Geophysical surveys to date map the gold bearing rock units well and provide additional targets
for testing under cover;
• The exposed geology in conjunction with the corresponding geophysical signatures indicating a 4
km strike length provide enough geographic distance to host a reasonable size gold deposit; and
• A significant new gold find in the Flin Flon Belt.
The Cloud Project is a project of merit and further drilling is required to expand the discoveries to date.
Corporate Update
On July 12, 2023, the Company announced a potential spin-out of the Company’s Cloud Project and Quartz
Property. Given the Company’s current focus on the Cloud Project, the Company will not be proceeding
with the proposed spin-out.
About Lake Winn
Lake Winn Resources Corp. is a mineral exploration company focused on advancing the 100% owned Little
Nahanni Pegmatite project located in the Northwest Territories near the Yukon Border. The project covers
9682.5 hectares that includes a major portion of a 13 km-long, and up to 500 m wide, lithium, cesium, and
2 For further details, see the Company’s news release dated February 23, 2021, a copy of which is filed under the
Company’s SEDAR+ profile at www.sedarplus.ca.
LEGAL_44704683.2
tantalum pegmatite dyke swarm. The project has had historic drilling and channel sampling that confirm
significant lithium, tantalum, cesium, and tin.
The technical information in this news release was prepared under the supervision of Buddy Doyle B.App
Sc Geology, MAUSIMM. Mr. Doyle is a Qualified Person for the purposes of National Instrument 43-101 -
Standards of Disclosure for Mineral Projects and has reviewed and approved the technical information
disclosed in this news release.
This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities
in the United States. The securities have not been and will not be registered under the United States
Securities Act of 1933, as amended (the “U.S. Securities Act”) or any state securities laws and may not be
offered or sold within the United States or to U.S. persons unless registered under the U.S. Securities Act
and applicable state securities laws or an exemption from such registration is available.
ON BEHALF OF THE BOARD OF DIRECTORS OF LAKE WINN RESOURCES CORP.
Patrick Power
President, CEO & Director
Lake Winn Resources Corp.
Telephone: (604) 218-8772
www.lakewinn.ca
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-looking Statements: Certain statements in this news release are “forward-looking statements”
which reflect the Company’ s current expectations and projections about future events and financial
trends that it believes might affect its financial condition, results of operations, business strategy and
financial needs. In some cases, these forward -looking statements can be identifi ed by words or phrases
such as “may”, “might”, “will”, “expect”, “anticipate”, “estimate”, “intend”, “plan”, “indicate”, “see k”,
“believe”, “estimates”, “predicts” or “likely”, or the negative of these terms, or other similar expressions
intended to identify forward-looking statements. Whether actual results, performance or achievements
will conform to the Company ’s expectations and predictions is subject to a number of known and
unknown risks, uncertainties, assumptions and other factors, including without limitation, delays resulting
from or inability to obtain applicable regulatory approval for the Offering , the Offering being fully
subscribed, and completion of an exploration program on the Cloud Lake Project are forward-looking
statements that involve various risks and uncertainties . Investors should not place undue reliance on
forward-looking information. Important factors that could cause actual results to differ materially from
the Company’s expectations include actual exploration results, results of future resource estimates, future
metal prices, availability of capital and financing on acceptable terms, general economic, market or
business conditions, uninsured risks, regulatory changes, defects in title, availability of personnel,
materials and equipment on a timely basis, accidents or equipment breakdowns, delays in receiving
government approvals, unanticipated environmental impacts on operations and costs to remedy same,
and other exploration or other risks detailed herein and from time to time in the filings made by the
Company with securities regulators. The forward-looking information contained herein is made as of the
LEGAL_44704683.2
date hereof and is not obligated to update or revise any forward-looking information, whether as a result
of new information, future events or otherwise, except as required by applicable securities laws.