Equitorial Exploration Extends Lithium Mineralization at Cat Lake Drills 10.6m of 1.50% Li2O with Internal Zones Up To 2.72%
Equitorial Exploration Extends Lithium Mineralization at Cat Lake
Drills 10.6m of 1.50% Li2O with Internal Zones Up To 2.72%
Vancouver, BC, Canada – August 1, 2018 – Equitorial Exploration Corp. (TSX-V: EXX, Frankfurt: EE1, OTCQB:
EQTXF) (“Equitorial” or “Company”) is pleased to announce the drill assay results from drill hole CT-18-04
demonstrate a lateral extension of the Cat Tail Pegmatite discovery at its 100%-owned Cat Lake Lithium Property
in southeast Manitoba.
Drill Hole CT-18-04
The discovery drill hole, CT-18-02, was positioned to intersect a possible projection of the Irgon Pegmatite system,
presently being explored by QMC Quantum Minerals to the west of the company's claims. The discovery drill hole
CT-18-02 encountered 36.19 meters of a spodumene-bearing pegmatite (true width not determined at this time)
at a depth of 126.41 meters downhole or 90 meters below the surface. The hole was collared approximately 222
meters southeast of the last surface exposure of the Irgon Pegmatite. The Cat Tail P egmatite has no surface
expression. Drill hole CT-18-04 was collared 46 meters to the east of the discovery hole. Drill hole CT-18-04 (News
Release – March 28 th, 2018) encountered 19.9 meters of a spodumene bearing pegmatite This pegmatite was
encountered approximately 105 meters downhole or 72 meters below the surface and confirms the lateral
extension of the Cat Tail Pegmatite discovery.
The hole had a spodumene mi neralized length of 10.61 meters (true width not determined at this time) with a
weighted average of 1.50% Li2O with internal zones grading up to 2.72% Li2O. The pegmatite remains open along
strike and to depth.
Table 1: Assay Table for CT-18-04, Cat Tail Pegmatite
Assays in Progress
All remaining samples from the drill program are currently at the assay lab and the company is awaiting results.
Other pegmatites were encountered in the drilling but the Cat Tail Pegmatite is the most significant and contains
significant lithium mineralization.
3,000m Drill Program Permitting Submitted
The company has submitted a work permit for a second phase of drilling on the Cat Tail Pegmatite to the
Manitoba government. The program will consist of approximately 3,000 meters to further delineate the
spodumene-bearing Cat Tail Pegmatite The company is presently planning a surface exploration program to be
carried out this summer/fall, to enhance the geological understanding of the area.
CT-18-04 Cat Tail Pegmatite From (m) To(m) Interval (m) Li2O % Cs ppm Rb ppm Ta ppm Fe%
Overall Mineralized Section 105.32 115.93 10.61 1.50 32.18 750.08 83.97 0.55
including
105.32 107.97 2.65 2.21 33.60 732.40 81.60 0.44
including
108.72 110.50 1.78 1.57 28.28 526.87 134.81 0.37
including
112.87 114.57 1.70 2.72 22.12 812.18 47.19 0.40
QA/QC Protocol
All core samples have been sent to the Activation Laboratories facility, in Ancaster, Ontario for analysis. Samples
were prepared, using the lab’s Code RX1 procedure. Samples are crushed, up to 95% passing through a 10 mesh,
riffle split, and then pulverized, with mild steel, to 95%, passing 105 μm. Analyses were completed, using the lab’s
Ultratrace 7 Package; a Sodium Peroxide Fusion which allows for total metal recovery and is effective for analysis
of Sulphides and refractory minerals. Assay analyses are carried out, using ICP‐O ES and ICP‐MS instrumentation.
Equitorial Exploration implemented a QA/QC program for the drill program with the injection of blanks, duplicates
and commercial standards at intervals throughout the sample sequence. Activation Laboratories has their own
internal QA/QC procedures that it carries out for all sample batches.
The drill program was supervised Carey Galeschuk. P. Geo, a consulting geologist with extensive experience in
rare element and lithium-bearing pegmatites. He also serves as Qualified Person for the purpose of National
Instrument 43-101.
Cat Lake Lithium Property Highlights
● Property situated directly east and along strike of Quantum Minerals' Cat Lake Mineral Project
(previously Irgon Lithium Mine) . During 1956 -1957, t he Irgon Mine was an underground
mining operation for spodumene (one of the hard rock sources for Li). The pegmatite had an historic
estimate of 1.25 million tons of ore grading 1.51% Li20 (Mineral Inventory File No. 221).
● The Equitorial Exploration claim block is located 150 m from south end of Irgon Lithium Mine shaft and
approximately 93 meter east of the last exposed outcrop of the Irgon Pegmatite
● 48 feet (14.63 m) of spodumene bearing quartz were reported drilled in 1948 on the company’s present
claims but not followed up at the time (Manitoba Assessment File 98073 - not 43-101 compliant)
● Property approximately 180 km northeast of Winnipeg, Manitoba
● Excellent infrastructure - Provincial Highway 314 in southeast Manitoba cuts through the property
Please click for map s of the claims: http://equitorialexploration.com/wp-content/uploads/2018/01/Cat-
Lake-Claims-Maps-3.pdf
The property lies within the east-trending Mayville-Cat-Euclid Greenstone Belt (“MCEGB”) located along the
northern contact of the Maskwa Lake Batholith. This northern greenstone belt has a similar structural geological
setting as the Bird River Greenstone Belt (“BRGB”) which is l ocated along the southern contact of the same
batholith, and is parallel to and approximately 18km to the south of the MCEGB. The property is located 20
kilometers north of the Tanco Mine Property. The BRGB hosts the world -class Tanco rare element -bearing
pegmatite as well as numerous other lithium bearing pegmatites. The Tanco Mine went into production in 1969
and produced tantalum, cesium and spodumene (lithium). It was previously North America’s largest and sole
producer of spodumene (Li), tantalum (Ta) and pollucite (Cs).
About Equitorial Exploration Corp
Equitorial is aggressively developing four 100%-owned, high-potential, lithium projects in North America. The
Little Nahanni Pegmatite Group (LNPG) is a 43-101 compliant, hard rock, lithium property in the NWT. The Cat
Lake Lithium Property in Manitoba, Canada is directly adjacent to the Cat Lake Mineral Project, a highly
prospective Lithium property. The Tule and Gerlach Lithium Brine Projects are located in lithium-rich Utah and
Nevada within easy reach of the Tesla Gigafactory #1. All four projects have demonstrated highly encouraging
grades.
For more information please visit: http://equitorialexploration.com/
On behalf of the Board of Directors
EQUITORIAL EXPLORATION CORP.
_____________________
Jack Bal, CEO and Director
For further information, please contact Jack Bal at 604-306-5285
FORWARD LOOKING STATEMENTS: This news release contains certain forward-looking statements within the meaning of
Canadian securities laws, including statements regarding the Cat Lake, Tule, Gerlach and Little Nahanni Pegmatite Projects:
statements pertaining to the ability of Equitorial Exploration Corp.(“EXX”); the potential to develop resources and then further
develop reserves; the anticipated economic potential of the property; the availability of capital and finance for EXX to execute its
strategy going forward. Forward-looking statements are based on estimates and assumptions made by EXX in light of its
experience and perception of current and expected future developments, as well as other factors that EXX believes are
appropriate in the circumstances. Many factors could cause EXX’s results, performance or achievements to differ materially from
those expressed or implied by the forward looking statements, including: discrepancies between actual and estimated results
from exploration and development and operating risks, dependence on early exploration stage concessions; uninsurable risks;
competition; regulatory restrictions, including environmental regulatory restrictions and liability; currency fluctuations; defective
title to mineral claims or property and dependence on key employees. Forward-looking statements are based on the expectations
and opinions of the Company’s management on the date the statements are made. The assumptions used in the preparation of
such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue
reliance should not be placed on forward-looking statements. The Company expressly disclaims any intention or obligation to
update or revise any forward-looking statements whether as a result of new information, future events or otherwise.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.