Leviathan Gold, via Core Prospecting Pty Ltd. Receives Results, from Phase 2 Diamond Drilling at the Excelsior Prospect.
Leviathan Gold, via Core Prospecting Pty Ltd. Receives Results, from Phase 2 Diamond
Drilling at the Excelsior Prospect.
• A total of 640.85 meters of diamond drilling over 5 holes has been completed by Core
Prospecting Pty Ltd.
• Highlights include 0.41 meters at 6.3 g/t Au in hole EH0 30 terminated in a void
thought to represent historic underground mine workings, and 1.62 meters at 5.3 g/t
Au and 0.27 meters at 14.5 g/t Au in hole EH031,
• Drilling is ongoing and form s part of an ongoing 4,000 meter diamond drilling
program being undertaken by Core , the expected cost of which is approximately
CAD$950,000.
Vancouver, BC – September 10, 2024 - Leviathan Gold Ltd. (“ Leviathan”, the “Company”)
(LVX – TSXV, 0GP – Germany) is pleased to announce receipt of initial assay results from Phase
2 diamond drilling currently under way at its Excelsior Prospect (“Excelsior”) pursuant to a Heads
of Agreement entered into between Leviathan and Core Prospecting Pty Ltd (“Core”) on July 17,
2023 as subsequently amended on January 16, 2023 (“ HOA”). Excelsior lies within the
Company’s Avoca Project in the Victorian Goldfields, Australia.
A total of 640.85 meters of diamond drilling over five Phase 2 holes has now been completed by
Core in a south-easterly oriented fan of drill holes designed to test for north-easterly continuation
of high-grade hanging wall mineralization identified during the first phase of drilling, as reported
by the Company on June 25, 2024 (Figure 1). This work forms part of a n ongoing 4,000 meter
diamond drilling program being performed by Core, the expected cost of which is approximately
CAD$950,000.
Results from the first two holes of this program (EH030 and EH031) have been received , and
include 0.41 meters at 6.3 g/t Au and 1.62 meters at 5.3 g/t Au in hole EH030, which terminated
in previously mapped underground mine workings . While drilling had been designed to target
mineralized structures beyond these workings, deviation of the drill string is understood to have
brought about this intersection, and nevertheless validates Core’s targeting model. An interval of
0.27 meters at 14.5 g/t Au was returned in hole EH031. Additional drilling will be required to
determine the true thickness of mineralization.
- 2 -
The purpose of the current Core program is to drill beneath and along- structure from intervals
previously reported by Leviathan from Excelsior, which include 8.24 g/t Au over 6.63 meters
(54.63 gram meters), from 161.95 meters in hole EH003 (press release of April 21, 2021); 5.40 g/t
Au over 11.02 meters (59.51 gram met ers), from 84.37 meters in hole EH005 (press release of
April 26, 2021) and 4.85 meters at 9.0 g/t Au (43.66 gram meters) in hole EH014, 3.13 meters at
56.9 g/t Au (178.23 gram meters), in hole EH017 and 12.68 meters at 9.2 g/t Au, (116.85 gram
meters), in hole EH029 (press release of June 25, 2024). These intervals are believed to represent
the down- dip continuation of mineralization observed in historic mine workings, and are
characterized by intense quartz veining, visible gold, and enveloping sericitic alter ation and base
metal sulphides.
Interpretative work on drilling completed to date continues to suggest the presence of a northeast
plunging mineralized dilational zone consisting of quartz reef and associated splays in which gold
is hosted in quartz veins..
Highlights of results published in this release are provided in Table 1, collar information in Table
2, and full results in Table 3.
Figure 1: Plan of drilling at the Excelsior Reef
- 2 -
Table 1: Significant intervals from drilling at the Excelsior Reef, current release
Drill
Hole
From To Interval Au Au
(m) (m) (m) (g/t) (gram meters)
EH030 116.67 117.08 0.41 6.34 2.60
EH031 75.28 76.9 1.62 5.32 8.62
EH031 102.28 102.55 0.27 14.50 3.92
- 2 -
Table 2: Collar data for drilling at the Excelsior Reef
Easting
(MGA 2020 Z54)
Northing
(MGA 2020 Z54)
Elevation
(m)
Azimuth
(°)
Inclination
(°)
Depth
(m)
EH030 726,198 5,899,560 235.5 133 -54 122.6
EH031 726,198 5,899,560 235.5 155 -55 104.5
EH032(1) 726,198 5,899,560 235.5 143 -62 150.3
EH033(1) 726,198 5,899,560 235.5 124 -57 140.6
EH034(2) 726,198 5,899,560 235.5 131 -64 161
*Coordinates are in MGA2020 Z54, azimuths are referenced to grid north and inclinations are zero when
horizontal and -90 when vertical true; (1)Results pending; (2)In progress.
Leviathan Gold Chief Executive Officer, Luke Norman, remarked: “ Following on from the
success of Core Prospecting’s Phase 1 program at Excelsior, ongoing drilling and geological
work appears to demonstrate the potential for north-eastward strike extensions to Phase 1 gold
mineralization at the property. With over 3,000 meters of diamond drilling remaining to be
completed by Core under their current Phase 2 program, these works continue to provide
Leviathan with the opportunity to define a high-grade gold deposit of significance. We once again
thank Core for their considerable efforts to date and look forward to working with their highly
skilled team as this program continues to evolve.
About the HOA
Under the terms of the HOA, Core may earn an initial 40% interest in a three square kilometre
area within EL5387 (the Excelsior Area of Interest, or “AOI”) by completing, at Core’s sole cost
and expense, 2,000 mete rs of diamond drilling including assays by April 17, 2024 (“Phase 1”),
and a further 35% interest in the AOI for an additional 4,000 meters of diamond drilling including
assays and preparing an independent JORC report (the “JORC Report”) identifying an Indicated
and/or Measured Mineral Resource within 12 months from the end of Phase 1, each at Core’s sole
cost and expense (“ Phase 2 ”). In lieu of completing such further drilling, Core may instead
prepare, at its sole cost and expense, a JORC report containing Indicated and/or Measured Mineral
Resources of not less than 50,000 ounces of gold at a cut -off grade of 2.5g/t Au within the AOI.
Upon fulfilment of certain conditions by Core, Leviathan shall on behalf of Core apply for a
standalone tenure over the AOI, (the “ New Tenement”). If Core fails to complete Phase 2 they
shall forfeit any interest under Phase 1 and shall have no interest in the AOI.
As a result of Core completing the initial phase of diamond drilling (press release of June 2 5,
2024), and commencing its second phase of diamond drilling, it has earned a 40% interest in in a
New Tenement to be applied for by Leviathan, subject to the fulfilment of certain further
conditions by Core.
Upon Core having attained a 75% equity interest in the AOI, Leviathan may either contribute its
share of costs and maintain its equity interest or be diluted pro-rata to a minimum carried interest
of 5%, which Core shall purchase from Leviathan for the sum of AUD$150 per ounce of Indicated
and/or Measured Mineral Resource s as estimated in the JORC Report, payable upon
- 2 -
commencement of gold production. Alternatively, Core may, within 12 months of the completion
of Phase 2, purchase Leviathan’s holding in the AOI for the sum of AUD$75 per ounce of Indicated
and/or Measured Mineral Resources in the JORC Report, or Core may within 12 months of the
completion of Phase 2 purchase Leviathan’s holding in the Excelsior AOI by paying instalments
of AUD$25,000 per quarter, increasing to AUD$75,000 per quarter, commencing from the date
on which a New Tenement is granted and continuing for the life of any gold production mine
located within the area of the AOI.
The HOA also provides that Leviathan may , subject to Core first completing Phase 1, claw back
Core’s equity stake in the AOI for the sum of AUD$500 per meter drilled, or after receipt of the
JORC Report for AUD$150 per ounce of gold mineralisation estimated and classified as an
Indicated Mineral Resource and/or a Measured Mineral Resource in the JORC Report.
About the Excelsior Prospect
The Excelsior prospect is interpreted to host structurally controlled gold mineralization developed
within quartz veins. Historic production records from Excelsior indicate the mining of 13,200 tons
for 9,260 ounces of gold down an ore shoot to a depth of 100 meters at an average recovered grade
of 22 g/t Au between 1909 and 19151, with said mineralization open to depth and along strike . A
total of 1,917 meters in 11 holes have been drilled at Excelsior by Leviathan to date.
Qualified Person and Data Verification
The technical content of this news release has been reviewed, verified and approved by Keith
Whitehouse, MAusIMM (CP Geol), MAICD, Exploration Manager of Leviathan Gold (Australia)
Pty. Ltd., a qualified person as defined by NI 43-101.
Drilling was carried out by Core using their equipment, and all core was drilled at NQ size.
Average core recovery for the program was 96.6%. Drill core was cut in half by Core using a
diamond saw, with one half of the core then taken as a sample for analysis. Samples were sawn
along the bottom of hole orientation line, or if none present a consistent cutline as marked by the
logging geologist. Sample intervals were generally between 10 and 150 centimetres , producing
samples of between 0.27 to 4.0 kg. Sampl es were delivered to On Site Laboratory Services (Pty)
Ltd (“ On Site ”), in Bendigo, Victoria. The samples were coarse crushed to P80 <2mm using
industry standard Boyd crushers with a 1kg sub-sample being packed into standard containers for
assay using a Chrysos Corporation Photon Assay analyser, lab method code PAAU02. Regular
crush duplicates were generated and reported by the laboratory together with regular replicate
results of the primary sample. Replicate results were provided for 100% of gold grades greater
than 10 g/t and more than 85% of grades greater than 5 g/t. Core routinely inserted Photon Assay
certified geochemical standards and blanks together with samples flagged for coarse crush
duplicate-sampling into the drill core sample stream as part of a documented Quality
Assurance/Quality Control ( “QAQC”) process to monitor laboratory performance. During the
drilling program QAQC material was inserted into every sample batch at the following average
1 GeoVic (2020) https://earthresources.vic.gov.au/geology-exploration/maps-reports-data
- 2 -
rates per primary sample: crush duplicates 1 in 30; basalt blanks 1 in 30; certified reference
material 1 in 30. QAQC sampling was considered to provide acceptable results. Sample grades
were checked against recovery percentage for potential bias; no discernible high- or low-grade
bias was observed.
On behalf of the Company,
Luke Norman, Chief Executive Officer and Director
For further information please visit the Company website www.leviathangold.com or contact:
Adam Ross, Investor Relations,
Direct: (604) 229-9445
Toll Free: 1(833) 923-3334
Email: [email protected]
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of
this release. No securities regulatory authority has either approval or disapproved of the contents
of this press release.
This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the
securities in the United States . The securities have not been and will not be registered under the
United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities
laws and may not be offered or sold within the United States unless registered under the U.S.
Securities Act and applicable state securities laws or an exemption from such registration is
available.
Forward-Looking Statements
Information set forth in this news release contains forward -looking statements that are based on
assumptions as of the date of this news release, including with respect to geological prospects of
Leviathan’s mineral projects, planned exploration activities, success of exploration activities, the
relevance of historical information, the continuation of mineralization , the relevance of
comparable projects, the timing of exploration activities, general business and economic
conditions; that applicable approvals are obtained; that qualified workers, financing, permits,
approvals, and equipment are obtained in a timely manner; that market conditions continue; that
contractual counterparties perform their obligations as required; and that Leviathan is able to locate
sufficient financing for favourable ongoing operations . These statements reflect management's
current estimates , beliefs, intentions and expectations. They are not guarantees of future
performance. Leviathan cautions that all forward looking statements are inherently uncertain and
that actual performance may be affected by many material factors, many of which are beyond
Leviathan’s control. Such factors include, among other things: risks and uncertainties relating to
whether exploration activities will result in commercially viable quantities of mineralized
- 2 -
materials; the possibility of changes to project parameters as plans continue to be refined; the
ability to execute planned exploration and future drilling programs ;COVID-19; the ability to
obtain qualified workers, financing, permits, approvals, and equipment in a timely manner or at all
and on reasonable terms; changes in the commodity and securities markets; non- performance by
contractual counterparties; and general business and economic conditions, Accordingly, actual and
future events, conditions and r esults may differ materially from the estimates, beliefs, intentions
and expectations expressed or implied in the forward- looking information. Although Leviathan
has attempted to identify important risks and factors that could cause actual actions, events or
results to differ materially from those described in forward-looking statements, there may be other
factors and risks that cause actions, events or results not to be as anticipated, estimated or intended.
Consequently, undue reliance should not be placed on such forward- looking statements. In
addition, all forward- looking statements in this press release are given as of the date hereof.
Leviathan disclaims any intention or obligation to update or revise any forward -looking
statements, whether as a result of new information, future events or otherwise, save and except as
may be required by applicable securities laws. The forward -looking statements contained herein
are expressly qualified by this disclaimer.
Table 3: Full results by sample interval of drilling at the Excelsior Reef
Hole_ID From
(m)
To
(m)
Interval
(m)
Sample
Type SampleID Au
(g/t)
EH030 98.77 99.3 0.53 HC CP1962 0.20
EH030 99.3 100.17 0.87 HC CP1963 0.18
EH030 100.17 100.65 0.48 HC CP1964 0.04
EH030 102.33 103.1 0.77 HC CP1965 0.07
EH030 109.45 110.04 0.59 HC CP1987 0.04
EH030 110.04 110.63 0.59 HC CP1988 0.03
EH030 114.06 114.6 0.54 HC CP1966 0.11
EH030 114.6 115.2 0.6 HC CP1967 0.24
EH030 115.2 116 0.8 HC CP1968 0.12
EH030 116 116.67 0.67 HC CP1969 0.34
EH030 116.67 117.08 0.41 HC CP1971 6.34
EH030 117.08 117.35 0.27 HC CP1973 0.27
EH031 52.4 52.78 0.38 HC CP1974 0.07
EH031 52.78 53.15 0.37 HC CP1975 0.11
EH031 71.16 71.42 0.26 HC CP1976 0.56
EH031 75.28 76.2 0.92 HC CP1977 8.87
EH031 76.2 76.9 0.7 HC CP1978 0.65
EH031 78.35 78.7 0.35 HC CP1979 0.12
EH031 91.45 91.96 0.51 HC CP1980 0.03
EH031 100.69 101.15 0.46 HC CP1981 0.13
EH031 101.15 101.45 0.3 HC CP1982 0.04
EH031 101.45 101.7 0.25 HC CP1983 0.17
EH031 101.7 102.28 0.58 HC CP1984 0.08
EH031 102.28 102.55 0.27 HC CP1986 14.50
- 2 -