Operating earnings is a non‐GAAP measure defined as sales, less operating costs (excluding depreciation) and general and administrative costs. 2 Attributable to shareholders of Lundin Mining Corporation. 3 Basic and diluted earnings / (loss) per share attributable to shareholders of Lundin Mining Co

Corporate Updates

1

 Operating earnings is a non‐GAAP measure defined as sales, less operating costs (excluding depreciation) and general and administrative costs. 

2

 Attributable to shareholders of Lundin Mining Corporation.   

3

 Basic and diluted earnings / (loss) per share attributable to shareholders of Lundin Mining Corporation. 

4

 Net cash / (debt) is a non‐GAAP measure defined as cash and cash equivalents, less long‐term debt and finance leases, before deferred financing fees. 

1 

NEWS RELEASE   

Lundin Mining Third Quarter Results  

Toronto,  October  25,  2017  (TSX:  LUN;  OMX:  LUMI)  Lundin  Mining  Corporation  (“Lundin  Mining”  or  the 

“Company”) today reported cash flows of $249.5 million generated from operations in its third quarter of the 

year, with net earnings from continuing operations attributable to Lundin Mining shareholders of $131.8 million 

($0.18 per share) for the quarter ended September 30, 2017.  

Mr.  Paul  Conibear,  President  and  CEO  commented,  “Our  Candelaria  and  Eagle  operations  delivered  another 

quarter  of  excellent  production  and  cost  performance.  Cash  cost  guidance  has  been  further  improved  for  both 

Eagle and Zinkgruvan. We have revised production guidance for Zinkgruvan and Neves‐Corvo which includes an 

allowance  for  labour  action  by  some  of  the  unionized  employees  of  the  Neves‐Corvo  operation  in  the  fourth 

quarter.   

"All growth projects are on schedule and budget, including construction of the Los Diques tailings dam facility at 

Candelaria on plan to be ready for use early next year. We remain active and focused on value creation through 

disciplined investment in our existing assets and on potential acquisition initiatives.”  

    Summary financial results for the quarter and year‐to‐date: 

      Three months ended      Nine months ended 

      September 30,     September 30,

  US$ Millions (except per share amounts)  2017  2016      2017  2016 

  Sales  601.7   374.5      1,544.2 1,086.4

  Operating costs  (241.4)  (225.6)    (665.0) (638.1)

  Operating earnings1  350.7   142.6      851.4 428.9

  Impairment  ‐   ‐      ‐ (772.1)

  Continuing, attributable net earnings / (loss)2  131.8   (18.9) 238.4 (56.4)

  Attributable net earnings / (loss)2  131.8   (11.4)    293.4 (824.6)

  Net earnings / (loss)  156.6   (7.1)    348.0 (810.5)

  Basic and diluted earnings / (loss) per share3  0.18   (0.02)    0.40 (1.15)

  Cash flow from operations  249.5   59.3      673.4 255.3

  Cash and cash equivalents  2,152.9   691.3      2,152.9 691.3

  Net cash / (debt)4  1,145.5   (308.8)    1,145.5 (308.8)

Corporate Office

150 King Street West, Suite 1500 

P.O. Box 38 

Toronto, ON M5H 1J9 

Phone: +1 416 342 5560 

Fax:      +1 416 348 0303 

1

 Cash cost per pound is a non‐GAAP measure – for discussion of non‐GAAP measures see page 28 of the Company’s Management’s Discussion & Analysis 

for the period ending September 30, 2017 available under the Company’s profile on SEDAR (www.sedar.com). 

2 

Highlights 

Operational Performance 

Copper and zinc production for the third quarter of 2017 were higher than that realized in the third quarter of 

2016, while lower nickel grades at Eagle contributed to lower comparable nickel production. Cash costs1 for the 

quarter across all operations benefitted from higher by‐product metal prices, resulting in lower cash costs than 

those  realized  in  the  third  quarter  of  2016.  Full  year  cash  cost  guidance  has  been  lowered  for  Eagle  and 

Zinkgruvan to reflect this.  

Candelaria (80% owned): The Candelaria operations produced, on a 100% basis, 49,203 tonnes of copper, and 

approximately  27,000  ounces  of  gold  and  525,000  ounces  of  silver  in  concentrate  during  the  quarter.  Copper 

production  for  the  quarter  was  in‐line  with  expectations,  but  exceeded  the  prior  year  comparable  period  due 

primarily to higher grades. Copper cash costs of $1.17/lb for the quarter were lower than the prior year and are 

expected to meet guidance over the full year.   

In  September,  Candelaria  achieved  successful  labour  negotiations  with  the  three  organized  groups  at  the 

operation and these agreements have since been completed. Agreements were reached ahead of the 2017 year‐

end contract expiry, and have a term of 36 months. The new agreements, signed under the new labour law in 

Chile,  recognize  the  existing  benefits  workers  have  and  place  a  focus  on  improving  the  productivity  of  the 

operations, which is of benefit to both workers and the Company. 

Construction  of  the  Los  Diques  tailings  dam  facility  continues  on  schedule  and  on  budget,  with  pre‐

commissioning activities commencing during the quarter. Water is now being placed in the containment area for 

pre‐wetting of the basin ahead of tailings placement that is expected to commence in the first half of 2018. Total 

forecast spend on the project remains unchanged at $295 million, of which approximately $60 million remains 

to be spent as of September 30, 2017; $30 million in the fourth quarter of 2017 and $30 million in 2018.       

Eagle  (100%  owned):  Eagle  production  was  in‐line  with  expectations  for  the  quarter,  with  the  operations 

producing 5,618 tonnes of nickel and 4,995 tonnes of copper. Quantities were less than the same period in 2016 

as a result of lower head grades. Nickel cash costs of $0.63/lb for the quarter benefited significantly from higher 

copper by‐product prices than the comparable period in the prior year. Full year cash cost guidance has been 

revised to $1.10/lb (from $1.35/lb) to reflect the continued benefit from by‐products. 

The Eagle East ramp is advancing ahead of schedule. Permit amendment review and approvals for mining and 

processing of Eagle East ore are progressing according to plan. 

Neves‐Corvo  (100%  owned):  Neves‐Corvo  produced  7,946  tonnes  of  copper  and  19,562  tonnes  of  zinc  in  the 

quarter,  below  expectations.  Zinc  production  exceeded  the  prior  year  comparable  period,  while  copper 

production was negatively impacted by lower throughput, grades and recoveries. Copper cash costs of $0.75/lb 

for the quarter were significantly lower than the prior year comparable period, aided by higher zinc by‐product 

volumes and prices. Year‐to‐date cash costs of $0.95/lb remains in line with full year guidance. 

The  Zinc  Expansion  Project  (“ZEP”)  investment  to  double  zinc  production  at  Neves‐Corvo  progressed  over  the 

quarter  and  remains  on  target  to  commence  production  ramp  up  prior  to  the  end  of  2019,  with  over  2,000 

metres of underground development achieved to date. 

Subsequent to the end of the quarter, the Company was subject to labour action at Neves‐Corvo. The Mining 

Industry Workers Union organized a strike at the mine from October 3‐7, 2017. The Company has been advised 

that the union intends to undertake another strike during a five‐day period commencing November 6, 2017 and 

it may repeat this action a third time in the month of December. The Company has revised production guidance 

downward to reflect anticipated lost production from the labour actions. The Company has engaged in dialogue 

1 

Operating earnings is a non‐GAAP measure – for discussion of non‐GAAP measures see page 28 of the Company’s Management’s Discussion & Analysis 

for the period ending September 30, 2017 available under the Company’s profile on SEDAR (www.sedar.com). 

3 

with  the  unions,  who  are  looking  for  changes  to  work  schedules  and  other  factors  that  have  also  been 

demanded of other industries as part of a nation‐wide union initiative.    

Zinkgruvan (100% owned): Zinc production of 18,958 tonnes in the third quarter of 2017 was in‐line with the 

prior  year  comparable  period,  while  lead  production  of  7,899  tonnes  was  23%  higher,  driven  by  higher  mill 

throughput of zinc‐lead ore and higher lead grades. However, given the lower zinc head grades realized to date 

and expected for the remainder of the year, full year zinc production guidance has been reduced. 

Zinc  cash  costs  of  $0.30/lb  for  the  quarter  were  lower  than  the  prior  year  comparable  period  and  full  year 

guidance. Given the performance to date, zinc cash cost guidance has been reduced to $0.35/lb. 

Senior Operational Changes 

The  Company  is  pleased  to  announce  that  Peter  Richardson  has  assumed  the  position  of  Chief  Operating 

Officer of Lundin Mining. Mr. Richardson was most recently General Manager of the Company’s Eagle Mine, 

of  which  he  remains  Managing  Director,  and  brought  more  than  two  decades  of  industry  experience  to 

Lundin Mining when he joined in 2015. Taking up the role of General Manager at the Eagle Mine is Kristen 

Mariuzza.  Mrs.  Mariuzza  was  previously  the  Health,  Safety,  Environment,  and  Permitting  Manager  at  Eagle 

Mine and has significant experience from the early project phase to full production. 

Financial Performance 

 Sales  for  the  quarter  ended  September  30,  2017  were  $601.7  million,  an  increase  of  $227.2  million  in 

comparison  to  the  third  quarter  of  the  prior  year  ($374.5  million).  The  increase  was  mainly  due  to  higher 

realized metal prices and price adjustments ($158.2 million) and higher sales volumes ($57.1 million).  

On a year‐to‐date basis, sales were $1,544.2 million, an increase of $457.8 million in comparison to the nine 

months ended September 30, 2016 ($1,086.4 million). The increase was mainly due to higher realized metal 

prices and price adjustments ($359.6 million) and higher sales volumes ($81.5 million). 

 Operating costs (excluding depreciation) for the quarter ended September 30, 2017 were $241.4 million, an 

increase of $15.8 million in comparison to the third quarter of the prior year ($225.6 million). Although per 

unit  operating  costs  were  lower  ($29.0  million),  this  was  more  than  offset  by  higher  sales  volumes  ($38.6 

million) and disadvantageous movements in foreign exchange ($6.1 million). 

On a year‐to‐date basis, operating costs (excluding depreciation) were $665.0 million, an increase of $26.9 

million  in  comparison  to  the  nine  months  ended  September  30,  2016  ($638.1  million).  The  increase  was 

largely  due  to  higher  overall  sales  volumes  ($48.9  million)  and  disadvantageous  movements  in  foreign 

exchange ($7.0 million), partially offset by lower per unit operating costs ($27.6 million).  

 Operating earnings1 for the quarter ended September 30, 2017 were $350.7 million, an increase of $208.1 

million in comparison to the third quarter of the prior year ($142.6 million). The increase was primarily due 

to higher realized metal prices and price adjustments ($158.2 million), lower per unit operating costs ($29.0 

million), and higher sales volumes ($18.5 million), partially offset by negative foreign exchange impacts ($6.1 

million). 

On a year‐to‐date basis, operating earnings were $851.4 million, an increase of $422.5 million in comparison 

to  the  nine  months  ended  September  30,  2016  ($428.9  million).  The  increase  was  primarily  due  to  higher 

realized metal prices and price adjustments ($359.6 million), higher sales volumes ($32.5 million), and lower 

per unit operating costs ($27.6 million), partially offset by negative foreign exchange impacts ($7.0 million).  

4 

 Net earnings from continuing operations for the quarter ended September 30, 2017 were $156.6 million, an 

increase  of  $171.2  million  in  comparison  to  the  three  months  ended  September  30,  2016  (loss  of  $14.6 

million). Comparative earnings were higher due to: 

‐ higher operating earnings ($208.1 million); partially offset by 

‐ higher net tax expense ($58.4 million). 

On a year‐to‐date basis, the Company reported net earnings from continuing operations of $293.0 million, 

an increase of $335.2 million in  comparison to the nine months ended September 30, 2016 (loss of $42.2 

million). Comparative earnings in the current year were higher due to: 

‐ higher operating earnings ($422.5 million); and 

‐ lower depreciation, depletion and amortization expense ($31.0 million); partially offset by 

‐ higher net tax expense ($125.5 million). 

 Cash  flow  from  operations  for  the  quarter  ended  September  30,  2017  was  $249.5  million,  an  increase  of 

$190.2 million in comparison to the third quarter of the prior year ($59.3 million). The increase was primarily 

due to higher operating earnings ($208.1 million). 

On  a  year‐to‐date  basis,  cash  flow  from  operations  was  $673.4  million,  an  increase  of  $418.1  million  in 

comparison to the nine months ended September 30, 2016 ($255.3 million). The increase was attributable 

to  higher  operating  earnings  in  the  current  year  ($422.5  million)  as  well  as  changes  in  non‐cash  working 

capital ($114.7 million), partially offset by higher net tax payments ($92.1 million). 

Corporate Highlights 

 On  September  5,  2017,  the  Company  reported  its  Mineral  Resource  and  Mineral  Reserve  estimates  as  at 

June 30, 2017 on SEDAR (www.sedar.com). On a consolidated and attributable basis, estimated contained 

metal in the Proven and Probable Mineral Reserve categories totaled 3,232,000 tonnes of copper, 3,415,000 

tonnes of zinc and 130,000 tonnes of nickel. 

 On October 20, 2017, the Company announced that it had issued a notice to redeem all of its 7.50% Senior 

Secured Notes due 2020 (the "2020 Notes") on November 20, 2017 at the redemption price of 103.75% of 

the  principal  amount  of  the  2020  Notes  plus  accrued  and  unpaid  interest.  There  is  $550  million  principal 

amount  of  the  2020  Notes  currently  outstanding.  The  early  redemption  of  the  2020  Notes  will  save  the 

Company $41.25 million per annum in interest payments. 

Financial Position and Financing 

 Cash and cash equivalents increased $102.2 million during the quarter from $2,050.7 million at June 30, 2017 

to  $2,152.9  million  at  September  30,  2017.  The  increase  is  primarily  a  reflection  of  cash  generated  from 

operating  activities  of  $249.5  million,  partially  offset  by  investments  in  mineral  properties,  plant  and 

equipment of $117.3 million. 

For  the  nine  months  ended  September  30,  2017,  cash  increased  by  $1,437.6  million  due  primarily  to 

proceeds  from  the  sale  of  the  Company’s  indirect  interest  in,  and  distributions  from,  Tenke  Fungurume 

Mining  S.A.  (“Tenke”)  of  $1.1  billion  and  $58.3  million,  respectively.  In  addition,  operating  cash  flows  of 

$673.4  million  were  partially  offset  by  investments  in  mineral   properties,   plant  and  equipment   of  $280.9 

million,  shareholder dividends of $50.7 million, distributions to non‐controlling interests of $46.0 million, and 

interest paid of $33.1 million. 

1 

Net cash / debt is a non‐GAAP measure – for discussion of non‐GAAP measures see page 28 of the Company’s Management’s Discussion & Analysis for 

the period ending September 30, 2017 available under the Company’s profile on SEDAR (www.sedar.com). 

5 

 Net  cash1  position  at  September  30,  2017  was  $1,145.5  million  compared  to  $1,045.1  million  at  June  30, 

2017 and a net debt position of $284.1 million at December 31, 2016.  

 The Company has a revolving credit facility available for borrowing up to $350 million. As at September 30, 

2017, the Company had no amount drawn on the credit facility, only letters of credit in the amount of $26.9 

million.  

 As at October 25, 2017, cash and net cash were approximately $2.2 billion and $1.2 billion, respectively.  

Outlook 

Production,  cash cost, and capital  expenditure  guidance  for 2017 have been updated  from that disclosed  in 

our  Management’s  Discussion   and  Analysis   for  the  three  and  six  months  ended  June  30,  2017,  while 

exploration  expenditure  guidance  remains  unchanged.    

2017 Production  and Cost Guidance 

2017 Guidance  Previous Guidancea Revised Guidanceb

(contained tonnes)           Tonnes  C1 Cost           Tonnes  C1 Cost 

  Copper  Candelaria (80%)  147,000 ‐ 151,000 $1.20/lb 147,000 ‐ 151,000   $1.20/lb

    Eagle   19,000 ‐ 22,000       19,000 ‐ 22,000        

    Neves‐Corvo  36,000 ‐ 39,000 $1.00/lb 32,000 ‐ 35,000  $1.00/lb

    Zinkgruvan  1,000 ‐ 2,000   1,000   

    Total attributable  203,000 ‐ 214,000   199,000 ‐ 209,000   

  Nickel  Eagle  20,000 ‐ 23,000 $1.35/lb 20,000 ‐ 23,000  $1.10/lb

  Zinc  Neves‐Corvo  72,000 ‐ 77,000   70,000 ‐ 73,000   

    Zinkgruvan  80,000 ‐ 85,000 $0.40/lb 77,000 ‐ 80,000  $0.35/lb

    Total  152,000 ‐ 162,000   147,000 ‐ 153,000   

a. Guidance as outlined in our Management's Discussion and Analysis for the three and six months ended June 30, 2017. 

b. Cash costs are dependent upon exchange rates (forecast at €/USD:1.20, USD/SEK:8.00, USD/CLP:625) and metal prices (forecast at Cu: $2.75/lb, Ni: 

$4.50/lb, Zn: $1.30/lb, Pb: $1.00/lb, Au: $1,250/oz, Ag: $16.50/oz).  

6 

2017 Capital Expenditure and Exploration Guidance  

Total capital  expenditures,  excluding  capitalized  interest,  are expected  to remain unchanged  at $490 million.  

An  additional   $10  million   is  expected   to  be  spent  on  capitalized   stripping,   given  strong  open  pit  mining 

progress  to date at Candelaria,  offset by $10 million  lower spend on Neves‐Corvo sustaining  capital  due to 

timing of expenditures.  

Revised Capital Expenditure Guidance 

  ($ millions)  Previous Guidancea    Revisions  Revised Guidance 

  Candelaria 

       Capitalized Stripping  110    10  120

       Los Diques Tailings  135    ‐  135

       Other Sustaining  80    ‐  80

   325    10  335

  Eagle  10    ‐  10

  Neves‐Corvo  50    (10) 40

  Zinkgruvan  40    ‐  40

  Total Sustaining Capital  425 ‐  425

  Eagle East  30    ‐  30

  Zinc Expansion (Neves‐Corvo)  30    ‐  30

  Zinkgruvan Expansion (1350)  5    ‐  5

  Total Expansionary Capital  65 ‐  65

  Total Capital Expenditures  490 ‐  490

a. Guidance as outlined in our Management's Discussion and Analysis for the three and six months ended June 30, 2017. 

Exploration spend is expected to remain unchanged at $75 million, as previously disclosed.  

The information in this news release is subject to the disclosure requirements of Lundin  Mining under the  EU 

Market  Abuse  Regulation.  This  information  was  publicly  communicated  on  October  25,  2017  at  6:30  p.m. 

Eastern Time. 

For further  information,  please contact:  

Mark Turner, Director,  Business  Valuations  and Investor  Relations:   +1‐416‐342‐5565 

Sonia Tercas, Senior Associate,  Investor  Relations:   +1‐416‐342‐5583 

Robert Eriksson,  Investor  Relations  Sweden:   +46 8 545 015 50 

7 

Cautionary Statement on Forward‐Looking Information and Non‐GAAP performance measures    

Certain of the statements made and information contained or incorporated by reference in this news release is "forward‐looking 

information" within the meaning of applicable Canadian securities laws. All statements other than statements of historical facts in 

this  news  release  constitute  forward‐looking  information  based  on  current  expectations,  estimates,  forecasts  and  projections  as 

well  as  beliefs  and  assumptions  made  by  the  Company’s  management.  Such  forward‐looking  statements  include  but  are  not 

limited to those regarding the Company’s outlook and guidance on estimated metal production, costs, and exploration and capital 

expenditures;  the  Zinc  Expansion  Project  at  Neves‐Corvo  and  Eagle  East;  and  Mineral  Reserve  and  Mineral  Resource  estimates. 

Words such as “aim”, “anticipate”, “assumption”, “believe”, “budget”, “estimate, “expectation”, “exploration”, “focus”, “forecast”, 

“growth”, “guidance”, “initiative”, “outlook”, “plan”, “potential”, “project”, “schedule”, or “target”, or variations of or similar such 

terms,  or  statements  that  certain  actions,  events  or  results  could,  may,  might  or  will  be  taken  or  occur  or  be  achieved,  identify 

forward‐looking  information.  Although  the  Company  believes  that  the  expectations  reflected  in  the  forward‐looking  information 

herein  are  reasonable,  these  statements  by  their  nature  involve  risks  and  uncertainties  and  are  not  guarantees  of  future 

performance.  These estimates, expectations and other forward‐looking statements are based on a number of assumptions and are 

subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in 

the forward‐looking statements. Such risks and uncertainties include, without limitation, risks and uncertainties inherent in and/or 

relating  to:  estimates  of  future  production  and  operations,  cash  and  all‐in  sustaining  costs;  metal  and  commodity  price 

fluctuations;  foreign  currency  fluctuations;  mining  operations  including  but  not  limited  to  environmental  hazards,  industrial 

accidents,  ground  control  problems  and  flooding;  geology  including,  but  not  limited  to,  unusual  or  unexpected  geological 

formations, estimation and modelling of grade, tonnes, metallurgy continuity of mineral deposits, dilution, and mineral resources 

and  mineral  reserves,  and  actual  ore  mined  and/or  metal  recoveries  varying  from  such  estimates;  mine  plans,  and  life  of  mine 

estimates;  the  possibility  that  future  exploration,  development  or  mining  results  will  not  be  consistent  with  expectations;  the 

expected  strike  by  union  workers  (and  potential  further  such  strikes)  at  Neves‐Corvo,  and  the  potential  for  and  effects  of  other 

labour disputes or shortages, or other unanticipated difficulties with or interruptions in production; potential for unexpected costs 

and  expenses  including,  without  limitation,  for  mine  closure  and  reclamation  at  current  and  historical  operations;  uncertain 

political  and  economic  environments;  changes  in  laws  or  policies,  foreign  taxation,  delays  or  the  inability  to  obtain  necessary 

governmental  approvals  and/or  permits,  including  but  not  limited  to  the  Alcaparrosa  underground  mine  operating  license,  the 

Punta Padrones process operating license and the Ojos del Salado mill tailings line permit at Candelaria which are required by the 

end  of  the  year;  regulatory  investigations,  enforcement,  sanctions  and/or  related  or  other  litigation;  and  other  risks  and 

uncertainties,  including  but  not  limited  to  those  described  in  the  “Managing  Risks”  section  of  the  Company’s  Management’s 

Discussion and Analysis for the financial period ending December 31, 2016 and completed financial quarters in 2017, and the “Risks 

and Uncertainties” section of our most recently filed Annual Information Form. In addition, forward‐looking information is based 

on  various  assumptions  including,  without  limitation,  the  expectations  and  beliefs  of  management;  assumed  prices  of  copper, 

nickel, zinc and other metals; that the Company can access financing, appropriate equipment and sufficient labour; and that the 

political  environment  where  the  Company  operates  will  continue  to  support  the  development  and  operation  of  mining  projects. 

Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results 

may  vary  materially  from  those  described  in  forward‐looking  statements.  Accordingly,  there  can  be  no  assurance  that  forward‐

looking  information  will  prove  to  be  accurate,  and  readers  should  not  place  undue  reliance  on  forward‐looking  statements.  The 

Company disclaims any intention or obligation to update or revise forward‐looking statements or to explain any material difference 

between such and subsequent actual events, except as required by applicable law. 

Certain  financial  measures  contained  herein,  such  as  operating  earnings,  net  debt  and  cash  costs,  have  no  meaning  within 

generally  accepted  accounting  principles  under  IFRS  and  therefore  amounts  presented  may  not  be  comparable  to  similar  data 

resented  by  other  mining  companies.  This  data  is  intended  to  provide  additional  information  and  should  not  be  considered  in 

isolation or as a substitute for measures or performance prepared in accordance with IFRS.