Lundin Mining Reports Third Quarter 2011 Results

Production Results Financials

Corporate Office UK Office 

150 King Street West, Suite 1500  70 Oathall Road, Haywards Heath P.O. Box 38  West Sussex, RH16 3EN Toronto, ON M5H 1J9  United Kingdom Phone: +1 416 342 5560  Phone: +44 (0) 1444 411 900 Fax:     +1 416 348 0303  Fax:     +44 (0) 1444 456 901

NEWS RELEASE LUNDIN MINING REPORTS THIRD QUARTER 2011 RESULTS  

Toronto,  October  26,  2011  (TSX:  LUN;  OMX:  LUMI)  Lundin  Mining  Corporation  (“Lundin  Mining”  or  the “Company”) today reported net income of $12.4 million ($0.02 per share) for the third quarter of 2011 and year‐ to‐date net income of $141.3 million ($0.24 per share).

Paul Conibear, President and CEO commented, “At Neves‐Corvo, mining and milling volumes continued at high levels, but lower overall grades in the quarter resulted in reduced metal production and consequently higher cash costs on a per pound basis. These higher costs as well as declining metal prices significantly impacted our operating earnings.  During late September we moved into higher grade stopes and this contributed to improved production  compared  to  the  previous  period.  Significant  increases  in  production  are  expected  in  the  fourth quarter as we continue mining in high grade areas.

Zinkgruvan incurred operating issues with both its zinc and copper grinding mills which affected production. The copper mill gearbox was repaired and was back on line in September and a zinc mill vibration issue is expected to be resolved by the end of October to get back up to full production.

Our investment in Tenke achieved new important milestones during the quarter, with the Phase 2 expansion feasibility study being completed by Freeport. The project paid off the remaining $32.0 million on the Excess Overrun Cost facility and Lundin Mining also received its first cash distribution of $7.8 million for total benefit of $39.8  million  during  the  quarter.    Both  these  milestones  illustrate  the  important  contribution  that  Tenke  is making to the Company's future."

Summary financial results for the quarter are as follows:

US $ millions (except per share amounts)  Three Months Ended September 301

20112010
Sales Operating earnings2 Net income Basic & diluted income per share Net cash position at September 30146.2215.1 121.5 66.0 0.11 125.7
48.7
12.4
0.02
208.7

1 The prior year comparative figures have been restated in accordance with the transition to IFRS.

2 Operating earnings is a non‐IFRS measure defined as sales, less operating costs and general and administration costs.

Highlights 

  • Copper and zinc production improved over the previous quarter; however, production at both Neves‐Corvo and Zinkgruvan was curtailed due to a number of issues. We continued to mine low grade stockwork ores at Neves‐Corvo  and  consequently  plant  recoveries  were  lower  than  planned.  At  Zinkgruvan,  production shortfalls  were  experienced  due  to  grinding  mill  related  issues  in  both  circuits.  Action  has  been  taken  to resolve these issues to enhance  fourth quarter production.

Total production was as follows:

Wholly‐owned operations YTD (tonnes) 2011Q3Q2 Q1 2011 2011FY Q4 Q3 Q2 Q1 2010 2010 2010 2010 2010
2011
Copper 48,389 Zinc 84,392 Lead 31,857 Nickel ‐15,41913,831 19,139 27,404 28,197 10,367 11,413 ‐ ‐80,035 24,908 20,509 21,774 12,844 90,129 23,482 22,571 24,458 19,618 39,568 9,470 10,902 10,953 8,243 6,296 1,062 1,363 1,715 2,156
28,791
10,077
‐
Tenke attributable (24.75%) Copper 22,888 Cobalt 2,0617,398 7,508 687 69129,767 7,908 7,701 7,038 7,120 2,283 723 599 409 552
7,982
683
  • Operating earnings1 for the current quarter of $48.7 million was lower than the $121.5 million reported in the  third  quarter  of  2010.  Unfavourable  price  and  price  adjustments  ($22.9  million  effect),  lower  volume ($11.4  million  effect),  higher  per  unit  costs  ($18.7  million  effect),  suspension  of  mining  activities  at Aguablanca ($19.2 million effect) and foreign exchange ($7.6 million effect) all contributed to the negative variance.
  • Net  income  of  $12.4  million  ($0.02  per  share)  was  $53.6  million  lower  than  the  $66.0  million  ($0.11  per share)  reported  for  the  third  quarter  of  2010.    The  decrease  was  largely  the  result  of  lower  operating earnings ($72.8 million), losses on marketable securities of $11.8 million and an unfavourable tax assessment in Spain for the 2004 to 2006 taxation years ($12.5 million tax plus $2.7 million interest).  This was partially offset by foreign exchange gains of $36.5 million.
  • Cash flow from operations, before changes in non‐cash working capital items, for the current quarter was an inflow of $23.7 million, compared to an inflow of $94.2 million for the corresponding period in 2010.  The decrease of $70.5 million relates mainly to lower earnings.  Cash flow from operations does not include cash flow related to Tenke. During the quarter, our share of available cash from Tenke contributed to a $32.0 million  final  repayment,  discharging  the  Excess  Overrun  Cost  (“EOC”)  facility  for  the  completed  Phase  1 project, and we received an additional $7.8 million cash distribution.
  • The Neves‐Corvo Zinc Expansion plant was started up on time and on budget in July. Given the continued high ratio between copper and zinc price, in August this new circuit was converted to copper ore processing and the Company plans to run the new circuit on copper ore until year‐end to achieve higher margins.
  • In August, a new mine contractor was mobilized to the Aguablanca nickel/copper mine to commence pit push‐backs  and  reinstatement  of  the  pit  haul  ramp.  The  restart  of  Aguablanca  concentrate  production remains  on  schedule  for  the  third  quarter  of  2012.    An  underground  mining  study  was  also  initiated, intended to define potential high grade underground feed to supplement open pit production.

1 Operating earnings is a non‐IFRS measure defined as sales, less operating costs and general and administration costs.

  • In September, the Company released the results of a Feasibility Study on the Lombador Phase I development demonstrating that the exploitation of the upper portions of the Lombador zinc/copper ore bodies could extend the mine life to at least 2026 and create a platform for further extensions. The optimal development plan  for  Lombador  is  being  examined  further  in  conjunction  with  assessing  exploitation  concepts  for  the Semblana  copper  discovery.  The  Company  has  initiated  the  Neves‐Corvo  Future  Underground  Materials Handling Study to assess medium and long‐term underground deposit access and extraction infrastructure, including potential benefits of a second deeper shaft.
  • During  the  quarter,  the  analysis  of  an  extensive  3D  seismic  geophysics  survey  across  the  Neves‐Corvo concessions yielded the identification of 19 new drill targets all within the depth horizon of existing mine workings,  and  at  similar  elevations  to  Semblana  and  Lombador.  Exploration  budgets  were  increased  and these targets will be progressively tested over the year ahead.
  • Exploration programs on the Company’s own assets are being increased in response to drilling success at all current programs including our Irish exploration projects.

Tenke Fungurume 

  • For the quarter ended September 30, 2011, Tenke production was 32,249 tonnes of copper; 29,702 tonnes of copper were sold at an average realized price of $3.46 per pound.
  • During the quarter, the Company benefited from total distributions of $39.8 million from its investment in Tenke:
    • The  Company  fully  repaid  the  remaining  $32.0  million  on  the  EOC  facility  related  to  its proportionate share of the Phase 1 development; and
    • Received its first cash return of $7.8 million.

Attributable cash flow from Tenke, including repayments of the EOC facility, was as follows:

Three months ended Sept 30  Nine months ended Sept 30 

(US$ millions)2011201020112010
Cash advances to Tenke Distributions from Tenke Repayments on EOC facility(14.2)(8.5) ‐ 40.0(30.0)(22.9) ‐ 78.3
7.87.8
32.0108.4
Attributable net cash flow25.631.586.255.4
  • The  Phase  2  Expansion  feasibility  study  to  optimize  the  current  plant  and  increase  capacity  has  been completed  under  the  direction  of  the  operator,  Freeport‐McMoRan  Copper  &  Gold  Inc.  (“FCX”  or “Freeport”).  FCX  plans  to  expand  the  mill  rate  to  14,000  tonnes  per  day  through  the  investment  of approximately $850 million (Lundin Mining’s share approximately $250 million). The expansion includes the completion of mill upgrades, acquisition of additional mining equipment, construction of a new tankhouse and a sulfuric acid plant expansion all targeted for completion in 2013. The Phase 2 Expansion is expected to take  total  plant  production  of  copper  cathode  up  to  approximately  195,000  tpa.    Early  works  on  this expansion, funded by the partners and from excess cash flow from operations, continued on site during the quarter.

Financial Position and Financing 

  • Net cash1 at September 30, 2011 was $208.7 million compared to $125.7 million at September 30, 2010 and $308.2 million at June 30, 2011.

The decrease in net cash during the quarter is primarily attributable to income tax payments ($57.5 million), royalty payments ($18.6 million), investment in mineral property, plant and equipment ($35.1 million), the acquisition of Belmore Resources (Holdings) plc ($9.5 million) and net investment costs in Tenke Fungurume expansion and sustaining capital works ($6.4 million).

  • Cash on hand at September 30, 2011 was $256.2 million.

Outlook 

2011 Production and Cost Guidance 

  • Overall production targets for 2011 remain largely unchanged from previous guidance; however, we have slightly lowered copper and lead production guidance to be conservative on year‐end expectations. C1 cash costs have been updated for forecast production adjustments and changes in forecast metal prices and the US dollar exchange rates with European currencies.
(contained tonnes)Revised 2011 Guidance Tonnes C1 Cost1,2Previous 2011 Guidance3 Tonnes C1 Cost1, 2
Neves‐CorvoCu70,000$1.8072,000$1.65
Zn4,5006,000
Zinkgruvan Zn Pb Cu76,000 $0.32 34,000 1,50078,000 $0.21 36,000 3,400
GalmoyZn31,00028,000
(in ore)Pb8,0008,000
Total: Wholly‐owned operations Cu Zn Pb71,500 111,500 42,00075,400 112,000 44,000
Tenke: 24.0% attributable share Cu30,400 $1.0330,400 $0.97

1 Cash  costs  remain  dependent  upon  exchange  rates  (2011  revised  forecast  €/USD:  1.35  –  USD/SEK:  6.80;  previous  forecast €/USD: 1.40 –USD/SEK: 6.40).

2 Cash cost is a Non‐IFRS measure reflecting the sum of direct costs and inventory changes less by‐product credits.

3 As provided in the MD&A for the six months ended June 30, 2011, dated July 29, 2011.

  • Neves‐Corvo:  Although new massive sulphide stopes have been producing high grade feed to the plant since late  September  (approximately  4%  copper  feed  grades),  production  guidance  for  Neves‐Corvo  has  been revised  slightly  downwards  to  reflect  a  conservative  estimate  of  copper  production  to  year‐end.  Zinc production guidance at Neves‐Corvo has also been reduced as the new zinc plant was converted to copper production duty shortly after startup.

1 Net cash is a Non‐IFRS measure defined as available unrestricted cash less financial debt, including capital leases and other debt‐related obligations.

Cash cost of copper is expected to increase by $0.15/lb over previous guidance due to higher production costs and lower than expected by‐product credits. As a result of these changes, C1 cost guidance for the year is increased from $1.65/lb to $1.80/lb copper.

  • Zinkgruvan:  Annual zinc production guidance is being lowered by 2,000 tonnes as a result of a precautionary reduction in throughput due to the increase in vibrations in the mill girth gear.  The mill will be offline for nine days in October 2011 while the girth gear is being re‐set, after which the mill throughput is expected to increase back to its planned rate. By‐product lead production is consequently expected to be 2,000 tonnes lower than last guidance figures.

During the third quarter, the relatively new copper circuit grinding mill gear box failed and down‐time has resulted in reduced copper production expectations for the year. The repaired gear box is now in place but copper  production  guidance  has  been  lowered  to  1,500  tonnes  for  the  year  to  account  for  the  schedule disruption.

Cash cost of zinc is expected to increase from $0.21/lb to $0.32/lb partly due to lower production noted above.  In addition, by‐product credits are expected to be lower as a result of the recent decline in metal prices and lower copper/lead production.

  • Aguablanca:  The new mining contractor has started pre‐stripping operations. First concentrate production continues to be on schedule for the third quarter of 2012.

Guidance on timing and total investment of €40 million to re‐commence ore production is maintained.

  • Galmoy:   The mine closure plan has been approved by the authorities.  Zinc and lead production continue to exceed targets and thus zinc annual guidance has been increased to 31,000 tonnes.
  • Tenke:  Copper production guidance has been maintained; however, as reported by Freeport, the cash cost guidance is increased to $1.03/lb copper based on expected sales volumes and cost estimates, assuming an average cobalt price of $14/lb for the fourth quarter of 2011.

2011 Capital Expenditure Guidance

  • Total capital expenditure for the year is expected to be approximately $290 million,  unchanged from the initial guidance outlined in the Company’s MD&A for the three months ended March 31, 2011.  The $120 million of capital expenditures for Tenke is being funded by a combination of cash calls and profits generated by the mine.

Preliminary 2012 Production Guidance 

Based on preliminary budgets in hand for 2012, the following are initial projections for 2012 production from the Company's mines:

  • The copper production profile of Neves‐Corvo declines from previous years due predominantly to remaining reserves being lower grade stockworks (< 3% Cu), which also provide for less predictable ore characteristics and lower plant recoveries. Consequently mine planning methods are being revised and a more conservative approach has been taken for preliminary 2012 production guidance. Zinc production for the year ahead is expected to be at least 30,000 tonnes.
  • Although Zinkgruvan production for the year ahead is expected to see modest increases in all metals, it will be substantially the same as the current year with some upside potential depending on success in plant debottlenecking.
  • Aguablanca forecasts contemplate the mine restarting concentrate production in the third quarter of 2012 and ramping up by year‐end.
  • Galmoy high grade mining is expected to conclude in the first half of the year.
  • Tenke production guidance is not available pending Freeport providing its company‐wide annual forecast.
  • Production optimization for 2012 along with five year planning will occur over the next two months.  2012 metal production guidance is expected to be updated in December following Board approval of  budgets.
(contained tonnes of metal in concentrate)Preliminary 2012 Guidance TonnesCurrent 2011 Forecast Tonnes
Neves‐CorvoCu52,500 – 57,00070,000
Zn30,000 – 40,0004,500
Zinkgruvan Zn Pb Cu75,000 – 81,000 34,000 – 39,000 2,000 – 3,00076,000 34,000 1,500
AguablancaNi500 – 1,000n.a
Cu500 – 1,000n.a.
Galmoy1Zn4,000 – 4,50031,000
(in ore)Pb5008,000
Total: Wholly‐owned operationsCu55,000 – 61,00071,500
Zn109,000 – 125,500111,500
Pb34,500 – 39,50042,000
Ni500 – 1,000n.a.
Tenke2: 24% attributable share Cu> 31,00030,400
Total Attributable Copper Production86,000 – 92,000101,900

1 Metal sales are dependent upon milling at a third party processing facility, which are expected to approximate 12,000t Zn and 3,000t Pb in 2012. 2 Tenke 2012 Guidance has not yet been provided by Operator FCX. Lundin Mining anticipates production from Tenke in 2012 to be greater than 2011 guidance subject to the possibilities of staged startup of Phase 2 expansion initiatives.

Selected Quarterly Financial Information 

Three months ended Sept 30  Nine months ended Sept 30 

(USD millions, except per share amounts)2011201020112010
Sales146.2215.1541.7540.0
Operating earnings148.7121.5244.4269.5
Depreciation, depletion and amortization(34.3)(30.6)(107.4)(98.6)
General exploration and project investigation(12.5)(6.3)(33.8)(16.6)
Finance (costs) income(10.6)(0.3)(12.6)22.6
Income from equity investment in Tenke17.217.574.140.3
Other income and expenses21.4(14.3)2.16.0
Income before income taxes29.987.5166.8223.2
Income tax expense(17.5)(21.5)(25.5)(63.0)
Net income12.466.0141.3160.2
Shareholders’ equity3,304.13,028.93,304.13,028.9
Cash flow from operations(40.6)49.6191.2206.9
Capital expenditures (incl. Tenke)58.840.2162.4117.4
Total assets3,905.93,683.73,905.93,683.7
Net cash2208.7125.7208.7125.7

Key Financial Data: 

Shareholders’ equity per share35.675.225.675.22
Basic and diluted income per share60.020.110.240.28
Dividends‐‐‐‐
Equity ratio485%82%85%82%

Shares outstanding:

Basic weighted average582,320,503579,889,803581,939,918579,814,786
Diluted weighted average582,999,753580,262,754583,122,001580,222,350
End of period582,475,287579,924,803582,475,287579,924,803
IFRS basisCanadian GAAP basis5
($ millions, except per share data)Q3‐11Q2‐11Q1‐11Q4‐10Q3‐10Q2‐10Q1‐10Q4‐09
Sales146.2184.0211.5309.3215.1183.1141.7256.7
Operating earnings148.782.2113.6192.2121.582.165.8152.2
Impairment charges (after tax)‐‐‐‐‐‐‐(37.1)
Net income12.457.771.2146.166.042.351.935.1
Income per share6, basic and diluted0.020.100.120.250.110.070.090.06
Cash flow from operations(40.6)102.5129.371.149.668.988.497.0
Capital expenditure (incl. Tenke)58.857.745.942.940.239.138.139.0
Net cash (debt)2208.7308.2262.0159.2125.7107.810.2(49.3)

The Q3 2011 unaudited financial statements and management’s discussion and analysis are available on SEDAR (www.sedar.com) or the Company’s website (www.lundinmining.com).

1 Operating earnings is a Non‐IFRS measure defined as sales, less operating costs and general and administrative costs.

2 Net cash (debt) is a Non‐IFRS measure defined as available unrestricted cash less financial debt, including capital leases and other debt‐related obligations. 3 Shareholders’ equity per share is a Non‐IFRS measure defined as shareholders’ equity divided by total number of shares outstanding at the end of the period.

4 Equity ratio is a Non‐IFRS measure defined as shareholders’ equity divided by total assets at the end of the period.

5 Conversion to IFRS on January 1, 2011 requires the completion of IFRS compliant financial statements on a comparative basis for 2010. Financial results prior to 2010 remain unchanged and are reported in accordance with Canadian GAAP.

6 Income per share is determined for each quarter. As a result of using a different weighted average number of shares outstanding, the sum of the quarterly amounts may differ from the year‐to‐date amount.

About Lundin Mining 

Lundin Mining Corporation is a diversified base metals mining company with operations in Portugal, Sweden, Spain  and  Ireland,  producing  copper,  zinc,  lead  and  nickel.  In  addition,  Lundin  Mining  holds  a  development project pipeline which includes an expansion project at its Neves‐Corvo mine along with its equity stake in the world class Tenke Fungurume copper/cobalt project in the Democratic Republic of Congo.

On Behalf of the Board, 

Paul Conibear  President and CEO 

For further information, please contact:

Sophia Shane, Investor Relations North America:  +1‐604‐689‐7842 John Miniotis, Senior Business Analyst:  +1‐416‐342‐5565 Robert Eriksson, Investor Relations Sweden:  +46 8 545 015 50

Forward Looking Statements 

Certain  of  the  statements  made  and  information  contained  herein  is  “forward‐looking  information”  within  the  meaning  of  the Ontario Securities Act. Forward‐looking statements are subject to a variety of risks and uncertainties which could cause actual events or  results  to  differ  from  those  reflected  in  the  forward‐looking  statements,  including,  without  limitation,  risks  and  uncertainties relating to foreign currency fluctuations; risks inherent in mining including environmental hazards, industrial accidents, unusual or unexpected geological formations, ground control problems and flooding; risks associated with the estimation of mineral resources and  reserves  and  the  geology,  grade  and  continuity  of  mineral  deposits;  the  possibility  that  future  exploration,  development  or mining  results  will  not  be  consistent  with  the  Company’s  expectations;  the  potential  for  and  effects  of  labour  disputes  or  other unanticipated  difficulties  with  or  shortages  of  labour  or  interruptions  in  production;  actual  ore  mined  varying  from  estimates  of grade, tonnage, dilution and metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the  potential  for  unexpected  costs  and  expenses,  commodity  price  fluctuations;  uncertain  political  and  economic  environments; changes in laws or policies, foreign taxation, delays or the inability to obtain necessary governmental permits; and other risks and uncertainties, including those described under Risk Factors Relating to the Company’s Business in the Company’s Annual Information Form and in each management discussion and analysis. Forward‐looking information is in addition based on various assumptions including, without limitation, the expectations and beliefs of management, the assumed long term price of copper, nickel, lead and zinc; that the Company can access financing, appropriate equipment and sufficient labour and that the political environment where the Company operates will continue to support the development and operation of mining projects. Should one or more of these risks and  uncertainties  materialize,  or  should  underlying  assumptions  prove  incorrect,  actual  results  may  vary  materially  from  those described  in  forward‐looking  statements.  Accordingly,  readers  are  advised  not  to  place  undue  reliance  on  forward‐looking statements.