Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LUG.TO ·

LUNDIN GOLD REPORTS DISCOVERY OF BONZA SUR GOLD DEPOSIT AND EXPANSION OF ITS NEAR-MINE DRILLING PROGRAM Bonza Sur transitioning from an early-stage target to a new gold deposit

Drill Results

NEWS RELEASE

Vancouver, August 7, 2024

Lundin Gold Inc. Suite 2800, Four Bentall Centre Phone: +1 604 689 7842 lundingold.com

1055 Dunsmuir Street Fax: +1 604 689 4250 Email: [email protected]

Vancouver, BC, Canada, V7X 1L2

LUNDIN GOLD REPORTS DISCOVERY OF BONZA SUR GOLD DEPOSIT AND

EXPANSION OF ITS NEAR-MINE DRILLING PROGRAM

Bonza Sur transitioning from an early-stage target to a new gold deposit

Lundin Gold Inc. (TSX: LUG ) (Nasdaq Stockholm: LUG ) (OTCQX: LUGDF) ("Lundin Gold" or the

"Company") is pleased to announce additional drilling results from its 2024 near-mine program at Bonza

Sur, with recent drilling intercepts continuing to delineate this new gold deposit. Based on positive results

to date , the Company is increasing its near-mine drilling program in 2024 by 10,000 metres to

approximately 66,000 metres between the near-mine and regional exploration programs.

Highlights from drilling at Bonza Sur are outlined below (not true width). Detailed results are provided at

the end of this release (see Appendix 1).

Bonza Sur Exploration Highlights (not true widths):

• Drill hole BLP-2024-107 intersected 2.01 grams per tonne (“g/t”) of gold (“Au”) over 113.30 m from

6.5 m, including:

o 3.10 g/t Au over 54.80 m from 6.5m, with:

o 8.59 g/t Au over 9.0 m

• Drill hole BLP-2024-128 intersected 1.96 g/t Au over 102.60 m from 57.30 m, including:

o 3.84 g/t Au over 41.40 m from 111.3m, with:

o 7.24 g/t Au over 11.60 m

• Drill hole BLP-2024-123 intersected 1.54 g/t Au over 126.70 m from 77.10 m including:

o 4.11 g/t Au over 31.35 m from 77.10m, with:

o 13.75 /t Au over 9.00m

• Drill hole BLP-2024-133 intersected 1.01 g/t Au over 125.70 m from 0.0 m including:

o 3.32 g/t Au over 22.10 m from 86.80m, with:

o 7.81 g/t Au over 6.40m

Ron Hochstein, President and CEO, commented, “The first drill hole into Bonza Sur was in Q1 2023 and in

a short period of time, drilling has discovered a new gold deposit. The drilling program at this target

continues to develop our current understanding of Bonza Sur as a shallow higher-grade core within a wide

mineralized zone that has significant further upside . Bonza Sur is sti ll sparsely drilled and open for

expansion along strike, its width and at depth. To further delineate this target, we will be increasing our

near-mine drilling program by 10,000 metres with the intention of announcing a maiden resource at Bonza

Sur in the first half of 2025.”

2

NEAR-MINE PROGRAM

The near-mine exploration program continues to build on the unique potential of Lundin Gold’s world

class land package with 2024 being the largest drilling program ever conducted on the land package that

hosts FDN. This year, the near-mine program has already completed approximately 26,056 metres of

drilling, the vast majority of which has been at Bonza Sur.

Over recent months , drilling has expanded the Bonza Sur target to the north and at depth and results

reveal areas for further growth . A total of 6,096 metres across 16 holes was completed in the second

quarter at Bonza Sur with assay results presented in Table 1 at the end of this release. Results are still

pending for some drill holes.

Bonza Sur

What was initially discovered by drilling a geochemical soil anomaly located 1 kilometre south of the FDN

mine, Bonza Sur is now being delineated as a new gold deposit. The deposit is represented by a large

mineral envelope that starts from surface, extends continuously for more than 1.8 kilometre along strike,

is approximately 100 metres wide and extends at least 500 metres at depth (see Fig 1, 2 and 3). Since its

discovery in 2023, more than 50 drill holes have been completed with significant further potential for

expansion.

Recent results, shown in Tables 1 and 2 at the end of this release, continue to show an inner higher-grade

core associated to hydrothermal alteration with vein/veinlet zones of quartz and minor chalcedony or

manganoan-carbonate within a lower-grade gold zone represented by silica-illite and sulfides. The recent

drill hole BLP-2024-107 for example, starts in a higher-grade gold zone close to the surface (3.10 g/t Au

over 54.80m, including 8.59 g/t Au over 9.0 meters) , and is surrounded by wide disseminated gold

mineralization (2.01 g/t Au over of 113.10 m from 6.5m depth).

The distinct gold mineralization styles found at Bonza Sur are currently under review and could provide

optionality for mining. A metallurgy study is planned for 2024 and announcement of a maiden mineral

resource is expected in the first half of 2025. Currently, four rigs are turning at Bonza Sur, focused on

increasing drilling spacing in the core zone, along the south extension and at depth.

A metallurgical program has already begun for Bonza Sur and work is underway on preparation of a

resource estimate.

Drilling Program Expansion

Based on recent exploration results, the Company plans to increase its 2024 near-mine drilling program

by 10,000 metres to a minimum of 56,000 metres. This is expected to result in an estimated cost increase

of $2.0 million, which combined with the regional program, results in an estimated program cost of $44.0

million. Eleven rigs are currently turning across the conversion, near-mine and regional programs.

3

Figure 1: Bonza Sur mineral deposit location map

4

Figure 2: Bonza Sur plan view and selected results

5

Figure 3: Bonza Sur longitudinal section showing selected results

Qualified Persons

The technical information contained in this News Release has been reviewed and approved by Andre

Oliveira, P. Geo, Vice President, Exploration of the Company, who is a Qualified Person in accordance with

the requirements of National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

Samples consist of half HQ and NQ-size diamond core that are split by diamond saw on site, prepared at

the ALS laboratory in Quito, and analysed by 50g fire assay and multi -element (ICP-AES/ICP-MS) at the

ALS Laboratory in Lima, Peru. The quality assurance -quality control (QA -QC) program of Lundin Gold

includes the insertion of certified standards of known gold content, blank and duplicate samples. The

remaining half core is retained for verification and reference purposes. For further information on the

assay, QA-QC and data verification procedures, please see Lundin Gold’s Annual Information Form dated

March 26, 2024, filed under the Company’s profile at www.sedarplus.ca.

About Lundin Gold

Lundin Gold, headquartered in Vancouver, Canada, owns the Fruta del Norte gold mine in southeast

Ecuador. Fruta del Norte is among the highest-grade operating gold mines in the world.

The Company's board and management team have extensive expertise in mine operations and are

dedicated to operating Fruta del Norte responsibly. The Company operates with transparency and in

accordance with international best practices. Lundin Gold is committed to delivering value to its

shareholders, while simultaneously providing economic and social benefits to impac ted communities,

fostering a healthy and safe workplace and minimizing the environmental impact. The Company believes

that the value created t hrough the development of Fruta del Norte will benefit its shareholders, the

Government and the citizens of Ecuador.

6

Additional Information

The information in this release is subject to the disclosure requirements of Lundin Gold under the EU

Market Abuse Regulation. This information was publicly communicated on August 7, 2024 at 2:00 p.m.

Pacific Time through the contact persons set out below.

For more information, please contact

Ron F. Hochstein Finlay Heppenstall

President and CEO Director, Investor Relations and Corporate Development

Tel (Ecuador): +593 2-299-6400 Tel: +1 604 806 3089

Tel (Canada): +1-604-806-3589 [email protected]

[email protected]

Caution Regarding Forward-Looking Information and Statements

Certain of the information and statements in this press release are considered "forward-looking information" or "forward-looking

statements" as those terms are defined under Canadian securities laws (collectively referred to as "forward-looking statements").

Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections,

objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as "believes",

"anticipates", "expects", "is expected", "scheduled", "estimates", "pending", "intends", "plans", "forecasts", "targets", or "hopes",

or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "will",

"should" "might", "will be taken", or "occur" and similar expressions) are not statements of historical fact and may be forwa rd-

looking st atements. By their nature, forward -looking statements and information involve assumptions, inherent risks and

uncertainties, many of which are difficult to predict, and are usually beyond the control of management, that could cause actual

results to be mat erially different from those expressed by these forward -looking statements and information. Lundin

Gold believes that the expectations reflected in this forward-looking information are reasonable, but no assurance can be given

that these expectations will prove to be correct. Forward-looking information should not be unduly relied upon. This information

speaks only as of the date of this press release, and the Company will not necessarily update this information, unless required to

do so by securities laws.

This press release contains forward-looking information in a number of places, such as in statements relating to the Company’s

exploration plans, activities and results , including the plans to release a resource estimate on Bonza Sur . There can be no

assurance that such statements will prove to be accurate, as Lundin Gold's actual results and future events could differ materially

from those anticipated in this forward -looking information as a result of the factors discussed in the "Risk Factors" sectio n

in Lundin Gold's Annual Information Form dated March 26, 2004 , which is available at www.lundingold.com or

www.sedarplus.ca.

Lundin Gold's actual results could differ materially from those anticipated. Factors that could cause actual results to differ

materially from any forward-looking statement or that could have a material impact on the Company or the trading price of its

shares include: instability in Ecuador; community relations; forecasts relating to production and costs; mining operations;

security; non-compliance with laws and regulations and compliance costs; tax changes in Ecuador; waste disposal and tailings;

government or regulato ry approvals; environmental compliance; gold price; infrastructure; dependence on a single mine;

exploration and development; control of Lundin Gold; availability of workforce and labour relations; dividends; information

systems and cyber security; Mineral Reserve and Mineral Resource estimates; title matters and surface rights and access; health

and safety; human rights; employee misconduct; measures to protect biodiversity; endangered species and critical habitats;

global economic conditions; shortages of critical resources; competition for new projects; key talent recruitment and retention;

market price of the Company’s shares; social media and reputation; insurance and uninsured risks; pandemics, epidemics or

infectious disease outbreak; climate change; illegal mining; conflicts of interest; ability to maintain obligations or comply with

debt; violation of anti-bribery and corruption laws; internal controls; claims and legal proceedings; and reclamation obligations.

7

APPENDIX 1

Table 1: Drillhole assay results from the near-mine drilling program at Bonza Sur reported for thickness

versus grade intervals above 14 (m x g/t Au >14). Drill hole intercepts are reported in drill core lengths

Hole ID Type From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Target Zone

AMN-2024-110 548.7 554.7 6 3.43 1.08

AMN Surface

AMN-2024-110 including 552.7 554.7 2 9.2 2.35

AMN-2024-124 138.1 152.4 14.3 0.46 16.97

AMN Surface

AMN-2024-124 including 143.5 144.5 1 2.58 79.2

AMN-2024-131 58.5 79.35 20.85 0.99 1.40 AMN Surface

BLP-2024-106 417.6 424.5 6.9 2.41 8.83

Bonza Sur Surface

BLP-2024-106 including 421.8 424.5 2.7 5.63 15.14

BLP-2024-107 6.5 119.8 113.3 2.01 8.24

Bonza Sur Surface

BLP-2024-107 including 6.5 61.3 54.8 3.1 8.32

BLP-2024-107 with 6.5 15.5 9 8.59 19.86

BLP-2024-107 with 52.2 62.3 10.1 6.42 7.27

BLP-2024-108 25.4 27.2 1.8 2.8 2.95

Bonza Sur Surface

BLP-2024-108 75.7 76.7 1 1.09 19.55

BLP-2024-111 58.4 63.2 4.8 2.11 5.79

Bonza Sur Surface

BLP-2024-111 including 60.2 62.2 2 3.37 6.11

BLP-2024-112 No Significant Results Bonza Sur Surface

BLP-2024-115 73.4 187.7 114.3 1.31 6.14

Bonza Sur Surface

BLP-2024-115 including 146.4 172.2 25.8 3.18 10.6

BLP-2024-115 with 147.3 151.7 4.4 4.99 22.04

BLP-2024-115 with 170.2 173.2 3 5.98 8.96

BLP-2024-116 225.8 319.1 93.3 1.21 37.86

Bonza Sur Surface

BLP-2024-116 including 266.2 319.1 52.9 1.96 62.22

BLP-2024-116 with 268.1 271.2 3.1 5.87 92.1

BLP-2024-116 with 301.1 306.05 4.95 4.43 136.73

BLP-2024-118 258.85 400 141.15 1.06 43.76

Bonza Sur Surface BLP-2024-118 including 273.25 301.3 28.05 3.09 28.48

BLP-2024-118 with 292 296 4 18.54 101.3

BLP-2024-119 No Significant Results Bonza Sur Surface

BLP-2024-123 77.1 203.8 126.7 1.54 9.84

Bonza Sur Surface BLP-2024-123 including 77.1 108.45 31.35 4.11 7.91

BLP-2024-123 with 77.1 86.1 9 13.75 12.4

BLP-2024-128 57.3 159.9 102.6 1.96 10.45

Bonza Sur Surface

BLP-2024-128 including 111.3 152.7 41.4 3.84 15.62

8

BLP-2024-128 with 133 144.6 11.6 7.24 14.66

BLP-2024-130 5 33.8 28.8 1.1 5

Bonza Sur Surface BLP-2024-130 including 21.3 23 1.7 3.63 7.74

BLP-2024-130 46.3 59.5 13.2 0.77 3.31

BLP-2024-133 0 125.7 125.7 1.01 4.67

Bonza Sur Surface

BLP-2024-133 including 86.8 108.9 22.1 3.32 8.56

BLP-2024-133 with 86.8 93.2 6.4 7.81 7.23

BLP-2024-133 with 104.8 108.9 4.1 4.15 24.38

BLP-2024-133 260.1 261.1 1 3.12 5.72

BLP-2024-140 Pending Results Bonza Sur Surface

BLP-2024-141 Pending Results Bonza Sur Surface

BLP-2024-143 Pending Results Bonza Sur Surface

BLP-2024-143-D1 Pending Results Bonza Sur Surface

Table 2: Bonza Sur Collar Drill Holes

Hole ID Target Easting Northing Elevation Azimuth Dip EOH (m) Drilling Type Year

AMN-2024-110 Aguas Mesas 778824 9579707 1685 270 -50 581.25 Surface 2024

AMN-2024-124 Aguas Mesas 778827 9579707 1685 89 -44 404.20 Surface 2024

AMN-2024-131 Aguas Mesas 778823 9579707 1685 270 -40 553.35 Surface 2024

BLP-2024-112 Bonza Sur 778297 9581430 1461 84 -40 240.20 Surface 2024

BLP-2024-115 Bonza Sur 778625 9580996 1504 265 45 269.15 Surface 2024

BLP-2024-116 Bonza Sur 778652 9581179 1521 255 52 340.00 Surface 2024

BLP-2024-118 Bonza Sur 778626 9580996 1504 265 65 408.20 Surface 2024

BLP-2024-119 Bonza Sur 778295 9581430 1461 120 -64 451.00 Surface 2024

BLP-2024-123 Bonza Sur 778613 9580905 1508 270 -48 236.60 Surface 2024

BLP-2024-128 Bonza Sur 778343 9581540 1461 95 -50 436.35 Surface 2024

BLP-2024-130 Bonza Sur 778575 9580790 1501 270 -66 342.10 Surface 2024

BLP-2024-133 Bonza Sur 778576 9580790 1499 270 -72 449.70 Surface 2024

BLP-2024-140 Bonza Sur 778616 9580904 1508 88 -67 500.75 Surface 2024

BLP-2024-141 Bonza Sur 778688 9580440 1578 89 -70 323.20 Surface 2024

BLP-2024-143 Bonza Sur 778816 9581523 1449 269 -45 198.70 Surface 2024

BLP-2024-143-D1 Bonza Sur 778816 9581523 1449 269 -45 361.30 Surface 2024