LUNDIN GOLD ADDS 1.58 MILLION OUNCES OF GOLD TO FRUTA DEL NORTE ORIGINAL MINERAL RESERVES, MORE THAN REPLACING MINED MINERAL RESERVES SINCE THE BEGINNING OF OPERATIONS Updated Mineral Reserves at Fruta del Norte of 5.02 million ounces
NEWS RELEASE
Vancouver, February 27, 2023
Lundin Gold Inc. 885 West Georgia Street, Suite 2000 Phone: +1 604 689 7842 lundingold.com
Vancouver, BC, V6C 3E8 Fax: +1 604 689 4250 Email: [email protected]
LUNDIN GOLD ADDS 1.58 MILLION OUNCES OF GOLD TO FRUTA DEL NORTE ORIGINAL
MINERAL RESERVES, MORE THAN REPLACING MINED MINERAL RESERVES SINCE THE
BEGINNING OF OPERATIONS
Updated Mineral Reserves at Fruta del Norte of 5.02 million ounces
Lundin Gold Inc. (TSX: LUG) (Nasdaq Stockholm: LUG) (OTCQX: LUGDF) ("Lundin Gold" or the "Company") is
pleased to announce its updated estimates of Mineral Resources (“Resources”) and Mineral Res erves
(“Reserves”) as at December 31, 2022 for its Fruta del Norte gold mine (“FDN”) in Ecuador . The updated
estimate builds from the Company’s previously reported estimates of Resources and Reserves as at April 30,
2016 (“2016 estimate”)1. The tables of the updated Resources and Reserves can be found at the end of this
release. All amounts are in U.S. dollars unless otherwise indicated.
Highlights
• Measured and Indicated (“M&I”) Resources are reported at 23.0 million tonnes (“ Mt”) with an average
grade of 9.20 grams per tonne (“g/t”) containing 6.8 million ounces (“Moz”) of gold.
• A total of 9.3 Mt with an average grade of 12.09 g/t containing 3.6 Moz of gold are now categorized as
Measured Resources as a result of an improved understanding of the deposit geology. The Company
reported no estimates of Measured Resources in the 2016 estimate.
• Proven and Probable Reserves for FDN are reported at 18.0 Mt with an average grade of 8.68 g/t
containing 5.0 Moz of gold.
• With this update, Lundin Gold has replace d all Reserves mined from the beginning of operations in late
2019 and added additional Reserves.
Figure 1: Waterfall Chart Comparing 2016 Mineral Reserves Estimate and 2022 Mineral Reserves
1 For details of the 2016 estimate, please refer to the technical report entitled “Fruta del Norte Project Ecuador NI 43-101 Technical Report on
Feasibility Study”, dated June 2016 with an effective date of April 30, 2016, filed on SEDAR under the Company’s profile at www.sedar.com.
4.82 Moz 5.02 Moz
- 1.38 Moz
+ 1.58 Moz
2016 Technical Report Mine Depletion Additions 2022 Reserves
2
• In addition, the new estimate includes Reserves in the Proven category which demonstrates greater
confidence in the updated Reserves.
• Expansion of Proven and Probable Reserves into the southern portion of the deposit underlines the
significant potential for further Reserve replacement from additional drilling in this sector.
Ron Hochstein, President and CEO, commented, “I am pleased to announce that the Company has successfully
replaced all mined Reserves since the beginning of operations and added additional Reserves, a significant
achievement for a large scale producing asset like FDN. These results demonstrate the exceptional value we
have added through our conversion drilling program. Importantly, there are still 1.7 Moz of Inferred Resources
at FDN, which we believe will play a significant role in continuing to replace production in the future. We expect
that this updated Resource and Reserve estimate is only the first step in continuing to expand the total minable
ounces of gold, allowing Fruta del Norte to continue production for many years to come.”
A technical report for FDN, prepared in accordance with NI 43 -101, will be filed under the Company’s profile
on SEDAR at www.sedar.com on or before March 31, 2023.
Mineral Resources Update
Advancing Lundin Gold’s strategy of replacing production, M&I Resources are reported at 23.0 Mt with an
average grade of 9.20 g/t containing 6.8 Moz of gold, including a total of 9.3 Mt with an average grade of 12.09
g/t containing 3.6 Moz of gold now categorized as Measured Resources, the result of improved confidence of
the deposit geology, in part due to the operational maturity of FDN (see Figure 2).
The Company’s estimate of Inferred Resources totals 9.2 Mt with an average grade of 5.64 g/t containing 1.7
Moz of gold. The Company is planning to carry out additional conversion drilling in 2023 and 20 24 targeting
the remaining 1.7 Moz of Inferred Resources. Through this drilling, the Company will endeavour to recategorize
these Resources and eventually add to Mineral Reserves. These Inferred Resources are located primarily in the
Southern area as well as some to the North.
Figure 2: 2016 Indicated and Inferred Resources1,2 compared to 2022 M&I and Inferred Resource3
3.6 Moz
7.3 Moz
3.2 Moz
2.1 Moz
1.7 Moz
0
1
2
3
4
5
6
7
8
9
10
2016 2022
Measured Resources Indicated Resources Inferred Resources
3
Notes:
(1) The Company did not estimate Measured Resources in the 2016 estimate.
(2) Indicated Mineral Resources were reported inclusive of Mineral Reserves.
(3) Measured and Indicated Mineral Resources are reported inclusive of Mineral Reserves.
Mineral Resources, inclusive of Mineral Reserves as at December 31, 2022
Mineral Resources(1)(2)(3)(4)(5(6)
Category Tonnage
(M t)
Grade
(g/t Au)
Contained Metal
(M oz Au)
Grade
(g/t Ag)
Contained
Metal
(M oz Ag)
Measured 9.30 12.09 3.60 12.80 3.80
Indicated 13.70 7.25 3.20 11.60 5.10
Measured & Indicated 23.00 9.20 6.80 12.10 8.90
Inferred 9.20 5.64 1.70 11.80 3.50
Notes:
(1) 2014 CIM Definitions Standards were followed for the classification of Mineral Resources.
(2) The Qualified Person for the estimate is Dorota El-Rassi, MSc., P.Eng ., an employee of SLR Consulting. The estimate
has an effective date of December 31, 2022.
(3) Measured and Indicated Mineral Resources are reported inclusive of Mineral Reserves. Mineral Resources that are
not Mineral Reserves do not have demonstrated economic viability.
(4) Inferred Mineral Resources are considered too speculative geologically to have economic considerations applied to
them to enable them to be categorized as Mineral Reserves.
(5) Mineral Resources are reported at a cut-off grade of 3.4 g/t Au; which was calculated using a long term gold price of
US$1,600/oz and metallurgical recovery of 88.5%.
(6) Mineral Resources are reported net of mined out shapes to December 31, 2022
(7) Numbers may not add due to rounding.
Mineral Reserves Update
With this updated estimate, Lundin Gold has more than replaced depletion of approximating 1.38 Moz of gold
from mining activities since the beginning of operations at FDN two and a half years ago. Results from the
conversion drilling program have contributed to an improved understanding of the strong geological and grade
continuity at FDN allowing for the inclusion of 3.4 Moz in the Proven Reserve category . Proven and Probable
Reserves for FDN are reported at 18.0 Mt with an average grade of 8.68 g/t containing 5.0 Moz of gold, a n
increase of approximately 4.2% from the 2016 estimate.
4
Comparison of Mineral Reserves Estimates
Comparison of Reserve Estimates(3)(4)(5)(6)(7)
Tonnage
(M t)
Grade
(g/t Au)
Contained Metal
(M oz Au)
Grade
(g/t Ag)
Contained Metal
(M oz Ag)
2016 Reserve(1)
Proven 0 0 0 0 0
Probable 15.49 9.67 4.82 12.7 6.34
Total 15.49 9.67 4.82 12.7 6.34
2022 Reserve(2)
Proven 10.75 9.95 3.44 11.6 4.00
Probable 7.23 6.81 1.58 11.2 2.60
Total 17.98 8.68 5.02 11.4 6.594
Notes:
(1) For details of the 2016 estimate, see the technical report entitled “Fruta del Norte Project Ecuador NI 43-101 Technical
Report on Feasibility Study”, dated June 2016 with an effective date of April 30, 2016, filed on SEDAR under the
Company’s profile at www.sedar.com.
(2) The Qualified Person for the estimate is Jason Cox, P.Eng., an employee of SLR Consulting. The estimate has an
effective date of December 31, 2022.
(3) Mineral Reserves were estimated using key inputs listed in the table below:
Key Input 2016 Technical
Report
December 31,
2022 Unit
Gold Price 1,400 1,400 $/oz
Transverse Stoping Mining Cost 61 51 $/t
Drift & Fill Mining Cost 80 77 $/t
Process, Surface Ops, G&A Cost 75.8 64 $/t
Dilution Factor 8 8 Percent
Concentrate Transport & Treatment 65.9 80 $/oz
Royalty 77 76 $/oz
Gold Metallurgical Recovery 93.9 88.5 Percent
(4) Gold cut-off grades for the different mining methods are listed in the table below:
Gold Cut-off Grade 2016 Technical
Report
December 31,
2022 Unit
Transverse Stope 4.7 4.2 g/t
Drift and Fill 5.3 5.0 g/t
(5) Silver was not considered in the calculation of the cut-off grade.
(6) Tonnages are rounded to the nearest 1,000 t, gold grades are rounded to two decimal places, and silver grades are
rounded to one decimal place. Tonnage and grade measurements are in metric units; contained gold and silver are
reported as thousands of troy ounces.
(7) Rounding as required by reporting guidelines may result in summation differences.
Qualified Persons
In this news release, the Qualified Person for the Mineral Resource estimate is Dorota El -Rassi, MSc., P.Eng.,
an employee of SLR Consulting, and the Qualified Person for the Mineral Reserve estimate is Jason Cox, P.Eng.,
an employee of SLR Consulting.
5
The technical information contained in this News Release has been reviewed and approved by Ron Hochstein,
P. Eng., Lundin Gold’s President and CEO, and by Andre Oliveira, P. Geo, Lundin Gold’s Vice President,
Exploration, both of whom are Qualified Persons in accordance with the requirements of NI 43-101.
About Lundin Gold
Lundin Gold, headquartered in Vancouver, Canada, owns the Fruta del Norte gold mine in southeast Ecuador.
Fruta del Norte is among the highest-grade operating gold mines in the world.
The Company's board and management team have extensive expertise in min e operations and are dedicated
to operating Fruta del Norte responsibly. The Company operates with transparency and in accordance with
international best practices. Lundin Gold is committed to delivering value to its shareholders, while
simultaneously providing economic and social benefits to impacted communities, fostering a healthy and safe
workplace and minimizing the environmental impact. The Company believes that the value created through
the development of Fruta del Norte will benefit its shareholders, the Government and the citizens of Ecuador.
Additional Information
The information in this release is subject to the disclosure requirements of Lundin Gold under the EU Market
Abuse Regulation. This information was publicly communicated on February 27, 2023 at 5:00 a.m. Pacific Time
through the contact persons set out below.
For more information, please contact
Ron F. Hochstein Finlay Heppenstall
President and CEO Director, Investor Relations
Tel (Ecuador): +593 2-299-6400 Tel: +1 604 806 3089
Tel (Canada): +1-604-806-3589 [email protected]
Caution Regarding Forward-Looking Information and Statements
Certain of the information and statements in this press release are considered "forward -looking information" or "forward -looking
statements" as those terms are defined under Canadian securities laws (collectively referred to as "forward -looking statements"). Any
statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, object ives,
assumptions or future events or performance (often, but not always, identified by words or phrases such as "believes", "anticipates",
"expects", "is expected", "scheduled", "estimates", "pending", "intends", "plans", "forecasts", "targets", or "hopes", or variations of such
words and phrases or statements that certain actions, events or results "may", "could", "would", "will", "should" "might", "will be taken",
or "occur" and similar expressions) are not statements of historical fact and may be forward -looking statements. By their nature,
forward-looking statements and information involve assumptions, inherent risks and uncertainties, many of which are difficult to predict,
and are usually beyond the control of management, that could cause actual results to be materially different from those expre ssed by
these forward -looking statements and information. Lundin Gold believes that the expectations reflected in this forward -looking
information are reasonable, but no assurance can be given that these expectations will prove to be correct. Forward-looking information
should not be unduly relied upon. This information speaks only as of the date of this press release, and the Company will not necessarily
update this information, unless required to do so by securities laws.
This press release contains forward -looking information in a number of places, such as in statements relating estimates of mineral
resource and reserves, the anticipated filing of a technical report and the Company’s strategy to replace mining depletion in the future
There can be no assurance that such statements will prove to be accurate, as Lundin Gold's actual results and future events could differ
materially from those anticipated in this forward-looking information as a result of the factors discussed in the "Risk Factors" section in
Lundin Gold's Management Discussion & Analysis dated February 23, 2023, which is available at www.lundingold.com or on SEDAR.
Lundin Gold's actual results could differ materially from those anticipated. Factors that could cause actual results to diffe r materially
from any forward-looking statement or that could have a material impact on the Company or the trading price of its shares include: risks
related to political and economic instability in Ecuador; risks associated with the Company's community relationships; risks related to
6
estimates of production, cash flows and costs; risks inherent to mining operations; shortages of critical supplies; control of the Company's
largest shareholders; volatility in the price of gold; failure of the Company to maintain its obligations under its debt facilities; risks related
to Lundin Gold’s compliance with environmental laws and liability for environmental contamination; the lack of availability of
infrastructure; the Company's reliance on one mine; security risks to the Company, its assets and its personnel; risks related to illegal
mining; exploration and development risks; the impacts of a pandemic virus outbreak; risks related to the Company’s ability to obtain,
maintain or renew regulatory approvals, permits and licenses; uncertainty with and changes to the tax regime in Ecuador; the reliance
of the Company on its information systems and the risk of cyber -attacks on those systems; the imprecision of Mineral Reserve and
Resource estimates; deficient or vulnerable title to concessions, easements and surface rights; inherent safety hazards and risk to the
health and safety of the Company’s employees and contractors; risks related to the Company’s workforce and its labour relations; key
talent recruitment and retention of key personnel; volatility in the market price o f the Company’s shares; measures to protect
endangered species and critical habitats; social media and reputation; the cost of non-compliance and compliance costs; the adequacy
of the Company’s insurance; risks relating to the declaration of dividends; uncertainty as to reclamation and decommissioning; the ability
of Lundin Gold to ensure compliance with anti-bribery and anti-corruption laws; the uncertainty regarding risks posed by climate change;
limits of disclosure and internal controls; the potential for litigation; and risks due to conflicts of interest.