Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LUCA.V ·

Telson Grants Stock Options to New Directors

Share Capital & Compensation

Telson Mining Corporation

1000 – 1111 Melville Street

Vancouver, BC, V6E 3V6,

Canada

TSX.V: TSN

Page 1 of 2

Telson Grants Stock Options to New Directors

Vancouver, British Columbia, May 19, 2021

Telson Mining Corporation (TSXV: TSN) (OTC Pink: SOHFF) (FSE: TSGN) ("Telson" or the "Company" announces that

pursuant to its Stock Option Plan, it has granted incentive stock options to newly appointed directors totalling

2,000,000 shares in the capital stock of the Company. The options will be exercisable at a price of $0.45 per share

for a period of 5 years. The options will vest under the terms of the Compa ny’s Stock Option Plan with one-third

vesting immediately, one-third within 6 months, and the remaining balance will vest a t the 1st anniversary of the

grant of the option.

About Telson Mining Corporation

Telson Mining Corporation is a Canadian based mining company with two 100% owne d Mexican gold, silver, and

base metal mining projects.

Telson's Tahuehueto mining proj ect is in north -western Durango State, Mexico where construction has been

advanced to an estimated 60% of completion. Upon closing of the recently announced US$25 millio n funding

package, Telson will have funding available to finish construction of its 1,000 tonne per day processing facility and

related mine infrastructure to initiate production of gold, silver, lead, and zinc in concentrates at Tahuehueto. The

Company is targeting to start pre-production by the end of 2021 and ramping up to full production capacity during

Q1 2022.

Campo Morado is an operating polymetallic base metal mine with mining and milling equipment currently

producing at an average of 2,150 tonnes per day and is currently estimated to be Mexico’s 6th largest zinc

producer.

Visit: www.telsonmining.com

On Behalf of the Board of Directors

(signed) “Ralph Shearing”

Ralph Shearing, P. Geol, President and Director

Cautionary Note Regarding Production Decisions and Forward-Looking Statements

It should be noted that Telson declared commercial production at Campo Morado prior to completing a feasibility study of

mineral reserves demonstrating eco nomic and technical viability. Accordingly, readers should be cautioned that Telson’s

production decision has been made without a comprehensive feasibility study of established reserves such that there is greater

risk and uncertainty as to future economic results from the Campo Morado mine and a higher technical risk of failure than

would be the case if a feasibility study were completed and relied upon to make a production decision. Telson has completed

a preliminary economic assessment (“PEA”) mining stud y on the Campo Morado mine that provides a conceptual life of mine

plan and a preliminary economic analysis based on the previously identified mineral resources (see News Release dated

November 8, 2017, and April 4,2018).

Telson Mining Corporation

1000 – 1111 Melville Street

Vancouver, BC, V6E 3V6,

Canada

TSX.V: TSN

Page 2 of 2

Statements contained in this news release that are not historical facts are “forward -looking information” or “forward -looking

statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities laws. Forward

Looking Information includes, but is not limited to, disclosure regarding the planned recommencement of mining operationsty6

at Campo Morado; and other possible events, conditions or financial performance that are based on assumptions about future

economic conditions and courses of action; the timing and costs of future activities on the Company’s properties, such as

production rates and increases; success of exploration, development and bulk sample processing activities, and timing for

processing at its own mineral processing facility on the Tahuehueto project site. In certain cases, Forward-Looking Information

can be identified using words and phra ses such as “plans,” “expects,” “scheduled,” “estimates,” “forecasts,” “intends,”

“anticipates” or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the

Company has applied several material assumptions, including, but not limited to, that the current exploration, development,

environmental and other objectives concerning the Campo Morado Mine and the Tahuehueto Project can be achieved; that

recommencement of operations at Campo Morado will proceed as pl anned; the continuity of the price of gold and other

metals, economic and political conditions, and operations. Forward -Looking Information involves known and unknown risks,

uncertainties and other factors which may cause the actual results, performance, o r achievements of the Company to be

materially different from any future results, performance or achievements expressed or implied by the Forward -Looking

Information. There can be no assurance that Forward -Looking Information will prove to be accurate, as actual results and

future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue

reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release

publicly any revisions to Forward -Looking Information contained in this news release to reflect events or circumstances after

the date hereof or to reflect the occurrence of unanticipated events.

Neither TSX Venture Exchange nor its Regulation S ervices Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information about Telson Mining Corporation, please contact:

Glen Sandwell

Corporate Communications Manager

[email protected]

Tel: +1 (604) 684-8071